Loading...
HomeMy WebLinkAboutNCS000396_APPLICATION_20030304STORMWATER DIVISION CODING SHEET M54 PERMITS PERMIT NO. /\[c 0 U 0 DOC TYPE ❑FIN/AL PERMIT fl Q7VNUAL REPORT �H�APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ �U6 3J ?)6fV i YYYYMMDD Ir4 State of North Carolina Department of Environment & Natural Resources Division of Water Quality Date Reed 03 -o4-u3 Fee Paid Permit Number IUCSUvv 3iCn N-PDES_STMItMW_ ATER_PERMIT APPLICATION FORM This application form is for use by public bodies seeking NPDES stormwater permit coverage for Regulated Public Entities (RPE) pursuant to Title 15A North Carolina Administrative Code 2H .0126. A complete application package includes this form and three copies of the narrative documentation required in Section X of this form. This application form, completed in accordance with Instructions for completing NPDES Small M54 Srormwater Permit Application (SWU-270) and the accompanying narrative documentation, completed in ccordance with Instructions for Preparing the Comprehensive Stormwater Management Program Report4(=�iare both required for the application package to be considered a complete application submittal.iication submittals may be returned to the applicant. I. APPLICANT STATUS INFORMATION a. !Name of Public Entity Seeking Permit Coverage City of Goldsboro r' , b. Ownership Status (federal, state or local) Local c. Type of Public Entity (city, town, county, prison, school, etc. City d. Federal Standard Industrial Classification Code SIC 91 - 97 e. County(s) Wayne f. Jurisdictional Area (square miles Municipal Area: 26 square miles. ETJ: 32 square miles. g. Population Permanent 38,516 (July 2001 estimate) Seasonal (if available) NA h. Ten-year Growth Rate -0.41% per year (1990 census and 2000 census) i. Located on Indian Lands? ❑ Yes ® No II. RPE / MS4 SYSTEM INFORMATION 'fY -14 a. Storm Sewer Service Area (square miles 26 square miles b. River Basin(s) Neuse River Basin c. Number of Primary Receiving Streams 8 d. Estimated percentage of jurisdictional area containing the following four land use activities: • Residential 47% • Commercial 12% • Industrial 14% • Open Space 2791b Total = 100% e. Are there. significant water quality issues listed in the attached application report? [4 Yes ❑ No Pau 2 NPDES RPE Stormwater Permit Application III. EXISTING LOCAL WATER QUALITY PROGRAMS a. Local Nutrient Sensitive Waters Strategy ® Yes ❑ No b. Local Water Supply Watershed Program Z Yes ❑ No c. Delegated Erosion and Sediment Control Program ❑ Yes No d. CAMA Land Use Plan ❑ Yes No IV. CO -PERMIT APPLICATION STATUS INFORMATION (Complete this section only if co -permitting) a. Do you intend to co -permit with ❑ Yes ® No a permitted Phase I entity? b. If so, provide the name and permit number of that entity: • Name of Phase I MS4 • NPDES Permit Number c. Do you intend to co -permit ❑ Yes % No with another Phase II enti ? d. If so, provide the name(s) of the entity: e. Have legal agreements been finalized between the co- ❑ Yes ❑ No rmittees? V. RELIANCE ON ANOTHER ENTITY TO SATISFY ONE OR MORE OF YOUR PERMIT OBLIGATIONS (If more than one, attach additional sheets) a. Do you intend that another entity perform one or more of our permit obligations? R Yes ❑ No b. If yes, identify each entity and the element they will be implementing • Name of Entity NCDENR, Land Quality Section • Element they will implement Erosion and sediment control • Contact Person F. Mel Nevlis, Chief, Land Quality Section • Contact Address NCDENR, 1612 Mail Service Center, Raleigh, NC 27699-1612 • Contact Telephone Number 919-733-4574 c. Are legal agreements in place to establish responsibilities? Yes ❑ No VI. DELEGATION OF AUTHORITY (OPTIONAL) The signing official may delegate permit implementation authority to an appropriate staff member. This delegation must name a specific person and position and include documentation of the delegation action through board action. a. Name of person to which permit authority NA has been del ated b. Title/position of person above c. Documentation of board action delegating permit authority to this person/position must be rovided in the attached application report. Paoe 2 NPDES RPE Stormwater Permit Application VII. SIGNING OFFICIAL'S STATEMENT Please see the application instructions to determine who has signatory authority for this permit application. If authority for the NPDES stormwater permit has been appropriately delegated through board action and documented in this permit application, the person/position listed in Section VI above may sign the official statement below. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing ' lations Signature , 4) Y�L� Name Alfonzo King Title Mayor Street Address 214 North Center Street' PO Box Drawer A City Goldsboro State NC Zip 27533 Telephone 919-580-4330 Fax 919-580-4344 E-Mail VIII. MS4 CONTACT INFORMATION Provide the following information for the person/position that will be responsible for day to day implementation and oversight of the stormwater program. a. Name of Contact Person Terry Gallimore b. Title City Engineer c. Street Address 214 North Center Street d. PO Box Drawer A e. City Goldsboro f. State NC g. Zip 27533 h. Telephone Number 919-580-4342 i. Fax Number 919-S80-431S j. E-Mail Address tgallimore@ci.goldsboro.nc.us Paae 3 NPDES RPE Stormwater Permit Application IX. PERMITS AND CONSTRUCTION APPROVALS List permits or construction approvals received or applied for under the following programs. Include contact name if different than the person listed in Item VIII. If further space needed, attach additional sheets. a. RCRA Hazardous Waste NA Management Program NA b. UIC program under SDWA c. NPDES Wastewater Discharge N00023949 Permit Number d. Prevention of Significant NA Deterioration (PSD) Program NA e. Non Attainment Program f. National Emission Standards for NA Hazardous Pollutants (NESHAPS) reconstruction approval g. Ocean dumping permits under the N/A Marine Protection Research and Sanctuaries Act h. Dredge or fill permits under NA section 404 of CWA X. NARRATIVE APPLICATION SUPPLEMENT: STORMWATER MANAGEMENT PROGRAM REPORT Attach three copies of a comprehensive report detailing the proposed stormwater management program for the five-year permit term. The report shall be formatted in accordance with the Table of Contents shown below. The required narrative information for each section is provided in the Instructions for Preparing the Comprehensive Stormwater Management Program Report (SWU-268). The report must be assembled in the following order, bound with tabs identifying each section by name, and include a Table of Contents with page numbers for each entry. 1. STORM SEWER SYSTEM INFORMATION 1.1. Population Served 1.2. Growth Rate 1.3. Jurisdictional and MS4 Service Areas 1.4. MS4 Conveyance System 1.5. Land Use Composition Estimates 1.6. Estimate Methodology 1.7. TMDL Identification 2. RECEIVING STREAMS TABLE OF CONTENTS Paae 4 NPDES RPE Stormwater Permit Application 3. EXISTING WATER QUALITY PROGRAMS 3.1. Local Programs 3.2. State programs 4. PERMITTING INFORMATION 4.1. Responsible Party Contact List 4.2. Organizational Chart 4.3. Signing Official 4.4. Duly Authorized Representative 5. Co -Permitting Information (if applicable) 5.1. Co-Permittees 5.2. Legal Agreements 5.3. Responsible Parties 6. Reliance on Other Government Entity 6.1. Name of Entity 6.2. Measure Implemented 6.3. Contact Information 6.4. Legal Agreements 7. STORMWATER MANAGEMENT PROGRAM 7.1. Public Education and Outreach on Storm Water Impacts 7.2. Public Involvement and Participation 7.3. Illicit Discharge Detection and Elimination 7.4. Construction Site Stormwater Runoff Control 7.5. Post -Construction Storm Water Management in New Development and Redevelopment 7.6. Pollution Prevention/Good Housekeeping for Municipal Operations Page 5 0 1 1 1 1 City of Goldsboro Stormwater Management Program Report To accompany the NPDES Stormwater Permit Application Prepared by: '7CLP Services, P.C. March 4, 2003 TABLE OF CONTENTS I. STORM SEWER SYSTEM INFORMATION.......................................................... 1. 1. Population Served....................................................................................................... 1 1.2. Growth Rate................................................................................................................ 1 1.3. Jurisdictional and MS4 Service Areas........................................................................ 1 1.4. MS4 Conveyance System........................................................................................... 1 1.5. Land Use Composition Estimates............................................................................... 1 1.6. Estimate Methodology................................................................................................ 1 1.7. TMDL Identification.... ......... ..................................................................................... I 2. RECEIVING STREAMS........................................................................................... 2 3. EXISTING WATER QUALITY PROGRAMS......................................................... 3 3.1. Local Programs........................................................................................................... 3 3.2. State programs............................................................................................................ 3 4. PERMITTING INFORMATION............................................................................... 4 4.1. Responsible Party Contact List................................................................................... 4 4.2. Organizational Chart ................................................................................................... 4 4.3. Signing Official........................................................................................................... 5 4.4. Duly Authorized Representative................................................................................. 5 5. CO -PERMITTING INFORMATION........................................................................ 6 6. RELIANCE ON OTHER GOVERNMENT ENTITY ............................................... 7 6.1. Name of Entity............................................................................................................ 7 6.2. Measure Implemented................................................................................................. 7 6.3. Contact Information.................................................................................................... 7 6.4. Legal Agreements....................................................................................................... 7 7. STORMWATER MANAGEMENT PROGRAM ...................................................... 8 7.1. Public Education and Outreach on Storm Water Impacts .......................................... 8 7.2. Public Involvement and Participation......................................................................... $ 7.3. Illicit Discharge Detection and Elimination............................................................... 9 7.4. Construction Site Stormwater Runoff Control........................................................... 9 7.5. Post -Construction Storm Water Management in New Development and Redevelopment................................................................................................................... 9 7.6. Pollution Prevention/Good Housekeeping for Municipal Operations ...................... 11 TABLES 'fable 2.1 Neuse River Basin...............................................................................................2 Table4.1 Contact Information.............................................................................................4 Table 4.2 City of Goldsboro Departments...........................................................................4 Table 7.1 BMPs and Measurable Goals for Public Education and Outreach ....................15 Table 7.2 BMPs and Measurable Goals for Participation/Involvement ............................15 Table 7.3 BMPs and Measurable Goals for Illicit Discharge Detection and Elimination.16 Table 7.4 BMPs and Measurable Goals for Construction Site Runoff Controls...............17 Table 7.5 BMPs and Measurable Goals for Post -Construction Runoff Control ...............17 Table 7.6 BMPs and Measurable Goals for Pollution Prevention/Good Housekeeping ... 18 Table 7.7 List of Departments and Operations Impacted by City O&M...........................11 Table 7.8 Industrial Facilities Subject to Stormwater Permits..........................................13 Attachments City of Goldsboro Stormwater Management Program for Nitrogen Control in the Neuse River, modified February 2003 Public Education Action Plan, City of Goldsboro, dated September 2001 1. STORM SEWER SYSTEM INFORMATION I.I. Population Served The population of the City of Goldsboro is 38, 516 based on the July 2001 estimates from the North Carolina State Demographics Unit, 1.2. Growth Rate The City of Goldsboro had a negative 4.1% (-4.1%) growth from the 1990 to the 2000 census, based on data from the North Carolina State Demographics Unit. This is an annual rate of negative .4% (-.4%) per year 1.3. Jurisdictional and MS4 Service Areas The ETJ area is 32 square miles, and the MS4 Service Area is 26 square miles. L4. MS4 Conveyance System The MS4 system consists of ditches, culverts, and underground pipes. Most runoff starts as sheet flow from streets, parking lots, and managed space; or as flow from roof downspouts. The runoff is picked up in ditches and storm sewer inlets, and moves through culverts and underground pipe to the receiving waters. The system is maintained by the General Services Department, which has a semi-annual maintenance schedule for cleaning up ditches and culverts, and an on -call role when problems in drainage are encountered. The state of maintenance of the system is good overall, although large storms have resulted in localized flooding, particularly in the Stoney Creek sub -basin. 1.5. Land Use Composition Estimates Residential 47% Commercial 12% Industrial 14% Open Space 27% 1.6. Estimate Methodology These percentages were based on the proposed Land Use Plan, Figure 3.2, in the City of Goldsboro's Comprehensive Plan for June 2000. 1.7. TMDL identification The MS4 discharges into the Neuse River, which is under a TMDL for nitrogen. 1 I 1 2. RECEIVING STREAMS Table 2.1 Neuse River Basin Receiving Stream Water Quality Use Support Water Quality Stream Name Segment Classification Rating Issues Neuse River Goldsboro WS C; NSW FS intake to Coxes Creek 27-(56) Smith Mill Run Source to Little WS-TV: NSW FS River 27-57-21 Little River Spring Branch WS-1V; NSW FS to .6 mile DS of Smith Will Run 27-57-(20.2) .6 mile DS of WS-IV; NSW, FS Smith Will Run CA to Goldsboro WS intake 27- 57-(21.1) Goldsboro WS C; NSW FS Intake to US Hwy 70 27-57- (21.1) US Hwy 70 DS B; NSW FS to I mile from US Hwy 70 27- 57-(21.4) 1 mile DS from C; NSW FS US Hwy 70 to Neuse River 27-57-(22) Stoney Creek Source to C; NSW Biologically Urban Neuse River Impaired, Runoff/Storm 27-62 Overall PS Sewers Howell Creek Source to C; NSW NR Stoney Creek 27-62-1 Reedy Branch Source to C; NSW NR Stoney Creek 27-62-2 Fellows Branch Source to C; NSW NR Stoney Creek 27-62-3 Big Ditch Source to C; NSW FS Neuse River 27-58 2 3. EXISTING WATER QUALITY PROGRAMS 3.1. Local Programs The following water quality programs are implemented within the City of Goldsboro: • Water Supply Water Shed Program • Comprehensive Plan • Neuse NSW Urban Stormwater Program 3.2. State programs The following water quality programs are implemented by the State within the City of Goldsboro MS4 Service area: • Erosion and Sediment Control Program • Neuse NSW Riparian Buffer Program 3 c State of North. Carolina Department of Environment & Natural Resources Division of Water Quality OFFIC USE,'ONLYV Date Rec'd 03 -e)q-u3 Fee Paid Permit Number Nesoco 3,i Cv NPDES STORMWATER PERMIT APPLICATION FORM This application form is for use by public bodies seeking NPDES stormwater permit coverage for Regulated Public Entities (RPE) pursuant to Title 15A North Carolina Administrative Code 2H .0126. A complete application package includes this form and three copies of the narrative documentation required in Section X of this form. This application form, completed in accordance with Instructions for completing NPDES Small M54 Stormwater Permit Application (SWO-270) and the accompanying narrative documentation, completed in ccordance with Instructions for Preparing the Comprehensive Stormwater Management Program Report (S are both required for the application package to be considered a complete application submittal. I I lication submittals may be returned to the applicant. rJ I. APPLICANT STATUS INFORMATION a. Name of Public Entity City of Goldsboro Seeking Permit Coverage b. Ownership Status (federal, Local state or local) C. Type of Public Entity (city, City "'Ly town, county, prison, school, etc. d. Federal Standard Industrial SIC 91 - 97 Classification Code e. County(s) Wayne f. Jurisdictional Area (square Municipal Area: 26 square miles. ED: 32 square miles. miles g. Population Permanent 38,516 (July 2001 estimate) Seasonal (if available) NA h. Ten-year Growth Rate -0.41% per year (1990 census and 2000 census) i. Located on Indian Lands? ❑ Yes ® No II. RPE / MS4 SYSTEM INFORMATION a. Storm Sewer Service Area miles 26 square miles _(square b. River Basin(s) Neuse River Basin c. Number of Primary Receiving Streams 8 d. Estimated percentage of jurisdictional area containing the following four land use activities: • Residential 470/16 • Commercial 12% • Industrial 14% • Open Space 2796 Total = 100% e. Are there..significant water quality issues listed in the attached application report? Yes ❑ No Page 2 NPDES RPE Stormwater Permit Application III. EXISTING LOCAL WATER QUALITY PROGRAMS a. Local Nutrient Sensitive Waters Strategy ® Yes ❑ No b. Local Water Supply Watershed Program N Yes ❑ No c. Delegated Erosion and Sediment Control Program ❑ Yes No d. CAMA Land Use Plan ❑ Yes No IV. CO -PERMIT APPLICATION STATUS INFORMATION (Complete this section only if co -permitting) a. Do you intend to co -permit with ❑ Yes ® No ajxrmitted Phase I entity? b. If so, provide the name and permit number of that entity: • Name of Phase I MS4 • NPDES Permit Number c. Do you intend to co -permit ❑ Yes CK No with another Phase II entity? d: If so, provide the name(s) of the entity: e. Have legal agreements been finalized between the co- ❑ Yes ❑ No rmittees? V. RELIANCE ON ANOTHER ENTITY TO SATISFY ONE OR MORE OF YOUR PERMIT OBLIGATIONS (If more than one, attach additional sheets) a. Do you intend that another entity perform one or more of our permit obligations? X Yes ❑ No b. If yes, identify each entity and the element they will be implementing • Name of Entity NCDENR, Land Quality Section • Element they will im lement Erosion and sediment control • Contact Person F. Mel Nevlis, Chief, Land Quality Section • Contact Address NCDENR, 1612 Mail Service Center, Raleigh, NC 27699-1612 • Contact Telephone Number 919-733-4574 c. Are legal agreements in place to establish responsibilities? ER Yes ❑ No VI. DELEGATION OF AUTHORITY (OPTIONAL) The signing official may delegate permit implementation authority to an appropriate staff member. This delegation must name a specific person and position and include documentation of the delegation action through board action. a, Name of person to which permit authority NA has been del ated b. Title/position of person above c. Documentation of board action delegating permit authority to this person/position must be provided in the attached application report. Page 2 NPDES RPE Stormwater Permit Application VII. SIGNING OFFICIAL'S STATEMENT Please see the application instructions to determine who has signatory authority for this permit application. If authority for the NPDES stormwater permit has been appropriately delegated through board action and documented in this permit application, the person/position listed in Section VI above may sign the official statement below. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. lam aware that there aresignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing iolations. Signature Name Alfonzo King Title Mayor Street Address 214 North Center Street PO Box Drawer A City Goldsboro State NC Zip 27533 Telephone 919-580-4330 Fax 919-580-4344 E-Mai I VIII. MS4 CONTACT INFORMATION Provide the following information for the person/position that will be responsible for day to day implementation and oversight of the stormwater program. a. Name of Contact Person Terry Gallimore b. Title City Engineer c. Street Address 214 North Center Street d. PO Box Drawer A e. City Goldsboro f. State NC g. Zip 27533 h. Telephone Number 919-580-4342 i. Fax Number 919-580-4315 j. E-Mail Address tgaIlimore@ci.goldsboro.nc.us Pam 3 1 NPDES RPE Stormwater Permit Application IX. PERMITS AND CONSTRUCTION APPROVALS List permits or construction approvals received or applied for under the following programs. Include contact name if different than the person listed in Item VIII. If further space needed, attach additional sheets. a. RCRA Hazardous Waste NA Management Program NA b. UIC program under SDWA c. NPDES Wastewater Discharge NCO023949 Permit Number d. Prevention of Significant NA Deterioration (PSD) Program NA e. Non Attainment Program f. National Emission Standards for NA Hazardous Pollutants (NESHAPS) reconstruction a roval g. Ocean dumping permits under the N/A Marine Protection Research and Sanctuaries Act h. Dredge or fill permits under NA section 404 of CWA X. NARRATIVE APPLICATION SUPPLEMENT: STORMWATER MANAGEMENT PROGRAM REPORT Attach three copies of a comprehensive report detailing the proposed stormwater management program for the five-year permit term. The report shall be formatted in accordance with the Table of Contents shown below. The required narrative information for each section is provided in the Instructions for Preparing the Comprehensive Stormwater Management Program Report (SWU-268). The report must be assembled in the following order, bound with tabs identifying each section by name, and include a Table of Contents with page numbers for each entry. STORM SEWER SYSTEM INFORMATION 1.1. Population Served 1.2. Growth Rate 1.3. ]urisdictional and MS4 Service Areas 1.4. MS4 Conveyance System I.S. Land Use Composition Estimates 1.6. Estimate Methodology 1.7. TMDL Identification 2. RECEIVING STREAMS TABLE OF CONTENTS Pa4e 4 ,IL NPDES RPE Stormwater Permit Application 3. EXISTING WATER QUALITY PROGRAMS 3.1. Local Programs 3.2. State programs 4. PERMITTING INFORMATION 4.1. Responsible Party Contact List 4.2. Organizational Chart 4.3. Signing Official 4.4. Duly Authorized Representative 5. Co -Permitting Information (if applicable) 5.1. Co-Permittees 5.2. Legal Agreements 5.3. Responsible Parties 6. Reliance on Other Government Entity 6.1. Name of Entity 6.2. Measure Implemented 6.3. Contact Information 6.4. Legal Agreements 7. STORMWATER MANAGEMENT PROGRAM 7.1. Public Education and Outreach on Storm Water Impacts 7.2. Public Involvement and Participation 7.3. Illicit Discharge Detection and Elimination 7.4. Construction Site Stormwater Runoff Control 7.5. Post -Construction Storm Water Management in New Development and Redevelopment 7.6. Pollution Prevention/Good Housekeeping for Municipal Operations Pace 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4. PERMITTING INFORMATION 4.1. Responsible Party Contact List Tables 7.1 through 7.6 provide the contact person (by office) for each of the measurable goals. Contact information is shown in the table below. Table 4.1 Contact Information Contact Position Contact Phone Email Name Fax Engineering Terry (919) 580-4342 tallimore@ci.goldsboro.nc.us Department Gallimore (919) 580-4315 Director General Set -vices Joe Sawyer (919) 739-7413 jsawyer@ci.goldsboro.nc.Lis Director (919) 739-7442 Public Utilities Karen (919) 735-3329 kbrashear@ci.goldsboro.nc.us Director Brashear (919) 735-8907 Assistant to the Joi Flowers (919) 580-4351 jflowers@ci.goldsboro.nc.us City Manager (919) 580-7442 4.2. Organizational Chart Table 4.2 City of Goldsboro Departments City Manager Assistant to The City Manager Richard Slozak Joi Flowers General Services Public Utilities Planning and Community Development Joe Sawyer Karen Brashear Don Chatman Engineering Finance Fire Department Terry Gallimore Richard Durham Bobby Greenfield Police Human Resources Department Rick Roberson Timothy Bell Recreation and Community Affairs Parks La Terrie Ward Neil Bartlett 4 4.3. Signing Official The signing official is Alfonzo King, Mayor of the City of Goldsboro. As the duly elected representative of the citizens of the City of Goldsboro, Mayor King is the most appropriate person to sign the permit application 4.4. Duly Authorized Representative Not applicable 1 5 6. RELIANCE ON OTHER GOVERNMENT ENTITY 6.1. Name of Entity Land Quality Section, Division of Land Resources, NC DENR 6.2. Measure Implemented Erosion and Sediment Control 6.3. Contact Information F. Mell Nevi Is, PE, Chief of Land Quality Section Department of Environmental and Natural Resources 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 733-4574 6.4. Legal Agreements The North Carolina General Statutes and Administrative Code establish the responsibilities of the state and municipality. 7 7. STORMWATER MANAGEMENT PROGRAM 7.1. Public Education and Outreach on Storm Water Impacts 7.1.1. BMP Summary Table —See Table 7.1 7.1.2. Target Audience —See Public Education Action Plan (enclosed) 7.1.3. Target Pollutant Sources —See Public Education Action Plan (enclosed) 7.1.4. Outreach Program —See Public Education Action Plan (enclosed) 7.1.5. Decision Process —See Public Education Action Plan (enclosed). Measurable Goals are shown in Table 7.1. Responsible Person for the Education Action Plan is the Assistant to the City Manager. 7.1.6. Evaluation —The Public Education Plan is evaluated annually and a report is submitted to the State each October. 72. Public Involvement and Participation 7.2.1. BMP Summary Table --See Table 7.2 7.2.2. Target Audience —See Public Education Action Plan (enclosed) 7.2.3. Participant Program 7.2.3.1. Citizen Representation on a storm water management panel —The City of Goldsboro created a Stakeholders Committee in July 2000 to help develop their Stormwater Management Program (S WMP). The Stakeholders Committee consisted of citizens from key sectors of the community, to include business leaders, developers, environmental groups, and the military. The City was also represented on the Committee. The Committee held several meetings, provided input to the development of the SWMP, and reviewed the draft Program before it was submitted to the State for approval 7.2.3.2. Public Hearings —Goldsboro developed two ordinances for stormwater management in 2001. These were the Ordinance to Implement Stormwater Management for New Development, and the Ordinance for Illegal Discharge Control. The Public was notified of the proposed ordinances and invited to comment. Notification was published in accordance with the established procedures for enacting ordinances within the City of Goldsboro, and the ordinances were discussed and approved by the City Council at a properly scheduled Council Meeting. 7.2.3.3. Working with Citizen Volunteers —See Table 7.2, Item 1 7.2.3.4. Volunteer Monitoring —See Table 7.2, Item 2 7.2.4. Decision Process --See the Public Education Action Plan (enclosed). Measurable Goals are shown in Table 7.2. Responsible Person for Public Involvement and Participation is the Assistant to the City Manager. 7.2.5. Evaluation —The Public Education Plan is evaluated annually and a report is submitted to the State each October. 7.3. Illicit Discharge Detection and Elimination 7.3.1. BMP Summary Table —See Table 7.3 7.3.2. Storm Sewer System Map —See City of Goldsboro Stormwater Management Program for Nitrogen Control in the Neuse River Basin (referred to herein as the SWMP), Section 3. 7.3.3. Regulatory Mechanism —See the SWMP, Appendix C. 7.3.4. Enforcement —See the SWMP, Section 3 and Appendix C. 7.3.5. Detection and Elimination —See the SWMP, Section 3. 7.3.6. Non-Stormwater Discharges —There are no non-stormwater discharges that have been identified as significant contributors of pollutants to the City's MS4. 7.3.7. Incidental Non-Stormwater Discharges —There are no local controls established on incidental non-stormwater discharges. 7.3.8. Outreach —See the SWMP, Section 3 and the Public Education Action Plan. 7.3.9. Decision Process —See the SWMP, Section 3 and Appendix C. Measurable Goals are shown in Table 7.3. The Responsible Person for Illicit Discharge Detection and Elimination is the Director of the General Services Department. 7.3.10. Evaluation —The Illegal/Illicit Discharge Detection and Elimination Program is evaluated annually and a report is submitted to the State in October. 7.4. Construction Site Stormwater Runoff Control The City of Goldsboro will rely upon the State Erosion and Sediment Control Program and the DWQ General Permit for Construction Activities to meet the requirements of this measure. The City's activity will be limited to reminding developers during technical workshops of the requirement for them to comply with the State program. See Table 7.4 for BMP Summary. 7.5. Post -Construction Storm Water Management in New Development and Redevelopment 7.5.1. Locally issued Permit to Construct Under the SWMP—The City of Goldsboro will develop and implement a Local Permit for Construction Under the SWMP (hereafter referred to as the SWMP Permit). Under the existing SWMP, all projects within the City of Goldsboro's jurisdiction must control peak runoff for the I year, 24 hour storm, except for developments that are less than 15% impervious and that convey stormwater over pervious cover to the maximum extent practicable. The Neuse River Riparian Buffer rules require projects to be 50 feet from perennial and intermittent surface waters, and the City will rely upon the State DWQ for enforcement of that provision. The current SWMP already meets the requirement that structural BMPs for stormwater treatment E ' achieve an average of 85% annual removal for Total Suspended Solids (TSS) because the SWMP requires BMPs to be constructed in accordance with the NC DENR BMP manual (See Appendix A of the SWMP). The SWMP Permit will incorporate the following requirements: 7.51.1. The permit will require recorded deed restrictions and protective covenants. ' 7.5.1.2. The permit will require that all projects shall be designed in accordance with 15A NCAC 2H.1008(c) 7.5.2. Operation and Maintenance Component —The City of Goldsboro will inspect BMPs on an annual basis, and the inspection will be performed by the City Engineering Department. The City will charge an annual fee of ' $100.00 for each BMP inspected (See City Code, Chapter 96.03(c)). 7.5.3. The City of Goldsboro will develop, in the first year of the NPDES Permit and in coordination with the local county health department, an oversight on program for the operation of on -site wastewater treatment systems for domestic wastewater. Residents within the City boundaries are required to hook up to the sanitary treatment system as soon as possible. ' Chapter 53.17(C) of the City of Goldsboro Code of Ordinances is quoted: "Every person owning a house, apartment house, storehouse, restaurant or any building inside the city limits used for sleeping quarters ' or any building where any persons are employed, which building abuts or adjoins a street or alley along which there is public water or sewer, shall, within 30 days from the date of legal notice served by the City Plumbing Inspector or other authorized deputy, have sewer and water connections made to the building or house. All such connections must be made according to the requirements of this subchapter in the interest of public ' health and safety." 7.5.4. The City of Goldsboro MS4 does not drain to SA Waters. 7.5.5. The City of Goldsboro MS4 does not drain to Trout (Tr) Waters. 7.5.6. The City of Goldsboro has an approved plan under the NSW Urban Stormwater Management Program to control drainage to Nutrient ' Sensitive Waters. A nutrient application management program for both inorganic and organic nutrients will be developed in the second year of the NPDES Permit and included in the SWMP. 7.5.7. The City of Goldsboro participates in the Mid-Neuse NPS (Non -Point Source) Team meetings and activities, which include education on nutrient application management and BMP implementation within the Stoney ' Creek sub -basin. These activities will be integrated into the SWMP whenever they fit within the objectives of this NPDES Permit. 7.5.8. BMP Summary Table —See Table 7.5 ' 7.5.9. Non-structural BMP 7.5.9.1. The City has no policies or ordinances that direct growth, protect sensitive areas, maintain or increase open space, provide for buffers, ' minimize impervious surfaces, or minimize soil disturbances beyond what are explicitly stated in this permit application. The City has reviewed its 1 development ordinances and policies to see where impacts to water quality I0 can be reduced, and the City enforces the Neuse River Riparian Buffer Regulations. 7.5.9.2. There are no other ordinances or policies that encourage infill development to higher density urban areas or areas with existing storm sewer systems beyond whan are explicitly stated in this permit application. 7.5.9.3. The City conducts annual education programs for developers and their engineers/designers of record on compliance with the SWMP. 7.5.9.4. There are no other non-structural BMPs beyond what are contained in this permit application, the existing SWMP, and the Public Education Action Plan. 7.5.10. Structural BMPs--See the SWMP, Section 2.2, Best Management Practices (BMPs). 7.5.11. Regulatory Mechanism --See the SWMP, Section 2, and Appendix A, Ordinance to Implement Stormwater Management Regulations for New Development. 7.5.12. Operation and Maintenance —See the SWMP, Section 2.2.2, Long-term Maintenance Plan for BMPs, Appendix A,� and Chapter 96.03(c), Public Nuisances, Stormwater treatment, retention or impoundment devices (Structural Best Management Practice (BMP)), of the City of Goldsboro Code of Ordinances. 7.5.13. Decision Process —See the SWMP, Section 2 and Appendix A. Measurable Goals are shown in Table 7.5. ' The Responsible Person for Post Construction in Stormwater Management in New Development and Redevelopment is the Director of the Engineering Department. 7.5.13.1. Stormwater runoff from new development and redevelopment projects is addressed in the existing SWMP. 7.5,13.2. The SWMP has been specifically tailored for the City of Goldsboro. 7.5.14. Evaluation —Post Construction in Stormwater Management in New Development and Redevelopment is evaluated annually and a report is submitted to the State in October. 7.6. Pollution Prevention/Good Housekeeping for Municipal Operations 7.6.1. BMP Summary Table —See Table 7.6 7.6.2. Affected Operations: Table 7.7 List of Departments and Operations Impacted by City O&M kJE Y-.+W.,e14 kS.Y W1'.f? CFir:.'i�p De artment:,r� ,s .�,.. •-..a,s;:♦ i^ ^9---.,7t •- � - �' '4 .O eratrons� General Services The Cemetery Division is responsible for maintaining the two City cemeteries, Elmwood and; Willowdale. The Building and Traffic Maintenance Division installs and maintains�traffic signals, signs, and street markers. The Streets and Storm Sewer MaintenanceDivision repairs and maintains 11 I I1 1-1 149 miles of paved and 5 miles of unpaved city streets and drainage facilities. The Utility Maintenance Division is responsible for the installation and maintenance of water and sanitary sewer mains. The Sanitation Division's major responsibilities are the collection of refuse, recycling products and vegetative yard debris. The Garage Division is responsible for the maintenance and upkeep of over 500 City and County vehicles. Public Utilities The Water Treatment Plant has a current treatment capacity of 12 million gallons per day. The Water Reclamation Facility currently treats wastewater using a biological process to remove pollutants from the water. It has a current treatment capacity of 10.8 million gallons per day (MGD). An upgrade project will be finished in 2003 which will increase treatment capacity to 14.2 MGD. A Biosolids Composting Facility takes the biosolids from the treatment process and mix it with chipped yard waste to produce compost that can be used in horticultural applications. Forty acres of Constructed Wetlands provides further "polishing" of one million gallons of treated wastewater per day before the water is discharged back into the Neuse River. Parks and Recreation The Goldsboro Recreation and Parks Department operates and maintains I 1 parks, three recreation centers, an 18-hole golf course, and the Paramount Theater. Engineering The Engineering Department provides engineering and surveying services necessary for the design and construction of streets, sidewalks, storm drainage lines, water lines, and sanitary sewer lines. Engineering provides inspection services for construction of streets, storm drainage lines, water lines, and sanitary sewer lines within public rights -of -way and new subdivisions to assure conformance with City standards. The department also administers the City's Flood Damage Prevention Ordinance. 12 Table 7.8 Industrial Facilities subject to S.tormwater Permits Facilit`'���'"�+� Y `w��a �;���'rCrenera1sP,e'iintt'��� `���s %r ,:,CeitificateNumber General Maintenance NCG080000 NOI submitted in Complex February 2003 Water Reclamation NCG110000 No Exposure Facility Exemption submitted in February 2003 Biosolids Composting NCGI10000 NOI submitted in Facility_ February 2003 7.6.3. Training —The City has already conducted two workshops for City employees on stormwater management. The City staff is targeted in the Public Education Action Plan to receive information on Stormwater, Pollution and Pollutants, and Illegal Discharges. The current Public Education Action Plan is being updated and training for City staff will be coordinated with the outreach program for public information. 7.6.4. Maintenance and Inspections —The City will be undergoing inspections for illicit connections. These inspections will find any connections that could possibly lead to an illegal discharge into the storm sewer system from City owned facilities. See Table 7.6. 7.6.5. Vehicular Operations— In regard to vehicle operations, the General Services Department is responsible for facility and vehicle maintenance for the City of Goldsboro. The General Services Department operates under standard procedures that include the control of pollutants and the clean-up of any spills of pollutants. The General Maintenance Complex has been submitted for a General Industrial Stormwater Discharge Permit, and in the first year of this NPDES permit, the Department will prepare a Stormwater Pollution Prevention Plan to control the stormwater discharges from the Complex. 7.6.6. Waste Disposal —All municipal waste is disposed up according to current laws and regulations. Sludge and other accumulated sediments are either sent to an approved landfill, reused under an approved permit, or recycled at the Biosolids Compost Facility. General debris is sent to an approved landfill. 7.6.7. Flood Management Projects —Evaluation of Flood Management Projects is described in the SWMP, Section 3 and in Appendix B, Flood Damage Prevention Ordinance. 7.6.8. Existing Ordinances —Under the current SWMP, the Planning and Development Department has been conducting a review of ordinance to 13 assess their impact on water quality. See the current SWMP, Section 2.3, Local Ordinance Review of Land -use Planning and Design Techniques. 7.6.9. Other Evaluations —There are no evaluations of municipal operations impact on water quality other that what are explicitly described in this permit application. 7.6.10. Decision Process --See the SWMP, Section 6 and Appendix E. ' Measurable Goals are shown in Table 7.6. The Responsible Person for Pollution Prevention/Good Housekeeping for Municipal Operations is the Director of the General Services Department, 7.6.11. Evaluation —The success of this minimum measure will be evaluated annually, at the same time the rest of the SWMP is being evaluated. ' However, this evaluation will not be reported to the state. 1 11 1 14 I Table 7.1 BMP's and Measurable Goals for Public Education and Outreach I BMV.�, 'M i§ijrAlJ10G6�l9:t e� �'-YR� R,:-'YR,'T,YR1-Responsi e .R 5 % i'P 314 I Information 95% of households Public Utilities Flyer will be sent Director information annually as part of x x x x x the Annual Drinking Water Quality Report 2 Web Site Information on the Assistant to City Stormwater Manager Management Program will be x x x x established on the City's Web Site and reviewed annually 3 Radio Spots Information on Assistant to City citizen actions to Manager reduce pollution 2 4 4 4 and report illicit discharges will be aired Table 7.2 BMP's and Measurable Goals for Public Parilcii)ation/Involvement '4Mea'sqr'qib1q GoalsR YR` 411 R` .2 `6 ;-WR-j '23 WWR s5' �'Pbsftfi5fi/ffirt I Storm Drain 20% of storm drains Assistant to City Stenciling will be stenciled Manager annually through school groups, x x x x x community groups, or other volunteer groups solicited by the city 2 Stream One stream will Assistant to City Adoption policed on an Manager annual basis by x x x x Adopt-a-Strearn. volunteers 15 Table 7.3 BMP's and Measurable Goals for Illicit Discharge Detection and Elimination B W, 't­ -T ' M ;,Measurable s Zr' rOW3 YW U9 A !YR-. ,YR' ,S," -YR.. Responsible 3 A ..k5. 16fiTWO., I Mapping of 50 % of MS4 outfalls General Services Storm Drain will be mapped each x x Director Outfalls year for the first two years of the Rermit 2 Mapping of 20% of MS4 will be General Services Storm Drain mapped annually X X X X X Director System 3 Potential 95% or greater of Assistant to City Polluter retail, commercial, Manager Information industrial, and institutional entities will be sent a letter every two years x x x outlining their responsibilities for detecting and eliminating illicit connections and illegal discharges 4 Potential Restaurant Assistant to City Polluter owners/operators and Manager Education main Lenance/was h facility operators will attend one class on x pollution prevention during the permitted period 5 Potential Institutional and Assistant to City Polluter industrial personnel Manager Education will attend one class on pollution x prevention during the permitted period 6 illegal The City will Assistant to City Discharge establish and utilize a Manager Hotline Hotline for the x x x x reporting of illegal -discharges. 16 I Table 7.4 BMP's and Measurable Goals for Construction Site Runoff Control I m r,',M6Ndrab1e,G— lg WM "Y" WR,Res .N 5,, ­Ro OsId ar NZL I Developer Technical workshops Engineering Education for Developers (see Department item 5 in Table 7.5) Director will include information on their x x x x x responsibilities under the State Erosion and Sediment Control Program _ Table 7.5 BMP's and Measurable Goals for Post -Construction Runoff Control "M 'rs'� 1 e,, G 6 A 19' :X� R1 N NR o I RXR',, I 'YR bh�ib le MIT AA 2' _" - , * J :! I Site Plan Development Plans Engineering Reviews will be reviewed for Department x x x x x compliance with the Director SWM? 2 Local Permit The City will Engineering for implement a Department Construction program requiring Director under the Developers to SWMP obtain a Permit to Construction under the SWMP. The x x x x Local Permit will be developed during the first year of the NPDES Permit period, and then used in subsequent Xears, 3 BMP Stormwater BNIPs Engineering Inspections will inspected X X X X Department annually Director 4 Retrofit Site Three (3) sites Engineering Selection suitable for retrofit Department will be identified Director annually by the x x x x x City. If funds are available from the State or Federal Government, the 17 17 I - " , , . M �r 5'v PO* sitib rty City will implement the retrofits. 5 BMP 90% of BMPs that Engineering Maintenance are found to be Department poorly maintained x x x Director will be brought into compliance within 180 days or less 6 B NIP Technical Engineering Education workshops will be Department held by the City Director annually for x x x x x Developers and their Engineering Staff/Contractor ITable 7.6 BN/IP's and Measurable Goals for Pollution Prevention/Good Housekeeping 'B -me'a'su'r—abl�--i-.C;�ls"-�,iYR",.NYR -11'�.- �*YR­". - Y Ro,.YR! tespoksible '-$ . -W dsifi6fiRart I Street 50% of streets will General Services x x x x x Sweeping be swept annually Director Vehicle 95% of City General Services Washing vehicles will be Director cleaned on wash x x x x x racks which treat or recycle wash water 3 Illicit 50% of City -owned General Services Connection facilities will Director Inspection inspected for illicit connections by 2005, all City - owned facilities x x inspected by 2007. When found, illicit connections will be managed so that illegal discharges do not occur 4 Illicit Illicit connections General Services Connection identified by Director Elimination inspection or other x x means will eliminated as City Budgets allow B tr� ..... . . . . . .13 . . . . . .iufi V. . . . . . . J. mu m . City of Goldsboro Stormwater Management Program For Nitrogen Control In the Neuse River Basin Prepared,«: Goldsboro, North Carolina Prepared by. ARCADIS Geraghty & Miller of North Carolina, Inc. 2301 Rexwoods Drive Suite 102 Raleigh North Carolina 27607 Tel 919 782 5511 Fax 919 782 5905 Our ReL NC030163.0000.00008 Dale: October 2001 Amended February 2003 This document is intended only for the use of the individual or entity for which it was prepared and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. Any dissemination, distribution, or copying of this document is strictly prohibited. Table of Contents 1. Introduction 1-1 1.1 Neuse River Basin Nutrient Sensitive Waters (NSW) Management Strategy 1-1 1.2 Goldsboro's Stormwater Management Program 1-2 1.2.1 Program Goals 1-2 1.2.2 Organization of this Stormwater Management Program 1-2 1.2.3 Responsibilities 1-3 2. Program Plan for New Development 2-1 2.1 Controlling Nitrogen Through the New Development Review/Approval Process 2-1 2.1.1 Calculating Nitrogen Export from Now Development 2-2 2.1.2 Methodology for Calculating Peale Runoff Volumes 2-3 2.1.3 Goldsboro's Choice for Protection of Riparian Buffers in New Developments 2-5 2.2 Best Management Practices (BMPs) 2-6 2.2.1 Choosing BMPs 2-6 2.2.2 Long -Term Maintenance Plan for BMPs 2-8 2.3 Local Ordinance Review of Land -Use Planning and Design Techniques 2-8 2.4 Jurisdiction -Wide and Inter -local Approaches 2-9 2.5 EPA's Phase II Stormwater Requirements 2-10 2.5.1 Construction Site Runoff Control 2-10 2.5.2 Post -Construction Runoff Control 2-10 3. Program Plan for Illegal Discharges 3-1 3.1 Establishing Legal Authority to Control Illegal Discharges 3-1 3.2 Collecting Jurisdiction -Wide Information 3-1 3.3 Mapping and Field Screening in High Priority Areas 3-4 3.4 Identifying and Removing Illegal Discharges 3-5 3.5 Preventing Discharges and Establishing a Hotline 3-7 C'1Down t and S&W.OwwWaWy OaeunentsS sb�ISWMFV9ovbad SWMRF4W DOCASMP R.Pd.doa Table of Contents 3.6 EPA's Phase II Stormwater Requirements 3-8 4. Retrofit locations 41 4.1 Annual Retrofit Actions 4-1 4.2 Data Collection and Notification 4-1 4.3 Mapping Identified Retrofit Locations 4-3 5. Public Education and Public Involvement 54 5.1 Public Education Action Plan 5-1 5.1.1 Planned Activities 5-2 5.1.2 Technical Workshops 5-4 5.2 Incorporating Existing Resources and Programs 5-4 5.3 EPA's Phase II Stormwater Requirements 5-5 6. Pollution Prevention/Good housekeeping 6-1 1. Evaluation and Reporting 7-1 B. EPA Phase II Measurable Goals 8-1 Tables 3.1 Discharges that May be Allowable to the Stormwater Collection System. 3-2 3.2 Types of Discharges that are not Allowed to the Stormwater Collection System. 3-2 3.3 Field Screening Report Information. 3-5 3.4 Phased Implementation Schedule for Illegal Discharge Activities. 3-8 4.1 Retrofit Opportunity Information. 4-2 5.1 Public Education Action Plan Category 1 and 2 Activities. 5-1 7.1 Specific Annual Nitrogen Loading Reporting Requirements. 7-2 7.2 Annual Illegal Discharge Reporting Requirements. 7-3 C'IDomu is and Smnpslweabatawy Do-m nts"oWd badPMseIISWMRRWMed SWWWiinal Do ZMP RepaHdm Figures 2.1 Worksheet for Method 1: Quantifying Total Nitrogen Export From Residential Developments When Building and Driveway Footprints are Not Shown. 2.2 Worksheet for Method 2: Quantifying Total Nitrogen Export From ResidentiaVlndustrial/Commorcial Developments When Footprints of all Impervious Surfaces are Shown. 2.3 Peak Runoff Worksheet for Small Drainage Areas in Mid- Neuse Basin. 3.1 Field Screening Process. Appendices A. Ordinance to Implement Stormwater Management Regulations for New Development. B. Flood Damage Prevention Ordinance. C. Ordinance to Implement Regulations Regarding Illegal Stormwater Discharges Related to the City of Goldsboro's Stormwater Management Program. D. Example Letter to Likely Sources of Illegal Discharges. E. Implementation Schedule. F. EPA Phase II Measurable Goals. F-1 F-3 F-4 F-5 Table of Contents C Von wn end Sanlgpe wsffiala" Documents\Golddl mTtme[ISWMRRwhmd SWMFWkW DDcs\SMP RoW.doc Table of Contents I This Page left Blank I I 1 I 1 G%Doc menla and Semnp NV abalaWv nocvnmft QOoWsbamU3 omilSWMPTRAvis d SWMPTnW Do ZMP Repmt.dm I City of Goldsboro Stormwater Management Program For Nitrogen Control In The !lease River Basin 1. Introduction Introduction 1.1 Meuse River Basin Nutrient Sensitive waters iNSWI Management strategy The goal of the Neuse River Basin Nutrient Sensitive Waters (NSW) Management Strategy (final adoption in August 1998) is to achieve a 30 percent nitrogen reduction from each controllable and quantifiable source of nitrogen in the basin. These sources are Wastewater Treatment, Urban Stormwater, and Agriculture and Nutrient Application. The NSW Strategy also includes a rule to protect riparian buffers (the Riparian Buffer Rule, 15A NCAC 2B .0233) to maintain their existing nitrogen removal capabilities. The Neuse Stormwater Rule (15A NCAC 2B .0235) only applies to the largest and fastest -growing local governments in the Neuse River Basin (there are 15); Goldsboro is one of the affected governments. The rule establishes a broad set of objectives for reducing nitrogen runoff from urban areas and sets up a process for the Division of Water Quality (DWQ) to work with the affected local governments to develop a model stormwater program for meeting the objectives. The timeframe for implementation of the rule is as follows: September 9, 2000: Deadline for submittal of local Stormwater Management Program 1 March 9, 2001: (including ordinances) to the Environmental Management Commission (EMC). Deadline for local governments to begin implementing local Stormwater Management Programs. Each stormwater management program must include the following general elements: New Development Review/Approval, Illegal Discharges, Retrofit Locations, and Public Education. Following implementation of the local Stormwater Management Programs, local governments are required to make annual progress reports to EMC by October 30 of each year that include nitrogen loading reduction estimates. This document details the City of Goldsboro's Stormwater Management Program for t Nitrogen Control in the Neuse River Basin. It closely follows the guidance provided in the Neuse River Basin: Model Stormwater Program for Nitrogen Control dated August 30, 1999. The implementation dates listed above differ from those listed in the model 1 plan. The EMC committee decision to approve the model local government stormwater program occurred on September 9, 1999; the Stormwater Rule allows 12 months from EMC approval before the subject local governments must submit their cVLv and s nn.U3r�ubat.uy SWMPFrol Do auMP Fkp&td � [a City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin local stormwater management program plans to the Commission for review and approval, and 18 months before the programs must be implemented. Introduction 1.2 Goldsboro's Stormwater Management Program 1.2.1 Program Goals The City of Goldsboro is taking a proactive approach to the management and control of stormwater in both the City proper and in its Extraterritorial Jurisdictions (ETJs). Rather than simply meet the requirements for nitrogen control as dictated by the Neuse NSW Strategy, Goldsboro is structuring their Stormwater Management Program to also address the concerns and expected requirements of EPA's Phase II Stormwater Rule. The City has also prepared their program to be no less stringent than the program for Wayne County, which is also subject to the Neuse Stormwater Rule. Teaming possibilities with Wayne County will continually be explored, particularly in the areas of public education and outreach, and public participation/involvement. In this way, Goldsboro and its constituents will garner the benefits of an integrated stormwater management program that requires the least expenditure of financial and personnel resources and avoids duplication of effort. Another goal of this program is to provide uniform guidelines and requirements for development and growth in both the City of Goldsboro and throughout Wayne County. Although the process may differ in each jurisdiction, the program elements and requirements of both Stormwater Management Programs will be consistent. Fee schedules and penalties will be no less rigorous than those required by Wayne County. Other incorporated areas will be considered in this process. This will serve not only to avoid inappropriate and unbalanced development as a result of program implementation, but will provide standardized requirements for unincorporated areas which undergo annexation. 1.2.2 Organization of this Stormwater Management Program This document reflects the basic organization of the Neuse River Basin: Model Stormwater Program for Nitrogen Control, and incorporates some additional components from EPA's Phase lI Stormwater Rule. Section 2.0 presents Goldsboro's Program Plan for New Development. Section 3.0 discusses their Program Plan for Illegal Discharges. Section 4.0 explains the methodology for Identifying Retrofit Locations. Public Education and Public Involvement are discussed in Section 5.0. Section 6.0 discusses the Phase 11 requirements for Pollution Prevention/Good Housekeeping. Section 7.0 details the annual Evaluation and Reporting requirements. G�ta and SatUr pk".W.Wly OocumerHalGddeborolPhaseIl5W MHF2evined SW MPRk l Doa SMP Report do 1-2 1 City of Goldsboro Stormwater Management Program ' For Nitrogen Control In The Nense Bluer Basin 1 1.2.3 Responsibilities Introduction ' The implementation of this Stormwater Management Program for Nitrogen Control will be the responsibility of the City Manager. Oversight will be provided by an internal Steering Committee, comprised of representatives from the following departments: Manager's Office, General Services, Planning, Community Affairs, Engineering, Finance, and Recreation and Parks. This Steering Committee, in conjunction with the City Manager, assigned responsibilities for program ' implementation, considered staffing and budgetary requirements, identified obstacles to implementation, and developed strategies to remove obstacles and/or provide incentives for program participation. Meetings will be held on a quarterly basis to review the implementation of the program and to address any new issues which may arise. 1 C:SDoctmi" end SettingsNmabataWy Documents46oldsbom\PhaseliMMRRwiwd SWWPIraI Do Wrl %pori.doc 1-3 City of Goldsboro Stormwater Management Program For Nitrogen Control in The Meuse River Basin 2. Program Plan for New Development Program Plan for New 2.1 Controlling Nitrogen Through the New Development Review/Approval Process Development Section 32.088 of Goldsboro's Code of Ordinances states that no new or redevelopment project may proceed before all permits are secured, which requires that the site plan be submitted to and approved by the Planning and Engineering Departments of the city. It will be during this established development review process that the City will review the Neuse Stormwater Rule components of any project falling under the "New Development" definition. Appendix A contains "An Ordinance to Implement Stormwater Management Regulations for New Development" to establish the authority to require compliance with the Program Plan for New Development within the City proper and its ETJ, as detailed in this section. The developer or builder will be required to comply with these provisions for any new development which falls under either of the following definitions: • Any activity that disturbs greater than one acre of land in order to establish, expand, or modify a single family or duplex residential development or a recreational facility. [Land disturbance is defined as grubbing, stump removal, and/or grading.] • Any activity that disturbs greater than one-half an acre of land in order to establish, expand, or modify a multifamily residential development or a commercial, industrial, or institutional facility. To fund this additional new development review process, the City Council may set a fee structure for the cost of reviewing all Building Permit applications for compliance with the ordinance. All such projects will be. required to meet the goal of a 30 percent nitrogen reduction by implementation of planning considerations and best management practices (BMPs). Agriculture, mining, or forest activities, and property owners with vested rights are not subject to the requirements of new development and will receive a waiver. Vested rights must be demonstrated by the property owner as of the effective date of this Stormwater Management Program (as adopted by the City Council) and may be based on at least one of the following: substantial expenditures of resources as determined by the Engineering Department (time, labor, money) based on a good faith reliance upon having received a valid local government approval to proceed with the project, or CSponn ft end Semrq�SwsabntdMy Dommwt\CG MsbomlPta A1SWMWiwwA SWMRFuW 0.m\SMP Heport.doc 2-1 1 City of Goldsboro Stormwater Management Program For Nitrogen Control in The Neuse River Basin • having an outstanding valid building permit in compliance with G.S. 153A- 344.1 or G.S. 160A-385.1, or Program Plan for New Development • having an approved site specific or phased development plan in compliance with G.S. 153A-344.1 or G.S. 160A-385.1. ' Projects that require a state permit, such as landfills, NPDES wastewater discharges, land application of residuals and road construction activities shall be considered to have vested rights if a state permit was issued prior to the effective data of this Local Stormwater Management Program. ' Currently, Recreation and Parks projects for the City do not require permits. To ensure that all such projects comply with the provisions of the Neuse Stormwater Rule, and eventually EPA's Phase 11 Rule, all park projects will be required to undergo an internal review by the Planning and Engineering Departments. New development will be limited to 3.6 pounds per acre per year (Ibslaclyr) nitrogen loading. Property owners will have the option to partially offset projected nitrogen loads by funding wetland or riparian area restoration through the NC Wetlands Restoration Program (WRP). As established by Rule 15A NCAC 213.0240, the rate shall be $11/lb/yr, at an amount sufficient to fund 30 years of nitrogen reduction. The result is a one-time offset payment of $330/lb/ac which must be paid prior to approval of the development plan. However, no new residential development will be permitted to exceed a total nitrogen loading rate of 6.0 Ibslaclyr, and no new nonresidential development will be permitted to exceed 10.0 lbs/ac/yr. The nitrogen export standard of 3.6 Ibslaclyr was estimated by the EMC to be 70 percent of the average nitrogen load contributed by the nonurban areas in the Neuse River basin ' (as defined using 1995 LANDSAT data). It is understood that the EMC may periodically update the performance standard based on the availability of new scientific information. 2.1.1 Calculating Nitrogen Export from New Development The nitrogen export from each new development will be calculated. Annual reports must contain the computed baseline and net change in nitrogen export from new development that year. Goldsboro will utilize the methodologies as they are detailed below. The ' Inspection Department will supply the necessary worksheets for the developer or builder to perform these calculations at new development sites as part of their building permit submission (to ensure that the 30 percent reduction has been attained or that appropriate ' and sufficient BMPs have been planned and/or offset fees paid). The calculations will be CADoa —to and SetdnpsixsabalalMy ISNMPawieed SWW'%reW DocWsMP ftoa Aoc 2-2 City of Goldsboro Stormwater management Program For Nitrogen Control In The House River Basin verified by the Engineering Department then, and again prior to issuance of the Certificate of Occupancy (to ensure that the site was developed as planned, and that any Program Plan for New required BMPs have been constructed properly). Development Method l for residential developments where lots are shown but the actual footprint of buildings are not shown on site plans. The impervious surface resulting from building footprints is estimated based on typical impervious area associated with a given lot size. Figure 2.1 contains the worksheet for this calculation. 2. Method 2 for residential, commercial, and industrial developments when the entire footprint of the roads, parking lots, buildings, and any other built -upon area is shown on the site plans. Figure 2.2 contains the worksheet for this calculation. For nonresidential subdivisions where the impervious surfaces are not shown on the plans at the time of submittal, the developer or builder will specify areas of impervious surface, undisturbed open space, and managed open space in their Building Permit application, assuming the maximum impervious surfaces and minimum open space for the project design. The City has established the Building Permit as a legal, enforceable mechanism to hold the developer or builder accountable for their estimations of each land use type. The developer or builder will then use Method 2 (Figure 2.2) for their calculation. 4. For redevelopment projects, Method 2 must be used to estimate the nitrogen loading from the site before and after the redevelopment project takes place. As long as the redevelopment project does not increase the nitrogen loading from the site, the developer shall be exempt from the program requirements for nitrogen control on new development. 2.1.2 Methodology for Calculating Peak Runoff Volumes The Neuse Stormwater Rule states that there can be no net increase in peak flow leaving a new development site from the predevelopment conditions for the 1-year, 24-hour storm. The Inspection Department will provide the developer or builder with a worksheet (Figure 2.3) that employs The Rational Method to determine the peak flow from both the pre -development (performed prior to issuance of the Building Permit) and post -development (performed prior to issuance of the Certificate of Occupancy) C:SdUq--b and Saningslw&.ta" SWMF%R.A Doc SMP Report doc 2-3 conditions. The Rational Method is the most common method for computing the peak rate of runoff from small drainage basins (up to 150 acres). If peak runoff needs to be calculated from a larger drainage area (more than 150 acres), the Peak Discharge Method as described in the USDA Soil Conservation Service's Technical Release Number 55 (TR-55) will be employed. This methodology will be used for computing pre- and post -development conditions. (Note: The Putnam Method, while allowed by the Model Plan, was developed specifically for the Piedmont region of North Carolina, and will not be used for calculations in Goldsboro, which lies in the Coastal Plain.) The equation for calculating peak runoff under the Rational Method is: Qp = Aci where Qp = peak runoff, cfs A = drainage area, acres c = runoff coefficient, dimensionless i = rainfall intensity, inches/hour The acreage for each land use type will already be known from calculating the nitrogen export as described in Section 2.1.1. The runoff coefficients for a variety of surface types can be gotten from a table, such as the one developed by the American Society of Civil Engineers (ASCE) & Water Environmental Federation (in Design and Construction of Urban Stormwater Management Systems, 1972). However, as stated by John E. Gribbin in Hydraulics and Hydrology for Stormwater Management (1997), typical design values for runoff coefficients are 090 for impervious surfaces, 0.30 for permanently protected managed open space (such as lawns), and 0.20 for permanently protected undisturbed open space (such as woods and brush). In keeping with the spirit of the rule, and to maintain consistency with the approach ' taken to calculate total nitrogen export (where total nitrogen export coefficients are set), Goldsboro will adopt these typical design values for the runoff coefficient. This will result in a more consistent, objective, and straightforward calculation of peak runoff that does not need to take into account the effects of soils, rainfall intensity and duration, slope, and impervious surface. A worksheet has been prepared for the Rational Method peak runoff calculation (Figure 2.3) which is patterned after the ' method outlined in the NC Erosion and Sedimentation Control Planning and Design Manual. City of Goldsboro Stormwater management Program For Nitrogen Control In The Neuse River Basin Program Plan for New Development I Claw w is and SessagalwaahamUlY ISWMWknrkai SWMPOW Do,;A UP Rwond= 2-4 City of Goldsboro Stormwater Management Program For Nitrogen Control in The Meuse River Basin The peak runoff calculation will be performed by the developer or builder for their Building Permit submission. Prior to issuance of a Building Permit, the post- Program Plan for New development peak flow must be calculated to be equal to or less than the pre- Development development peak flow (which may require the implementation of one or more BMps), unless one of the two following conditions are met: The increase in peak flow between the pre- and post -development conditions does not exceed ten percent. The proposed new development meets all of the following criteria: overall impervious surface is less than 15 percent, and the remaining pervious portions of the site are utilized to the maximum extent practical to convey and control the stormwater runoff (as determined by the City Engineering Department). Upon completion of the development project, and prior to approval of a Certificate of Occupancy, the post -development peak flow will again be calculated to ensure compliance with the regulations detailed above. Section 32.089 of the City Ordinances establishes the administrative procedure for ensuring this step by stating, "No Certificate of Occupancy shall be issued by the Building Inspector until the Planning Department and the Engineering Department of the city have certified that site improvements have been completed in accordance with the plan previously submitted and approved." Because of the existence of local flooding problems, peak flow calculations may indicate the need for Stormwater detention in areas that would actually increase flooding problems as a result of their implementation. For sites that are in (or drain to) these flood -prone areas, exemptions may be granted on a case -by -case basis. Chapter 151 of the City Code of Ordinances details Flood Damage Prevention and addresses this problem, and is included in Appendix B. Section 151.04 (E) states that this ordinance is designed to "Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands." 2.1.3 Goldsboro's Choice for Protection of Riparian Buffers in New Developments The Neuse Stormwater Rule requires local governments to ensure that riparian areas are protected on new developments in accordance with the Riparian Buffer Rule (15A NCAC 2B .0233). The rule requires protecting and maintaining the 50-foot riparian buffers on all sides of intermittent and perennial streams, ponds, lakes, and estuaries in the Neuse River Basin. These waters must be shown on the most recent version of C:O=n naandSeftVs%wskata\My0o ntrad%Cnldh0MWM$a11SWMPPwiaedSWMPVmIDca&WPPkpoddw 2-5 1 City of Goldsboro Stormwater Management Program ' For Nitrogen Control in The Nease River Basin ' either a Natural Resources Conservation Service (MRCS) Soil Survey county map or a 1:24,000 scale (7.5 minute quadrangle) topographic map prepared by the US Program Plan for New ' Geological Survey (USGS). Development The City of Goldsboro will refrain from issuing local approvals for any new development activity that is proposed to take place within the first 50 feet adjacent to an affected water body, unless: ' a. the person requesting the approval does not propose to impact the riparian buffer of a surface water indicated on the NRCS or USGS maps listed above, or b. the property owner has received approval by DWQ. DWQ approval could be: ' - an on -site determination from DWQ that surface waters are not present, - an Authorization Certificate for a use designated as Allowable, - an Authorization Certificate and approval on a mitigation plan for a use ' designated as Allowable with Mitigation, or - a variance. As part of this Stormwater Management Program, Goldsboro will record riparian areas to be protected on new or modified plats. t2.2 Best Management Practices [BMPs) 2.2.1 Choosing SMPs Site planning practices that reduce nitrogen loadings from new development (including reducing impervious surfaces and protecting open spaces) will be encouraged; however, BMPs may still be required. Property owners will be instructed to consider the ability of the 13MP(s) to reduce their nitrogen loading within acceptable limits, as well as the issues of aesthetics, long-term maintenance, safety, and reliability of the BMP design. In conjunction with the Public Education component of this plan (Section 5.0), information sources will be made available to property owners and developers ' explaining the benefit to them of incorporating site planning practices into their new I CAD=Knaft end SetcnOwPbsteWly ISWMRPe i ed SWMPFhrl OOC*%WP Rep do 2-6 City of Goldsboro Stormulater Management Program For Nitrogen Control In The Meuse Bluer Basin development plans from the onset (reducing road widths, reducing minimum parking requirements, minimizing use of curb and gutter, allowing cluster or open -space Program Plan for New developments, allowing traditional neighborhood developments, and others). if they Development do not choose to incorporate these practices, or if BMPs are still required, information sources may be provided on the various BMPs available for nitrogen reduction, their individual effectiveness and cost, as well as data on which methods work best for the area's soil type(s). If more than one BMP is installed in series on a development, then the removal rate shall be determined through serial rather than additive calculations. As research and development in this field progresses, information sources on new BMP techniques or improvements in established BMP techniques may also be disseminated as part of the Public Education Action Plan, The BMPs which may currently be utilized for reducing nitrogen from new developments are listed below, The estimated total nitrogen removal rate for each BMP is included in parenthesis. • Wet detention ponds (25%) • Constructed wetlands (40%) • Open channel practices (30%) • Riparian buffers (30%) Bioretention (25%) Vegetated filter strips with level spreader (20%) • Sand filters (35%) • Proprietary BMPs (varies) if a builder or developer includes one or more BMPs as part of the site design, they will be required to provide an engineering certification of the design at the time they submit their Building Permit application. Prior to issuance of a Certificate of Occupancy, the builder or developer will be required to submit an engineering certification that the BMP was constructed as designed and is operating properly. 0 soap+ ad samrngMwsaWlaWy DDC tV304debmWtme11SWM 0­d SWMPTW ox tswP P pW.doc 2-7 2.2.2 Long -Term Maintenance Plan for BMPs The Inspection Department will conduct annual inspections of all BMPs as part of their inspection program. An annual inspection fee will be charged to fund this additional inspection program (as adopted by the City Council). A current list of all BMPs, their location, and status will be maintained by the Engineering Department to assist in the inspection process. BMPs will be required to be on the same lot as the new development, unless waived because of potential flooding problems, or unless an off - site location for the BMP has been approved by the City's Planning and Engineering Departments. The City of Goldsboro took the following approach for the long-term maintenance of BMPs: The City will notify the owner upon finding that maintenance is needed on a BMP. If the owner does not complete the maintenance in a timely manner (180 days), then the City will contract out the maintenance and recover costs in the manner it determines most appropriate. The Stormwater Management Ordinance (Appendix A) details the allowable BMPs as well as the maintenance of BMPs. The maintenance section refers to Section 96 of the Code of Ordinances, which contains the following subchapters: Improperly Operating BMPs are Prohibited, Responsibility for Maintenance; Compliance with Provisions; and Inspections and Annual Inspection Fee. t2.3 Local ordinance Review of Lend -Use Planting and Design Tecllltttt ues The Model Plan addresses the use of land -use planning provisions to reduce ' impervious surfaces with design techniques and thereby reducing the need for BMPs and associated maintenance concerns. Jurisdictions are required to show they reviewed local ordinances with regard to the following planning techniques (and the general ' advantages and disadvantages of incorporating these approaches at the local level) and show that they have provided adequate flexibility for developers to utilize planning ' measures to reduce impervious surfaces. This review is intended to look for opportunities where these measures could be allowed, or obstacles to their use could be removed. ' • Reducing road widths 1 • Reducing minimum parking requirements City of Goldsboro 5tormwater Management Program For Nitrogen Control In The Neuse River Basin Program Plan for New Development 1 C SOoa ft SoangaLw*.W.Uy Dx me its L3dde6o dYlwdISVJMPiieuhed SWMF lFkW D "MP ROPM dw 2-8 city of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin • Minimizing curb and gutter use Program Plan for New • Cluster or open -space developments Development • Traditional neighborhood developments • Mixed -use developments This review is underway by the Planning and Engineering Departments. It is anticipated that Goldsboro will insert verbiage into the City Ordinances as well as in the Technical Design and Details Manual which encourages, and allows for, variances in the items listed above. Variations in those planning and design techniques will be considered on a case -by -case basis provided that the measures would decrease impervious surface area, while still fulfilling the basic needs of the Planning and Engineering Departments. U ltrr MCUoa-wide and Inver -local Approaches Jurisdiction -wide and inter -local approaches may be incorporated into the City's Stormwater Management Program if appropriate information shows how they will achieve the nitrogen loading reduction requirements applicable to new development. Some ideas include: • Creating regional Stormwater management facilities (such as ponds). Would require on -site controls to locally protect against water quality degradation and flooding, and Neuse buffer requirements may impact the feasibility of some approaches. • "Land Banking" within the same watershed where development is occurring. Land should have significant water quality value and secured in a permanent conservation easement or equivalent legal mechanism prohibiting both farming and unapproved logging practices, tracked on GIS, and recorded on the plat or deed. Prior to incorporating such approaches into the City's Stormwater Management Program, it will demonstrate and quantify the associated nitrogen removals to DWQ and the EMC. C:\CoameNs and SeiMgsl—batalMy Doa�mh C. WsbaoSPtm@ASWMPlRe and SWMPFn4 P­dLSMP RepW duc 2-9 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Nense River Basin 2.5 EPWs Phase II Stom mater Rea0emeuts Program Plan for New EPA's Phase H Stormwater Rule contains two minimum control measures which fall Development within this Program Plan for New Development: Construction Site Runoff Control and Post -Construction Runoff Control. Because of the way the Neuse Stormwater Rule is structured — limiting nitrogen export, freezing peak runoff volumes, establishing protection for riparian buffers in new development, and requiring the installation and maintenance of BMPs where necessary — the majority of the Phase H requirements for development controls are addressed through this Program Plan. However, modifications have been incorporated into this SWMP to comply with the Phase 11 program in the future. 2.5.1 Construction Site Runoff Control The Construction Site Runoff Control Minimum Control Measure requires a regulatory mechanism to control polluted runoff from construction sites; a site plan review process to control erosion and sediment and other waste at the site; an inspection and enforcement program of control measures to deter infractions; and a procedure for the receipt and consideration of public enquires, concerns, and information submitted regarding local construction activities. The State Sedimentation Control Act (Title 15A, Chapter 4) and the State's NPDES general stormwater permit for construction activities substantially address all of these issues. 2.5.2 Post -Construction Runoff Control The Post -Construction Site Runoff Control Minimum Control Measure requires the development and implementation of strategies which include a combination of structural and/or nonstructural BMPs; an ordinance or other regulatory mechanism requiring the implementation of post -construction runoff controls; and a method to ensure adequate long-term operation and maintenance controls. These provisions are included in this Stormwater Management Program. cloaan,e,rts and Sep.Ww"t ta" Dx­fts Gdasb�nSWMPIP-4wd SWMP WI DOOW%WP PAPW.&C 2-10 3. Program Plan for Illegal Discharges 31 EstabllshlogLegal AaMoi4ttoControl Illegal 11scparges The Neuse Stormwater Rule requires that selected local governments establish a program to prevent, identify, and remove illegal discharges. Under Title XV, Land Usage, the Goldsboro City Council has adopted a new chapter (Chapter 156) for their Code of Ordinances entitled "An Ordinance to Implement Regulations Regarding Illegal Stormwater Discharges Related to the City of Goldsboro's Stormwater Management Program" to establish this authority within the City proper and its ETJ. This ordinance is included as Appendix C of this Stormwater Management Program and shows that Goldsboro will be able to: • Control the contribution of pollutants to the stormwater collection system associated with industrial activity. • Prohibit illegal discharges to the stormwater collection system. • Prohibit discharge of spills and disposal of materials other than stormwater to the stormwater collection system. • Determine compliance and noncompliance. • Require compliance and undertake enforcement measures in cases of noncompliance. Tables 3.1 and 3.2, respectively, identify some discharges that are and are not allowed to the stormwater collection system. 3.2 Collectlng lurtsdictlon-wide lnfonnatlon The City will collect geographic information at three increasing levels of detail: • First, most cursory level of information shall be collected for the entire jurisdiction. • Second level is a more detailed screening for high priority areas within the j urisdiction. City of Goldsboro Stormwater , Management Program For Nitrogen Control In The Neuse River Basin 1 Program Plan for Illegal Discharges I I i I � I � I � I � I � I I I I I I I I � I I G9Doc wts and SeWnlp5weatw&My Docune K3oldsboro4PhaaellSWMHfiwleed SWMmml DDoesMP Pzpwtwc Table 3.1 Discharges that May be Allowable to the Stormwater Collection System City of Goldsboro Stormwater Management Program For Nitrogen Control in The Neuse River Basin Program Plan for Illegal Discharges Waterline Flushing Landscape Irrigation Diverted Stream Flows Uncontaminated Rising Uncontaminated Ground Uncontaminated Pumped Ground Water Water Infiltration to Ground Water Stormwater Collection System Discharges from Potable Foundation Drains Uncontaminated Air Water Sources Conditioning Condensation Irrigation Water Springs Water from Crawl Space Pumps Footing Drains Lawn Watering Non-commercial Car Washing Flows from Riparian Habitats NPDES Permitted Discharges Street Wash Water and Wetlands Fire Fighting Emergency Wash Water from the Dechlorinated Backwash and Activities Cleaning of Buildings Draining Associated with Swimming Pools Table 3.2 Types of Discharges that are not Allowed to the Stormwater Collection System Dumping of Oil, Anti -freeze, Commercial Car Wash Industrial Discharges Paint, Cleaning Fluids Contaminated Foundation Cooling Water Unless No Washwaters from Commercial/ Drains Chemicals Added and Has Industrial Activities NPDES Permit Sanitary Sewer Discharges Septic Tank Discharges Washing Machine Discharges Chlorinated Backwash and Draining Associated with Swimming Pools • Third level is a very detailed investigation that shall be done upon the discovery of an illegal discharge. The purpose of collectingjurisdiction-wide information (which must be completed by the second annual report in October 2002) is to assist with identifying potential illegal discharge sources and characterizing illegal discharges after they are discovered. The Clka, as and Ss1bngM ubata" ConmanxOMsb�JSWMFVIA ed SWMPFM DocASW RwWL&c 3-2 City of Goldshore Stormwater 1 Management Program For Nitrogen Control In The Reuse River Basin Engineering Department will be responsible for collecting and mapping the jurisdiction -wide information which will be compiled at a scale no greater than Program Plan for Illegal 1:24,000 to show the following: Discharges ' • Location of sanitary sewers in areas of the major stormwater collection systems and the location of areas that are not served by sanitary sewers. • Waters that appear on the NRCS Soil Survey Maps and the USGS 1:24,000 scale topographic maps. ' • Land uses. Categories, at a minimum, should include undeveloped, residential, commercial, agriculture, industrial, institutional, publicly owned open space, and others. • Currently operating and known closed municipal landfills and other treatment, ' storage, and disposal facilities, including for hazardous materials. • Major stormwater structural controls, to include major stormwater outfalls and identification of their receiving waters (as required by Phase II). • Known NPDES permitted discharges to the stormwater collection system (this list can be obtained from DWQ). Written descriptions will be provided for map components as follows: • A summary table of municipal waste facilities that includes the names of the facilities, the status (open/closed), the types, and addresses. • A summary table of the NPDES permitted dischargers that includes the name I of the permit holder, the address of the facility and permit number. • A summary table of the major structural stormwater control structures that shows the type of structure, area served, party responsible for maintaining, and age of stricture. ' • A summary table of publicly owned open space that identifies size, location, and primary function of each open area. ciDoa %, and sett'vW wa6nteWy Oxunenl T-1,d-b-m\P weIISWMPP--wd SWMPF w D..M MP FlWpw doe 3-3 City of Goldsboro Stormwater Management Program For Nitrogen Control In ' The Nense River Basin 1 3.3 Mapping and neid Screening in High PrlorttyAreas Program Plan for Illegal As part of the October 2002 annual report, the Engineering Department will identify a Discharges high priority area for more detailed mapping and field screening (at least 20 percent of the jurisdiction area). Each subsequent year, another high priority area of at least 20 percent size will be chosen. In this way, Goldsboro will complete their high priority area mapping by 2007, which will meet expected EPA Phase R requirements. ' "High Priority" means the areas where it is most likely to locate illegal discharges (e.g., older development). The basis of the annual selection of each high priority area will be explained in the annual report. The first part of the screening process for the selected area is mapping of the ' stormwater system, which should include: • Locations of the outfalls of any pipes from nonindustrial areas that are greater than or equal to 36 inches. • Locations of the outfalls of any pipes from industrial areas that are greater than ' or equal to 12 inches. • Locations of drainage ditches that drain more than 50 acres of nonindustrial ' land. • Locations of drainage ditches that drain more than 2 acres of industrial land. • An accompanying summary table listing the outfalls that meet the above criteria that includes outfall ID numbers, location, primary and supplemental classification of receiving water, and use -support of receiving water. The second part of the screening process is conducting a dry weather field screening of all outfalls that meet the criteria to detect illegal discharges. The General Services Department will be responsible for overseeing the dry weather field screening which will not be conducted during or within 72 hours following a rain event of 0.1 inches or ' greater. In residential areas, field screening will be scheduled either before 9:00 am or after 5:00 pm (if possible), hours when citizens are most likely to be home and illegal discharges are more likely to be evident. A field screening process, such as that illustrated in Figure 3.1, will be followed. 1 G 50o —ft and SetugslwnabataWy OocuTw t %C(3 Usbom\PhtmAISW MPJlmiwd SW MP FaW Dmn WP Repo dl 3-4 If field screening shows that an outfall is dry, then the outfall should be checked for intermittent flow at a later date. If the field screening shows that an outfall has a dry weather flow, then a screening report for the outfall will be completed. The field screening report will contain information similar to that detailed in Table 3.3 (general information, field site description, visual observations, and any required sampling analyses). Analytical monitoring is required only if an obvious source of the dry weather flow cannot be determined through an investigation of the upstream stormwater collection system. Screening reports will be kept for five years. Outfalls with flow will be screened again within 24 hours for the parameters included in the field screening report. Any tests for ammonia and nitrate/nitrite that are purchased will be sensitive for 0.1 to 10 mg/L. Table 3.3 Field Screening Report Information Ciiy of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin Program Plan for Illegal Discharges General Information Sheet Number Outfall ID Number Date Time Date, Time and Quantity of Last Rainfall Event Field Site Description Location Type of Outfall Dominant Watershed Land Use(s) Visual Observations Photograph Deposits/Stains Odor Vegetation Condition Color Structural Condition Clarity Biological Floatables Flow Estimation Sampling Analysis * Temperature Nitrogen-Nitrate/Nitrite pH Fluoride or Chlorine Nitrogen -Ammonia * Analytical monitoring is required only if an obvious source of the dry weather flow cannot be determined through an investigation of the upstream stormwater collection system. 3A Ideotnying and RemOYhtg Illegal DhXhargm After the field screening is complete, the General Services Department will take measures to identify and remove illegal discharges. The jurisdiction -wide information compiled as the first step in this process will be consulted for information on land uses, infrastructure, industries, potential sources, and types of pollution that exist in the drainage area of the outfall. C.Doo-1 and 5eninjplwsa6aiaM.ly Cohn hlCMd..0—diSWMPPR MW SWMPFIW Do IWP R-Pom doe 3-5 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Nease River Basin After potential sources have been identified, the General Services Department will be responsible for planning a systematic field investigation to minimize the amount of Program Plan for Illegal resources required to identify the source. Several field methods may be used for Discharges identifying illegal discharges, with the simplest approach recommended, if that will suffice. From simplest to more complex, the recommended approaches are: • Site investigation. • Additional chemical analysis (recommend testing for fecal coliform if the ammonia concentration is found to exceed 1.0 mg.L). • Flow monitoring (multiple site visits recommended rather than a depth indicator). • Dye testing (fluorescent dye is recommended). • Smoke testing. • Television inspection. Documentation of the results of the office and field investigations will be kept on file for five years with the screening report. After the source of an illegal discharge is identified, enforcement action will be taken to have the source removed or redirected to the sanitary sewer. Appendix C, which contains the adopted ordinance to establish authority to control illegal discharges, also contains the authority to order a source removed (or redirected) and penalties for noncompliance. Records of compliance actions will be kept for five years with the screening report. In addition to keeping all screening reports on file, the Engineering Department will maintain a map of: • Points of identified illegal discharges. • Watershed boundaries of the outfalls where illegal discharges have been identified. CADwrntmt ud Sanags%we iaWF DwunoadGoldebaevWnse11SWMKP�ls d SWMPFwW DocOSMP RepWAw 3-6 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse Rifler Basin An accompanying table that summarizes the illegal discharges that have been identified that includes Iocation, a description of pollutant(s) identified, and Program Plan for illegal removal status. Discharges City personnel will be trained in how to conduct a thorough field screening, how to review the field screening results in conjunction with the jurisdiction -wide information collected previously, and how to plan an effective field investigation to identify the source of an illegal discharge. The training of City personnel to undertake the process of investigating and identifying illegal discharges will be multi -phased. Training materials (pamphlets, flyers, and/or booklets) will be disseminated to all involved personnel as part of Goldsboro's Public Education Action Plan (Section 5.0). It is anticipated that most (if not all) of these materials can be obtained from agencies such as DWQ and the US Environmental Protection Agency (EPA). In addition, the written training materials may be accompanied by seminars and hands-on field training. The General Services Department will be responsible for coordinating personnel training and for scheduling all illegal discharge activities. 3.5 Preveniing Discharges and Establlshing a Hotline The Planning and Finance Departments will contact persons who are responsible for establishments that are likely sources of illegal discharges (e.g., auto sales, rental, and repair businesses, lawn care companies, cleaners, and certain types of contractors). A Ietter (see sample letter in Appendix D) will be mailed to all such businesses that can be identified. The mailing list will be compiled from sources such as the Chamber of Commerce listings, the local Yellow Pages, and business tax rolls, and will be mailed before the first annual report is due in October 2001. By October 2001, the Community Affairs Department will establish an illegal discharge hotline as a cost-effective way to identify illegal discharges. There will be a recording advising citizens what to do if they call during nonbusiness hours, or in the case where an illegal discharge is perceived to be an emergency. The Inspection Department will investigate all potential illegal discharges identified through the hotline. Part of the Public Education Action Plan (discussed in Section 5.0) will be to educate citizens about what types of discharges should not go to the stormwater collection system and make them aware of the hotline. Table 3.4 is a summary table showing the phased implementation schedule for illegal discharges. COmlxneifb and ScWnowsabala" Doc wesWG id3tcn3V'haselfSWMRFWAaed SWMPFffw 0o \SMP %pw doe 3"7 Table 3.4 Phased Implementation Schedule for Illegal Discharge Activities Year Implementation Requirements Annual Report requirements By March 9, • Establish legal authority to • Submit report identifying 2001 address illegal discharges. established legal authority to meet requirements. By October • Collect jurisdiction -wide • Report on completion of 2002 information. jurisdiction —wide information collection. 0 Select high priority area for additional screening. 0 Submit map of high priority areas and reason for 0 Initiate illegal discharge selection. hotline. • Report on initiation of illegal discharge hotline. Each • Complete mapping and • Submit map of stormwater subsequent year field screening for high collection system in high after 2002 priority area. priority area upon request by DWQ. 0 Select next high priority area. a Document illegal discharges found and resulting action. 6 Identify and remove illegal discharges as encountered. • Report on hotline usage and actions taken. • Continue operating illegal discharge hotline. • Submit map of next high priority area and reason for selection. 3.6 EP%s Phase II Stermwater Beuulreium The Program Plan for Illegal Discharges outlined above for the Neuse Stormwater Rule, in conjunction with the Public Education Action Plan detailed in Section 5.0, addresses the expected requirements of EPA's Phase II Stormwater, Illicit Discharge City of Goldsboro stormwater Management Program For Nitrogen Control In The Neuse River Basin Program Plan for Illegal Discharges CSCocWnante end SenirWl. bntnWy Cocun d,\OoldcborolF'Iu+ OSWMKPe iU d SWWFiw1 O mVSMP Bepon doc 3"8 CitY of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin Detection and Elimination Minimum Control Measure. Adjustments have been made to this Stormwater Management Program to comply with the requirements of EPA's Program Plan for Illegal Phase II Stormwater rule based upon NCDENR's instructions for the Phase H Discharges Stormwater Permit. The Phase II Program includes the following: A storm sewer system map, showing the location of all outfalls and the names and location of all waters of the US that receive discharges from those outfalls. During the collection of jurisdiction --wide information, all waters will be mapped that appear on NRCS Soil Survey Map and USGS I:24,000 scale topographic map. Outfalls will be mapped during the mapping and field screening of each high -priority area; however, the outfall mapping schedule for this program (Neuse Stormwater Rule) must be accelerated to meet the expected Phase II requirements. • That an ordinance, or other regulatory mechanism, establish a prohibition on non -storm water discharges into the municipal separate storm sewer systems (MS4), and appropriate enforcement procedures and actions. The ordinances established in response to the Neuse Stormwater Rule will fulfill this requirement. • A plan to detect and address non -storm water discharges, including illegal dumping, into the MS4s. The ordinances established in response to the Neuse Stormwater Rule will fulfill this requirement. The education of public employees, businesses, and the general public about the hazards associated with illegal discharges and improper disposal of waste. The Public Education Action Plan (detailed in Section 5.0) lays the groundwork for a comprehensive stormwater education program for the City of Goldsboro. The required Phase 11 elements are already a part of this program. Additional elements have been added to the Action Plan for the Neuse Stormwater Rule now that the State has issued the Phase H Permit. The determination of appropriate best management practices and measurable goals for this minimum control measure. The Phase II Stormwater rules recommend four steps for their plan: (1) locate problem areas, (2) find the source, (3) remove/correct illicit connections, and (4) document actions taken. This Program Plan for Illegal Discharges addresses all of the Phase II components, and required only minimal changes to comply with Phase lI Stormwater requirements. C Tmnenta and Sff wgslwsabaiaWy Doc enlal(3oldsboroUPMmIISWMP Icv*ed SWWFm1 Do %SMP Repoddw 3-9 City of Goldsboro stormwater Management Program For Nitrogen Control In The Neuse River Basin 4. Retrofit locations Retrofit Locations 4.1 AnnualRevolltActlons Goldsboro will establish a program to identify places within existing developed areas that are suitable for retrofits. Based on their current census figures, Goldsboro will identify a minimum of three retrofit locations each year. Possible sites for retrofits will be selected by the Planning and Engineering Departments. The Engineering Department will then conduct a feasibility study of each site before compiling a final list of acceptable sites. This list will be submitted to the Stakeholders Committee to set the priority for each site, and then to the Steering Committee for approval of the final selections (see Section 5.0 for more information on the Stakeholders and Steering Committees). The retrofit information tables, which must be included in the annual report, will be prepared by the Engineering Department during each feasibility study. Retrofit opportunities will be considered acceptable if all of the following conditions have been investigated: • The retrofit, if implemented, clearly has the potential to reduce nitrogen tloading to the receiving water. • The watershed is clearly contributing nitrogen loading above background levels. • The landowner where the retrofit is proposed is willing to have the retrofit installed on his property (often the most difficult aspect of implementing a retrofit). • There is adequate space and access for the retrofit. • It is technically practical to install a retrofit at that location. Sites may be carried over to meet minimum requirements for up to two subsequent years provided that BMPslretrofits have not been implemented and the site continues to ' meet the criteria above on an annual basis. 4.2 Data Calloction aul feotifleauon Each retrofit opportunity that is identified will be accompanied by information to ' describe the location of the retrofit, the type of retrofit being proposed, the property I C?Doarna t. end SOW1Q k—Beata" 0ocunen41K3�*01tSWMPV-6M SW MPV.W Doc SMP PAPMt.6oc 4-1 owner, as well as basic information about the watershed and the receiving water. Table 4.1 (Table 4b from the Model Plan) or one very similar to it will be completed for each retrofit opportunity and be submitted on October 30 of each year, beginning in 2001, as part of the annual report. ' Table 4.1 Retrofit Opportunity Table Location description, including directions from a major highway Type and description of retrofit opportunity Current property owner Is the property owner willing to cooperate? Land area available for retrofit (sq. ft.) Accessibility to retrofit site Drainage area size (acres) Land use in drainage area (percent of each type of land use) Average slope in drainage area (%) Environmentally sensitive areas in drainage area (steep slopes, wetlands, riparian buffers, endangered/ threatened s ecies habitat) Approximate annual nitrogen loading froth drainage area (lbslacre/ ear) * Potential nitrogen reduction (lbs/ac/yr) Estimated cost of retrofit Receiving water DWQ classification of receiving water Use support rating for receiving water Other important information * Suggested methodology: Use Figure 2.2 from Section 2.0 (Method 2) to compute nitrogen export from the drainage area based on the amount of impervious surface, landscaped area and forested area in the watershed. City of Goldsboro 5tormwater ' Management Program For Nitrogen Control In The Neuse River Basin Retrofit Locations I � I � I I � I � I � I I I � I i I � I � C k[) c .ents and Selhrg.%mabet.Wy SWWriml Do \SMP ReW do 4-2 City of l;oldshoro Stormulater Management Program For Nitrogen Control In The Neuse River Basin DWQ will be responsible for posting the retrofit opportunities on its Web Page and also for notifying a minimum of I 1 organizations of the opportunities for retrofitting Retrofit Locations within existing developed areas. 4.3 Mapping Identified Betrofit Locations Goldsboro will prepare maps which show the locations of the retrofit opportunities (the mapping may be accomplished by using computers or with existing hard copy maps). The scale of the map will be large enough to adequately identify the following required parameters: • Drainage area to retrofit opportunity site. • Land uses within the drainage area. • Location of retrofit opportunity. • Property boundaries in the vicinity of the retrofit opportunity. • Significant hydrography (as depicted on USGS topographic maps and NRCS Soil Survey maps). • Roads. • Environmentally sensitive areas (steep slopes, wetlands, riparian buffers, endangered/threatened species habitat — where available). • Publicly owned parks, recreation areas, and other open lands. C:S kwomus and SWtt weebata\My Doum 9 Y.'.ddO—V' MIISWF RP"ised SWMF%Frnt Do \SMP RryorWoc 4-3 5. Public Education and Public Involvement 51 Public Motion Action Plan The Neuse Stormwater Rule requires that Goldsboro develop a locally administered environmental education program (a Public Education Action Plan) to address nitrogen loading issues. This Action Plan will outline the proposed education activities for the upcoming year, and will identify target audiences and anticipated costs of the program. Goldsboro will submit their annual Action Plan to DWQ for approval prior to October 1 of each year, starting October 1, 2001. The Action Plan will consist of activities from each of the two categories listed in Table 5.1. Innovative activities not included in this table may be considered on a case - by -case basis. All activities must be designed to raise awareness and educate the audience about water quality, nonpoint source pollution, and the effects of everyday activities on water quality and nutrient loading. At least one of these activities will be directed at educating the citizens about what types of discharges should not go to the stormwater collection system and to making them aware of the illegal discharge hotline. In addition to the Category 1 and 2 activities, this Action Plan will include two technical workshops in the first year and a toll free hotline for reporting illegal discharges. Table 5.1 Public Education Action Plan Category 1 and 2 Activities Category 1 Category 2 Demonstration Sites (for BMPs) Fact Sheets "Adopt -a -Program" Environmental Freebies Quarterly local newspaper articles Fertilizer Tags Storm drain marking Flyers Recognition Program (recognize environment friendly participants) Postmarks Web page Utility bill inserts Local Cable TV program Close-out Packages (new homeowners) Toll free hotline for reporting environmental problems Speak to civic organizations quarterly Environmental field day Technical Workshop (only applicable after I" year) Environmental Contest CRY of Goldsboro Stormwater Management Program For Nitrogen Control In The Meuse Bier Basin Public Education and Public Involvement C.and Setts,.5wsabataWy Oa wftZoWbwAPMsdISWMPJ'".wd SWMPFWW Doas%WP ft t.doc 5-1 Citll of Boldshoro Stormwater Management Program For Nitrogen Control In The Neuse River Basin As discussed in Section 2.2.1, information sources will be provided to property owners and developers explaining the benefit to them of incorporating site planning practices Public Education and into their new development plans from the onset. Information sources may also be Public Involvement provided on the various BMPs available for nitrogen reduction as well as information on new BMP techniques or improvements in established BMP techniques. For the training of City personnel to identify and remove illegal discharges (Section 3.4), training materials such as pamphlets, flyers, and/or booklets will be disseminated to all involved personnel by the General Services Department. It is anticipated that most (if not all) of these materials can be obtained from agencies such as DWQ and the US EPA. In addition, the written training materials may be accompanied by seminars and hands-on field training. 5.1.1 Planned Activities Goldsboro (with a population of less than 60,000) will include two Category I activities and two Category 2 activities in their annual Action Plan. The combination of activities selected by the City will be chosen so as to provide a general awareness of nitrogen loading issues and address a diverse audience. The ultimate goal of the Public Education Program is to utilize major media advertising (television, radio, and newspaper) to reach a broad audience (but may be cost prohibitive). Should Goldsboro use effective major media advertising, either independently or through a cooperative effort, then Goldsboro will be exempt from the minimum Category 1 and 2 requirements. As part of Goldsboro's integrative approach to managing their Stormwater Management Program, two separate advisory committees were formed to aid in the development of the City's Stormwater Plan: The Steering Committee, an internal management group, and a Stakeholder's Conuwttee, a select community group. Both committee's were convened on July 12 and August 17, 2000 to provide direct input into this Program Plan. The Steering Committee is composed of representatives from the City Manager's office, and the General Services, Recreation and Parks, Planning, Engineering, Community Affairs, and Finance Departments. The Charge to the Steering Committee ' included the need to assign responsibilities for program elements, consider manpower and budgetary needs, obstacles to implementation, and steps that could be taken to remove obstacles and/or provide incentives for program participation. It is anticipated 1 CSOoarrrerda and SaningalwubalaWy Oocv wft%C M3bomWKM 1ISWMP4%YWed SWMPF4w D[ %SSMP PkpD l.doc 5-2 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Meuse River Basin that the Steering Committee will continue to meet on a quarterly basis to review the implementation of the program and to address any new issues which may arise. Public Education and Public Involvement For the Stakeholder's Committee, individuals from the following concerns were invited to participate, along with representatives from the City Manager's office: the Chamber of Commerce, Seymour Johnson Air Force Base, Industry, Commercial Development, Wayne Community College, the Economic Development Corp., the Neuse River Foundation, a large and small developer, an engineer, and a concerned property owner (and flood victim). Although compliance with the Neuse River Rule (and eventually EPA's Phase II Rule) is mandatory, the City wanted to establish a means for active involvement and input by affected citizenry. It was explained to the Stakeholder's that only by voicing their concerns about program implementation, and by sharing their ideas for public education/participation and specific program incentives, could the program be tailored to best serve the citizens of Goldsboro. It is anticipated that this group, or one structured very similar to it, will continue to meet on a quarterly basis to discuss any problems and concerns they encounter during program implementation. This group is an excellent starting place for later community involvement in carrying out the program, and will help provide support for enforcement and funding initiatives. In addition, Goldsboro already has several entities in place which are useful in disseminating information to the public and for garnering their involvement. Community Affairs will utilize these groups as avenues for public education and outreach, and public participation/involvement. The Commission of Community Affairs was established to "inform the general public of existing local, state and federal policies, regulations and programs and how these particular policies, regulations and programs directly affect the lives of area residents." In addition, their purpose is to create a forum which permits open discussion and invites the free expression of public opinion, as well as to achieve and sustain an effective degree of citizen involvement. The Planning Commission was established to serve as an advisory board to make recommendations to the City Council on any matter presented to them by the Director of Planning and Community Development, by any local governing board, or by any Board member. The Advisory Committee on Community Development consists of ten citizens and residents of the City, with special efforts made to include a majority of members who are low- and moderate -income persons, members of minority groups, residents of area where significant amounts of activity are proposed or on -going, GA➢ocu m and S.Mrq,�we M.W y Coc tsr--d6hM1PM..11SWMPkRWi$W SWMPV,-1 D.-ISMP P.PW.d- 5-3 the elderly, the handicapped, the business community, and civic groups who are concerned about community development. At least two members from each community development area must be included. This committee, or one structured like it, could be used to play an active role in educating the general public on stormwater related issues. • The Youth Council offers an organization through which the youth of the community may benefit both themselves and their community. Stormwater concerns would be an excellent opportunity to initiate programs and projects that are of benefit to the youth and to the City of Goldsboro. 5.1.2 Technical Workshops During the first year of program implementation, General Services will take responsibility for conducting two technical workshops. One shall be designed to educate local government officials and staff, and the other for the development community (including engineers, developers, architects, contractors, surveyors, planners, and realtors). In subsequent years, workshops are considered an option under Category 2 activities, and will be considered for inclusion in the annual Education Action Flan. 5.2 Incorporating D=ng Resources and Programs Community teaming is encouraged in the Stormwater Rule, and Goldsboro will make every effort to research and incorporate existing resources and Stormwater education programs. Although Goldsboro's unique Action Plan will fulfill all public education requirements from the onset, the City recognizes that utilizing existing resources will not only result in a more consistent education effort for communities of all sizes, but will make the most efficient use of available resources and will reduce duplication of efforts. Teaming possibilities with Wayne County will continually be explored, particularly in regards to the following Public Education activities: • Major Media Advertising: If the City and County could implement effective major media advertising (radio, television, newspaper), they will become exempt from minimum Category 1 and 2 activities. ' + Category 1 and 2 activities: If effective major media advertising is not employed, it may prove easiest and most cost efficient to conduct planned activities together. C:%Docunenn wK$ SethngOwmMtaWty DocLm a tsX(I.MsbomW4meltSWMPlR kmd SW MPTkW Da \SMP P p tdoc CRY of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin Public Education and Public Involvement 5-4 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin • Workshops: The two technical workshops that must be conducted during the first year (one to educate local government officials and staff, and the other for Public Education and the development community) could be sponsored jointly, thereby reducing Public Involvement costs and duplication of efforts. 5.3 EPIrs Phase II stoMater Relloh nenlIS As detailed earlier in this section, Goldsboro already has several entities in place which are useful in disseminating information to the public and for garnering their involvement. These groups may become an integral part of Goldsboro's Phase H Stormwater Management Program which requires public education and outreach, and public participation/involvement. For Phase II, educational materials and strategies will be tailored to activities relevant to local situations and issues, while reaching a variety of audiences and communities including ethnic, minority, and low-income communities; academia and educational institutions; neighborhood and community groups; children; outdoor recreation groups; and business and industry. Goldsboro's Public Education Action Plan for the Neuse Stormwater Rule will serve as an excellent foundation for the City's Phase lI efforts, and will be expanded and/or tailored'on an annual basis. C.Zoc Glonle Gild Setlgr epkmabala" Doeu &- NCDldaborolPheseIISWMRPe IeW SW M?Final Dws SMP Rew.doc 5-5 City of Goldsboro ' Stormwater Management Program For Nitrogen Control In The Neuse River Basin 6. Pollution Prevention/Good Housekeeping Pollution Prevention/Good ' Another component of the Phase H Rule is the Pollution Prevention/Good Housekeeping Housekeeping Minimum Control Measure. The General Services Department has responsibility for the development and implementation of a maintenance program with the ultimate goal of preventing and reducing pollutant runoff from municipal operations into the storm sewer system. In addition, the program will include employee training on how to incorporate pollution prevention/good housekeeping ' techniques into municipal operations. If such components are not already an integral part of Goldsboro's Action Plan by the time this Minimum Control Measure is required by the Phase II Rule, these particular education and training initiatives will be incorporated into the SWMP by reference to the Public Education Action Plan. I CV)--t- and SattingslwaahataWFy Doc raVz\Gol ".\"-W1SWMPA-W d SWMPAW for SMP HapWAx 6" 1 T. Evaluaden and Repotting Annual Neuse River Basin Stormwater Management Program reports must be submitted to DWQ by October 30 of each year beginning in 2001. An implementation schedule for all of the major Neuse Stormwater Rule components is included in Appendix E. All reports must contain the following information: A. New Development Review/Approval The following information will be submitted as part of the annual reporting requirement: • Acres of new development and impervious surface based on plan approvals. • Acres of new development and impervious surface based on Certificates of Occupancy. • Summary of BMPs implemented and use of offset fees. • Computed baseline and net change in nitrogen export from new development that year (see Table 7.1 for specific reporting requirements). • Summary of maintenance activities conducted on BMPs. • Summary of any BMP failures and how they were handled. • Summary of results from jurisdictional review of planning issues. G'.lDonuments and S.%ngslws.ataVMy 0--.13tic-.ok We %Pta-11SWMP P—i.d SW MPIRnW Do ZMP Report.do 1 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin Evaluation and Reporting 1 1 1 1 1 1 1 1 Table 7.1 Specific Annual Nitrogen Loading Reporting Requirements 1. The predevelopmeut nitrogen load from all land developed during the past year. This can be determined by: • Taking total acres of cropland developed multiplied by 13.6 lbs/ac/yr, and adding • Total acres of pasture developed multiplied by 4.4 lbs/ac/yr for pasture, and adding • Total acres of forested land developed multiplied by 1.7 lbslaclyr, and adding • Total acres of residential land redeveloped multiplied by 7.5 lbs/ac/yr, and adding • Total acres of commercial and industrial lands redeveloped multiplied by 13.0 lbs/ac/yr. 2. The post development nitrogen load from all land developed during the past year without structural BMPs. 3. The post development nitrogen load from all land developed during the past year with structural BMPs. Unfortunately, it will be very difficult to document the improvements in nitrogen loading due to the implementation of nonstructural BMPs. However, jurisdictions are more than welcome to attempt this if they wish. 4. Pounds of nitrogen bought by developers making offset payments to the Wetland Restoration Program. 5. The net change in nitrogen loading for the year. This would be (Item 3 - Item 1) - Item 4. A positive number would denote an increase; a negative number would denote a decrease. 6. The reductions in nitrogen loading due to structural BMPs and Wetland Restoration Program payments. This would be (Item 2 - Item 3) + Item 4. This should be a positive number that represents the pounds of nitrogen removed that year as a result of implementing the Neuse Stormwater Rule. * This list of items that should be accounted for was agreed upon by the Neuse Stormwater Team during their June 1, 2000 meeting. City of Goldsboro Stermwater Management Program For Nitrogen Control in The Nense Biter Basin Evaluation and Reporting CO-ft end SenwVdlm batnWy docun tArl ldebataWlx 11SWMP, WWA SWMPTbM OoceVSPAP Pmpod.doc 7-2 B. Illegal Discharges The annual reporting requirements for illegal discharges are detailed in Table 7.2. Table 7.2 Annual Illegal Discharge Reporting Requirements Year Annual Report requirements By March 9, • Submit report identifying established legal authority to meet 2001 requirements. By October 2002 • Report on completion of jurisdiction -wide information collection. • Submit map of high priority areas and reason for selection. • Report on initiation of illegal discharge hotline. Each subsequent • Submit map of stormwater collection system in high priority year after 2002 area upon request by DWQ. • Document illegal discharges found and resulting action. • Report on hotline usage and actions taken. • Submit map of next high priority area and reason for selection. C. Retrofit Locations • Data on each retrofit opportunity (Table 4.1 or equivalent), • Maps of potential retrofit sites as specified in Section 4.3, and • The status of any retrofit efforts that have been undertaken within the jurisdiction. C:0--a nM S.H.,gMwmh6 ,Wly pocvnaiLslOoMleboraSPhesellSWMPJie✓lead SWMPIR dD. MP RegWdo City of Goldsboro 5tormwater ' Management Program For Nitrogen Control in The Meuse River Basin Evaluation and Reporting 1 t 7-3 D. Public Education The report must summarize the next years Action Plan and evaluate the implementation of the previous years Action Flan (if applicable). The report should include goals, activities completed, realized education program costs, explanation of experienced shortfalls, and a plan as to how the locality will address shortfalls. City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin Evaluation and Reporting C:40oarments and SeamgsX%wbeta\My poem«naV3o1d2bOrMmW1SWMRRn KM SWMRFlrml 00CFASMP Fopnn doc 7-4 City of Goldsboro Stormwater ' Management Program For Nitrogen Control In The Hense River Basin ' 8. EPA Phase 11 Measurable Goals 1 EPA Phase II Measurable The City of Goldsboro has designed their Stormwater Management Program to: Goals ' • Reduce the discharge of pollutants to the "maximum extent practicable" • Protect water quality; and • Satisfy the appropriate water quality requirements of the Clean Water Act. I Implementation of the MEP standard requires the development and implementation of BMPs and the achievement of measurable goals to satisfy each of the six minimum control measures. Under the Phase II Rule, the City of Goldsboro's Stormwater Management Program has six elements that, when implemented in concert, is expected to result in significant reductions of pollutants discharge into receiving water bodies. The six MS4 program elements, termed "minimum control measures," are outlined in Appendix F. Each is followed by a preliminary schedule of measurable goals, which is required for each minimum control measure, and is intended to gauge permit compliance and program effectiveness. The measurable goals, as well as the BMPs, ' reflect the needs and characteristics of the operator and the area served by its small MS4. Furthermore, they were chosen using an integrated approach that fully addresses the requirements and intent of the minimum control measure. 1 1 C�bawments and Segings�wsnbataWy DocumenlslGoGlaba�olPhaaallSWMPJievised SWMR ml OonLSMP P4pod.dx 8-1 1 Figure 2.1 Worksheet for Method 1: Quantifying Total Nitrogen Export from Residential Developments when Building and Driveway Footprints are Not Shown Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2). Step 3: Determine the TN export coefficient associated with right-of-way using Graph 1. Step 4: Determine the TN export coefficient associated with lots using Graph 2. Step 5: Multiply the areas in Column (2) by the TN export coefficients in Column (3) and enter in Column (4). Step 6: Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 7: Determine the export coefficient for site by dividing the total TN export from uses at the bottom of Column (4) by the total area at the bottom of Column (2). (1) (2) (3) (4) Type of Land Cover Area TN export coeff. TN export from use (acres) (Ibs/acl r) (lbs/ r) Permanently protected undisturbed 0.6 open sace (forest, unmown meadow) Permanently protected managed 1.2 opens ace (grass, landscaping, etc.) Right-of-way (read TN export from Graph 1) Lots (read TN export from Graph 2) TOTAL Graph 1: Total Nitrogen Export from Right -of -Way 25.0 20.0 4 15.0 - c Q 10,0 x w F 5.0 0.0 0% 20% 40% 60% 80% 100% 120% Percentage of Right -of -Way that is Pavement F-t C'�Doc tl and Semr-pkWMbataWy Ob Unoge6ad8bof C41SW W%Rwkwd SWMHFinal 0o \Rqr dec Figure 2.1 (cont'd). Worksheet for Method 1: Quantifying Total Nitrogen Export from Residential Developments when Building and Driveway Footprints are Not Shown Graph 2: Total Nitrogen Export from Lots Total Nitrogen Export from Lots 12.00 10.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Humber of Dwelling Units per Acre C:VDoc--ft and S.tti og —b.&My eecum ft%G-W-b \PhesellsWMPlFk I.,d SWMRF.—I pocaOgLmxloc F-2 Figure 2.2 Worksheet for Method 2: Quantifying Total Nitrogen Export from Residential/ Industrial/Commercial Developments when Footprints of all Impervious ' Surfaces are Shown Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2). Step 3: Multiply the areas in Column (2) by the TN export coefficients in Column (3) and enter ' in Column (4). Step 4: Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 5: Determine the export coefficient for site by dividing the total TN export from uses at the bottom of Column (4) by the total area at the bottom of Column (2). (1) (2) (3) (4) Type of Land Cover Area TN export coeff. TN export from use (acres) (lbslac/ r) (lbs/ r Permanently protected undisturbed 0.6 open sace (forest, unmown meadow) Permanently protected managed 1.2 open sace (grass, landscaping, etc.) Impervious surfaces (roads, parking 21.2 lots, driveways, roofs, paved storage areas, etc.) TOTA 1, --- The rule requires that all new developments achieve a nitrogen export of less than or equal to 3.6 pounds per acre per year. If the development contributes greater than 3.6 lbslac/yr of nitrogen, then the options shown in Table 2.2a are available based on whether the development is residential or nonresidential. Table 2.2a: Nitrogen Export Reduction Options Residential Commercial / Industrial If the computed export is less than 6.0 If the computed export is less than 10.0 lbs/ac/yr, then the owner may either: lbslac/yr, then the owner may either: I. Install BMPs to remove enough nitrogen to 1. Install BMPs to remove enough nitrogen to bring the development down to 3.6 bring the development down to 3.6 lbs/ac/yr. lbslac/yr. 2. Pay a one-time offset payment of $330/lb 2. Pay a one-time offset payment of $3301lb to to bring the nitrogen down to the 3.6 bring the nitrogen down to the 3.6 lbslac/yr. lbs/ac/yr. 3. Do a combination of BMPs and offset 3. Do a combination of BMPs and offset payment to achieve a 3.6 Ibs/ac/yr export. payment to achieve a 3.6 Ibs/ac/ r export. If the computed export is greater than 6.0 If the computed export is greater than 10.0 lbs/ac/yr, then the owner must use on -site lbs/ac/yr, then the owner must use on -site BMI's BMPs to bring the development's export down to bring the development's export down to 10.0 to 6.0 Ibs/ac/yr. Then, the owner may use one lbs/ac/yr. Then, the owner may use one of the of the three options above to achieve the three options above to achieve the reduction reduction between 6.0 and 3.6 lbs/ac/ r. between 10.0 and 3.6 lbslac/ r. G!D=-.band S"Vs%.UbaU" Dxvn.*A(ioldfboio e11SWMF'amW SWMM-kial 0.&,flp�,dW F-3 Figure 2.3 Peak Runoff Worksheet for Small Drainage Areas in Mid-Neuse Basin Pre -Development Undisturbed Managed Impervious Total Area Au = Am = At = AT = C (weighted av) 0.2 0.3 0.9 Equation 1 Cw = (0.2* Au+ 0.3*Am + 0.9*A] )/ AT CW = Time of Concentration Height of most remote point above outlet H = Length (maximum) of stormwater travel L = Equation 2'--' Toc = [(L'/H)' ]/12S Intensit Equation 3 I=112/(20 + Toc) I= Quantity of Flow Equation d QpRE = AT * CW * I QPRE Post-Develo ment Undisturbed Managed Impervious Total Area Au = AM = A, = AT = C (weighted av) 0.2 0.3 0.9 Equation I Cw = (0.2* Au+ 0.3 *AM + 0.9*At }/ AT CW = Time of Concentration Height of most remote point above outlet H = Length (maximum) of stormwater travel L = Equation 2 1,2 Toc = [(L /H)' ]V128 Toc = Intensity nation 3 I=112/(20 + Toc) I= Quantity of Plow Equation 4 Qpo$T = AT * CW * I QPOsT = Notes: • May use Figure 8.03a (Nomograph) from NC Erosion and Sediment Control Planning and Design Manual • Use equation or nomograph for • natural basins with well defined channels, • overland flow on bare earth, • and mowed grass roadside channels. For overland flow, grassed surfaces, multiply Toc by 2 For overland flow, concrete or asphalt surfaces, multiply TOC by 0.4 For concrete channels, multiply Toc by 0.2 Version 03/26/01 Prepared By Date Project CADm-wft and SN4ngslwaaWt.Wy Dm--tW3ohh &Om%Fha ISW MPP"*ed SW MAFnW Da IFK,-- d- Figure 3.1 Field Screening Process Screen outfall in high priority area Flow found Inspect and sample flow No flow Check for signs of intermittent flow Investigate source of flow, considering the following: • Jurisdiction -wide information collected • Field investigation of drainage area of outfall • Sampling data • Qualitative observations -- sheen, odor, turbidity, etc. Remove illegal discharge How No flow 1 found I Outfall OK * Checking for intermittent flow includes rechecking outfall at a later date as well as visual observations for evidence of intermittent flow. Note: Analytical monitoring is required only if an obvious source of the dry weather flow cannot be determined through an investigation of the upstream stormwater collection system. Q%Dm 11 .M and Sa WgMl balawrr DocunentaV(3aldsbaro4PMcNISW MF\Awfe•d SWMPI'nal DonW4r do F-5 City of Goldsboro ' Stormwater Management Program For Nitrogen Control In The Neuse River Basin APPENDIX A Ordinance to Implement Stormwater Management Regulations for New ' Development c"nacu„enn erd s.arirylw.enalaWly oon.�, a uw4 cides4oro WP"J& CMjd) o sties RepW,&c Goldsboro, North Carolina Code of Ordinances TITLE XV: LAND USAGE CHAPTER 155: STORMWATER MANAGEMENT FOR NEW DEVELOPMENT CHAPTER 155: STORMWATER MANAGEMENT FOR NEW DEVELOPMENT Section General Provisions 155.01 Statutory authorization Nutrient Reduction, Peak Runoff Control, and Protecting Riparian Buffers 155.02 Nutrient reduction requirements 155.03 Peak runoff control 155.04 Protecting riparian buffers Best Management Practices 155.10 Allowable best management practices 155.11 Maintenance of best management practices Building Permit, Review Fees, and Enforcement 155.20 Building permit and building permit review fees 155.21 Criminal penalties 155.22 Order to correct violation 155.23 Failure to correct violation; correction by city 155.24 Costs of correction 155.25 Failure to pay charges; lien created 155.26 Procedure deemed additional to other remedies GENERAL PROVISIONS § 155.01 STATUTORY AUTHORIZATION. The Legislature of the State of North Carolina has, in Chapter (T15A), Article (02B), Section (.0235), entitled Neuse River Basin - Nutrient Sensitive Waters Management Strategy; Basinwide Stormwater Requirements, designated specific local governments for new of development stormwater management requirements as part of the Neuse River 1 Storm waterOrd.doc - 1/8- 25 February 2003 Nutrient Sensitive Waters stormwater management strategy. Therefore, the City Council does ordain as follows in this chapter. (Ord. 2000-95, passed 11-20-00) NUTRIENT REDUCTION PEAK RUNOFF CONTROL, AND PROTECTING RIPARIAN BUFFERS § 155.02 NUTRIENT REDUCTION REQUIREMENTS. (A) Definition of new development/land disturbance. For purposes of this chapter, DEVELOPMENT OR LAND DISTURBANCE shall be defined to include the following: (1) Any activity that disturbs greater than one acre of land in order to establish, expand or modify a single-family or duplex residential development or a recreational facility, (2) Any activity that disturbs greater than one-half acre of land in order to establish, expand or modify a multi -family residential development or a commercial, industrial or institutional facility, (3) Any grubbing, stump removal and/or grading activity, (B) Exemptions. Agriculture, mining or forestry activities are not subject to the new development requirements of this chapter. (C) Vested rights. (1) Property owners that can demonstrate that they have vested rights as of the effective date of this chapter will not be subject to the requirements for new development. Vested rights may be based on at least one of the following: (a) Substantial expenditures of resources as determined by the Engineering Department (time, labor, and money) based on a good faith reliance upon having received a valid local government approval to proceed with the project, or (b) Having an outstanding valid building permit in compliance with G.S. § 153A-344.1 or G.S. § 160A-385.1, or (c) Having an approved site specific or phased development plan in compliance with G.S. § 153A-344.1 or G.S. § 160A-385.1. (2) Projects that require state permits, such as landfills, NPDES wastewater discharges, land application of residuals and road construction activities shall be considered to have vested rights if a state permit was issued prior to the effective date of this chapter. (D) Calculation of nitrogen export. The nitrogen export from each development must be calculated. This export will be calculated in pounds per acre per year (lb/ac/yr). The following methodologies will be used for calculating nitrogen export from new development (refer to the City of Goldsboro Stormwater Management Program for Nitrogen Control in The Neuse River Basin for calculating nitrogen export loading): Storm waterOrd.doc -2/8- 25 February 2003 1 (1) Method 1 is intended for residential developments where lots arc shown, but the actual footprints of buildings are not shown on the plans. (2) Method 2 is for residential, commercial, and industrial developments when the entire footprint of the roads, parking lots, buildings, and any other built -upon area is shown on the site plans. (3) For nonresidential subdivisions where the impervious surfaces are not shown on the plans at the time of submittal, the developer or builder will specify areas of impervious surface,, undisturbed open space, and managed open space in their building permit application, assuming the maximum impervious surfaces and minimum open space for the project design. The developer or builder will then use Method 2 for their calculation. (4) For redevelopment projects, a modified procedure as described by the NC ' Division of Water Quality (DWQ) will be used to determine the total change in nitrogen loading. (E) Nitrogen export standards. (1) All new development will be limited to a nitrogen export of 3.6 pounds per acre per year (lbs/ac/yr). Property owners will have the option to partially offset projected nitrogen loads by funding wetland or riparian area restoration through the NC Wetlands Restoration Program. As established by Rule 15A NCAC 2B .0240, the rate shall be $11/lb/yr, at an amount sufficient to fund 30 years of nitrogen reduction. The result is a one-time offset payment of $330/lb/ac, which must be paid prior to approval of the development plan. However, no new residential development will be permitted to exceed a total nitrogen loading rate of 6.0 lbs/ac/yr, and no new nonresidential development will be permitted to exceed 10.0 lbs/ac/yr. (2) If the development contributes greater than 3.6 pounds per acre per year of nitrogen, then the table below summarizes the options available, depending upon whether the development is residential or nonresidential. Any changes to the nitrogen export standards approved by the Environmental Management Commission will be adopted by reference. StormwaterOrd.doc - 3/8- 25 February 2003 Nitrogen Export Reduction Options Residential Commercial/Industrial If the computed export is less than 6.0 If the computed export is less than 10.0 lbs/ac/yr then the owner may either: lbs/ac/yr, then the owner may either: LInstall BMPs to remove enough nitrogen 1.Install BMWs to remove enough nitrogen to bring the development down to 3.6 to bring the development down to 3.6 lbs/ac/yr. lbs/ac/yr. 2.Pay a one-time offset payment of $330/lb 2.Pay a one-time offset payment of $330/lb to bring the nitrogen down to the 3.6 to bring the nitrogen down to the 3.6 lbs/ac/yr. lbs/ac/yr. 3.Do a combination of BMPs and offset 3.Do a combination of BMPs and offset payment to achieve a 3.6 lbslaclyr export. payment to achieve a 3.6 ibs/ac/yr export. If the computed export is greater than 6.0 If the computed export is greater than 10.0 Ibs/ac/yr, the owner must use on -site lbslaclyr, the owner must use on -site BMPs to bring the development's export down to BMPs to bring the development's export 10.0 lbslaclyr. Then, the owner may use down to 6.0 Ibs/ac/yr. Then, the owner one of the three options above to achieve the reduction between 10.0 and 3.6 may use one of the three options above to lbs/ae/yr, achieve the reduction between 6.0 and 3.6 lbs/ac/yr. (3) If an offset payment is being made to the Wetlands Restoration Program, the owner must provide the city with evidence that DWQ has received payment prior to the city's issuance of a building permit. (Ord. 2000-95, passed 11-20-00) § 155.03 PEAK RUNOFF CONTROL. (A) There shall be no net increase in peak stormwater runoff flow leaving a new development site from the pre -development conditions for the 1-year, 24-hour storm as determined by calculating the pre- and post -development runoff in accordance with the City of Goldsboro Stormwater Management Program for Nitrogen Control in The Neuse River Basin. (B) The Rational Method is the most common method for computing the peak rate of runoff from small drainage basins (up to 150 acres) and will be used to determine the peak flow from both the pre -development (performed prior to issuance of the building permit) and post -development (performed prior to issuance of the certificate of occupancy) conditions. If peak runoff needs to be calculated for a larger drainage area (more than 150 acres), the peak discharge method as described in the USDA Soil Conservation Service's Technical Release Number 55 (TR-55) will be employed for StormwaterOrd.doc - 4/8- 25 February 2003 1 computing the pre- and post -development conditions. (Ord. 2000-95, passed 11-20-00) § 155.04 PROTECTING RIPARIAN BUFFERS. (A) Establishment of buffer. Riparian areas must be protected on new developments in accordance with the Riparian Buffer Rule (15A NCAC 213 .0233). The rule requires for protecting and maintaining the 50-foot riparian buffers on all sides of intermittent and perennial streams, ponds, lakes, and estuaries in the Neuse River Basin. These waters must'be shown on the most recent version of either a Natural Resources Conservation Service (NRCS) soil survey county map or a 1:24,000 scale (7.5 minute quadrangle) topographic map prepared by the U.S. Geological Survey (USGS). The city will refrain from issuing local approvals for any new development activity that is proposed to take place within the first 50 feet adjacent to an affected water body, unless: (1) The person requesting the approval does not proposed to impact the riparian buffer of a surface water indicated on the NRCS or USGS maps listed above, or be: (2) The property owner had received approval by DWQ. DWQ approval could (a) An on -site determination from DWQ that surface waters are not present; (b) An authorization certificate for a use designated as allowable; (c) An authorization certificate and approval on a mitigation plan for a use designated as allowable with mitigation; or (d) A variance. (B) Description of buffers on development plans. Riparian areas to be protected will be recorded on new or modified plats. If the plat shows an encroachment into a riparian buffer, the appropriate DWQ approval must accompany the preliminary and fiend plat submissions. (Ord. 2000-95, passed 11-20-00) BEST MANAGEMENT PRACTICES ' § 155.10 ALLOWABLE BEST MANAGEMENT PRACTICES. (A) The following best management practices may be utilized for nitrogen reduction: Wet detention ponds Constructed wetlands ' Open channel practices Riparian buffers Bioretention Vegetated filter strips with level spreader StormwaterOrd.doc - 518- 25 February 2003 Sand filters Proprietary BMPs (B) The total nitrogen (TN) BMP removal rates to be used in calculating nitrogen reductions are provided in the table below. Any state -approved modifications or additions to the list of BMPs available for nitrogen reduction and/or determinations of TN removal rates are adopted by reference. BMP Types, TN Removal Rates and Design Standards BMP Types TN Removal Rate Design Standards Based on Current Literature Studies Wet detention ponds 25% NC and MD Design Manuals Constructed wetlands 40% NC and MD Design Manuals Open channel practices 30% NC and MD Design Manuals Riparian buffers 30% Neuse Riparian Buffer Rule (15A NCAC 213.0233) Bioretention 25% NC and MD Design Manuals Vegetated filter strips with level 20% NC and MD Design spreader Manuals and other literature information Sand filters 35% NC and MD Design Manuals Proprietary BMPs Varies Per manufacturer subject to DWQ approval (C) If more than one BMP is installed in series on a development, then the removal rate shall be determined through serial rather than additive calculations. For example, if a wet detention pond discharges through a riparian buffer, then the removal rate shall be estimated to be 47.5%. The pond removes 25% of the nitrogen and discharges 75%n into the buffer. The buffer then removes 30% of the nitrogen discharged from the pond, which is 22.5%. The sum of 25 and 22.5 is 47.5. The removal rate is not 25% plus 30%. (Ord. 2000-95, passed 11-20-00) § 155.11 MAINTENANCE OF BEST MANAGEMENT PRACTICES. All best management practices that are implemented to achieve nitrogen reduction and StormwaterOrd.doc - 6/8- 25 February 2003 flow attenuation will require a maintenance plan. For the purposes of this chapter refer to: (A) Section 96.40, Improperly Operating BMPs (Stormwater Control Facilities) are Prohibited; Responsibility for Maintenance. (B) Section 96.41, Compliance with Provisions. (C) Section 96.42, Inspections and Annual Inspection Fee. (Ord. 2000-95, passed 11-20-00) BUILDING PERMIT, REVIEW FEES, AND ENFORCEMENT § 155.20 BUILDING PERMIT AND BUILDING PERMIT REVIEW FEES. (A) As of the effective date of the adoption of this chapter, any builder applying for a building permit must submit his calculations for nitrogen loading and peak runoff with both the preliminary and final plats. Application for a building permit constitutes a certification by the developer or builder that all provisions of this chapter have been fully met and that the calculations for nitrogen loading and peak runoff, as shown on the preliminary and final plats, are correct. Any BMP requiring engineering design will have the engineer's seal and signature affixed to the design drawing, and the engineer's seal will attest that the design for the BMP was completed in accordance with good engineering practices. (B) The City Council may set a fee structure for the cost of reviewing all building ' permit applications for compliance with this chapter, and the fee schedule will be as shown in the City of Galdsboro Stormwater Management Program for Nitrogen Control in the Neuse River Basin. (Ord. 2000-95, passed 11-20-00) § 155.21 CRIMINAL PENALTIES. ' Any person who is found in violation of any provision of this chapter, rule, regulation or order duly adopted or issued pursuant to this chapter shall be guilty of a misdemeanor, punishable by a fine not to exceed $500. Each violation shall be a separate offense. (Ord. 2000-95, passed 11-20-00) ' § 155.22 ORDER TO CORRECT VIOLATION. Upon a determination that such a violation exists, the Director of Inspections or his designee shall notify, in writing, the owner of the premises and shall order the prompt correction thereof. The owner will be allowed 180 days from the receipt of such written notice to comply with the provisions of this chapter. (Ord. 2000-95, passed 11-20-00) § 155.23 FAILURE TO CORRECT VIOLATION; CORRECTION BY CITY. If any person, having been ordered to correct a known violation of this chapter, fails, neglects, or refuses to correct the condition(s) within 180 days from receipt of the order, the Director of Inspections shall cause the condition to be remedied by having employees StormwaterOrd.doc - 7/8- 25 February 2003 of the city or other designated persons go upon the premises and perform the necessary corrections under the supervision of an officer or employee designated by the City Manager. (Ord. 2000-95, passed 11-20-00) § 155.24 COSTS OF CORRECTION. The actual cost incurred by the city to bring the development into compliance with the provisions of this chapter shall be charged to the owner of the development. They will be mailed a statement. of charges with instructions that such charges are due and payable within 30 days from the receipt thereof. (Ord. 2000-95, passed I 1-20-00) § 155.25 FAILURE TO PAY CHARGES; LIEN CREATED. In the event charges for the correction of the violation are not paid within 30 days after the receipt of a statement of charges as provided in ' 155.24 above, such charges shall become a lien upon the land or premises where the violation existed, and shall be collected as unpaid ad valorem taxes, as provided in G.S. §160A-193. In the event the person or persons found in violation of this chapter have divested themselves of the land or premises where the violation existed, the city may pursue the responsible person or persons for payment of the charges through other legal means. (Ord. 2000-95, passed 11-20-00) § 155.26 PROCEDURE DEEMED ADDITIONAL TO OTHER REMEDIES. The procedure set forth in this subchapter shall be in addition to any other remedies that may now or hereafter exist under law for the correction of such violations as outlined in this chapter, and this subchapter shall not prevent the city from proceeding in a criminal action against any person, firm, or corporation violating the provisions of this subchapter as provided in G.S. § 14-4. (Ord. 2000-95, passed 11-20-00) Disclaimer: This Code of Ordinances and/or any other documents that appear on this site may not reflect the most current legislation adopted by the Municipality. American Legal Publishing Corporation provides these documents for informational purposes only. These documents should not be relied upon as the definitive authority for local legislation. Additionally, the formatting and pagination of the posted documents varies from the formatting and pagination of the official copy. The official printed copy of a Code of Ordinances should be consulted prior to any action being taken. For further information regarding the official version of any of this Code of Ordinances or other documents posted on this site, please contact the Municipality directly or contact American Legal Publishing toll -free at 800-445-5588. O 2002 American Legal Publishing Corporation techsu ort@amle al.com 1.800.445.5588. StormwaterOrd.doc - 8/8- 25 February 2003 1 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Neuse River Basin APPENDIX B Flood Damage Prevention Ordinance C:boamdYs — Son:Ww.an "Dav�xhoml ft& OokM= SMPANAL. Cvkkbm SMP Report &c Goldsboro, North Carolina Code of Ordinances TITLE X V: LAND USAGE CHAPTER 151: FLOOD DAMAGE PREVENTION CHAPTER 151: FLOOD DAMAGE PREVENTION Section General Provisions 151.01 Short title 151.02 Statutory authorization 151.03 Findings of fact 151.04 Statement of purpose 151.05 Objectives 151.06 Definitions 151.07 Application of provisions 151.08 Basis for establishing the areas of special flood hazard 151.09 Compliance with provisions 151.10 Abrogation and greater restrictions 151.11 Interpretation 151.12 Warring and disclaimer of liability Permit and Certification Requirements 151.25 Building permit required 151.26 Requirements for building permit and certification Flood hazard Reduction 151.35 General standards 151.36 Specific standards 151.37 Standards for streams without established base flood elevations and/or floodways 151.38 Standards for subdivision proposals Administration and Enforcement I FloodOrd.doc - 1/20- 25 February 2003 151.50 Designation of Local Administrator 151.51 Duties and responsibilities of Assistant Public Utilities Director 151.52 Inspections of work in progress 151.53 Stop -work orders 151.54 Revocation of permits 151.55 Periodic inspections 151.56 Violations to be corrected 151.57 Actions in event of failure to take corrective action 151.58 Order to take corrective action 151.59 Appeal 151.60 Failure to comply with order 151.61 Variance procedures 151.99 Penalty GENERAL PROVISIONS § 151.01 SHORT TITLE. This chapter shall be known as the "Flood Damage Prevention Ordinance," and the maps herein referred to are identified by the titles. (FIRM) "Flood Insurance Rate Map" and (FI•IBM) "Flood Hazard Boundary Map". (Ord. 1991-50, passed 8-5-91) § 151.02 STATUTORY AUTHORIZATION. The Legislature of the State of North Carolina has in G.S. §§ 143-215.51 et seq., 160A- 381 et seq., 160A-411 et seq., and 160A-456 et seq., delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the City Council does ordain as follows in this chapter. (Ord. 1991-50, passed 8-5-91) § 151.03 FINDINGS OF FACT. (A) The flood hazard areas of the city are subject to periodic inundation which results in loss of life, property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures of flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety, and general we] fare. (B) These flood losses are caused by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities, and by the occupancy in flood hazard areas by uses vulnerable to floods or hazardous to other lands which are FloodOrd.doc - 2/20- 25 February 2003 ' inadequately elevated, floodproofed, or otherwise unprotected from flood damages. (Ord. 1991-50, passed 8-5-91) § 151.04 STATEMENT OF PURPOSE. ' It is the purpose of this chapter to promote the public health, safety, and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to: ' (A) Restrict.or prohibit uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increases in erosion or in ' flood heights or velocities; (B) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; 1 (C) Control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters; (D) Control filling, grading, dredging, and other development which may increase erosion or flood damage; and 1 (E) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands. (Ord. 1991-50, passed 8-5-91) § 151.05 OBJECTIVES. The objectives of this chapter are to: (A) Protect human life and health; (B) Minimize expenditure of public money for costly flood control projects; (C) Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; (D) Minimize prolonged business interruptions; (E) Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets, and bridges located in floodplains; (F) Help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize flood blight areas; and (G) insure that potential home buyers are notified that property is in a flood area. (Ord. 1991-50, passed 8-5-91) § 151.06 DEFINITIONS. For the purpose of this chapter the following definitions shall apply unless the context clearly indicates or requires a different meaning. APPEAL. A request from a review of the Local Administrator's interpretation of any FloodOrd.doc - 3/20- 2.5 February 2003 provision of this chapter. ADDITION (TO AN EXISTING BUILDING). Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load -bearing wall other than a fire wall. Any walled and roofed addition which is connected by a fire wall or is separated by independent perimeter load -bearing walls is new construction. AREA OF SPECIAL FLOOD HAZARD. The land in the floodplain within a community subject to a 1% or greater chance of being equalled or exceeded in any given year. BASE FLOOD. The flood having a 1% chance of being equalled or exceeded in any given year. BASEMENT. That lowest level or story which has its floor subgrade on all sides. BREAKAWAY WALL. A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system. A BREAKAWAY WALLshall have a design -safe loading resistance of not less than ten and no more than 20 pounds per square foot. A wall with loading resistance of more than 20 pounds per square foot requires a professional engineer or architect's certificate. BUILDING. Any structure built for support, shelter or enclosure for any occupancy or storage. DEVELOPMENT. Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials. ELEVATED BUILDING. A nonbasement building built, in the case of a building in Zones Al-A30, AE, A, A99, AO, AH, B, C or X to have the top of the elevated floor, or in the case of a building in Zones V1-V30, VE or V to have the bottom of the lowest horizontal structural member of the elevated floor above the ground by means of pilings, columns (posts and piers), shear walls parallel to the flow of water and, adequately anchored so as not to impair the structural integrity of the building during a flood up to the magnitude of the base flood. In the case of Zones Al-A30, AE, A, A99, AO, AH, B, C and X, ELEVATED BUILDINGalso includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of flood waters. In the case of Zones V I-V30, VE, or V, ELEVATED BUILDINGal so includes a building otherwise meeting the definition of ELEVATED BUILDING, even though the area below is enclosed by means of breakaway walls if the breakaway walls meet the standards of § t51.36(E). EXISTING MANUFACTURED HOME PARKor MANUFACTURED HOME SUBDIVISION. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of this chapter. F'loodOrd.doc - 4120- 25 February 2003 1 EXPANSION TO AN EXISTING MANUFACTURED HOME PARKor SUBDIVISION. The preparation of the additional sites by the construction of facilities ' for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either- final site grading or the pouring of concrete slabs). FLOODor FLOODING. A general and temporary condition of partial or complete inundation of normally dry land areas from: ' (1) The overflow of inland or tidal waters; and (2) The unusual and rapid accumulation of runoff of surface waters from any 1 source. FLOOD HAZARD BOUNDARY MAP (FHBM). An official map of a community, issued by the Federal Emergency Management Agency, where the boundaries of the 1 areas of special flood hazard have been defined as Zone A. FLOOD INSURANCE RATE MAP (FIRM). An official map of a community, on which the Federal Emergency Management Agency has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. FLOOD INSURANCE STUDY. The official report provided by the Federal Emergency Management Agency. The report contains flood profiles, as well as the Flood Boundary Floodway Map and the water surface elevation of the base flood. t FLOODWAY. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. ' FLOOR. The top surface of an enclosed area in a building (including basement), such as, top of slab in concrete slab construction or top of wood flooring in wood frame construction. The term FLOORdoes not include the floor of a garage used solely for ' parking vehicles. FUNCTIONALLY DEPENDENT FACILITY. A facility which cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long-term storage, manufacture, sales or service facilities. HIGHEST ADJACENT GRADE. The highest natural elevation of the ground surface, prior to construction, next to the proposed walls of the structure. HISTORIC STRUCTURE. Any structure that is: (1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of Interior as meeting the requirements for individual listing on the National Register; (2) Certified or preliminarily determined by the Secretary of Interior as contributing to the historical significance of a registered historic district or a district 1 FloodOrd.doc - 5/20- 25 February 2003 preliminarily determined by the Secretary to qualify as a registered historic district; (3) Individually listed on a state inventory of historic places; or (4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified by an approved state program as determined by the Secretary of Interior, or directly by the Secretary of Interior in states without approved program. LEVEE. A man-made structure, usually an earthen embankment, deigned and constructed in accordance with sound engineering practices to contain, control or divert the flow of water so as to provide protection from temporary flooding. LOWEST FLOOR. The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement area is not considered a building's lowest floor provided that such an enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of this chapter. MANUFACTURED HOME. A structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term MANUFACTURED HOMEdoes not include a recreational vehicle. MANUFACTURED HOME PARKor SUBDIVISION. A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. MEAN SEA LEVEL. The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of this chapter, the term is synonymous with National Geodetic Vertical Datum (NGVD). NATIONAL GEODETIC VERTICAL DATUM (NGVD.) As corrected in 1929, is a vertical control used as a reference for establishing varying elevations within the floodplain. NEW CONSTRUCTION. Structures for which the start of construction commenced on or after the effective date of this chapter and includes any subsequent improvements to such structures. NEW MANUFACTURED HOME PARKor SUBDIVISION. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete slabs) is completed on or after the effective date of this chapter. NONCONFORMING BUILDINGor USE. Any legally existing building or use which fails to comply with the provisions of this chapter. RECREATIONAL VEHICLE. A vehicle which is: (1) Built on a single chassis; FloodOrd.doc - 6/20- 25 February 2003 (2) 400 square feet or less when measured at the largest horizontal projection; (3) Designed to be self-propelled or permanently towable by a light duty truck; and (4) Designed primarily not for use as a permanent dwelling, but as temporary living quarters for recreational, camping, travel or seasonal use. REMEDY A VIOLATION. To bring the structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of this chapter or otherwise deterring future similar violations, or reducing federal financial exposure with regard to the structure or other development. START OF CONSTRUCTION (for other than new construction or substantial improvements under the Coastal Barrier Resources Act (P.L. 97-348.)) includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of a structure (including a manufactured home) on a site, such as tthe pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations, or the erection ' of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building. STRUCTURE. For floodplain management purposes, a walled and roofed building, a manufactured home, including a gas or liquid storage tank, or other man-made facilities or infrastructures that are principally above ground. SUBSTANTIAL DAMAGE. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50% of the market value of the structure before the damage occurred. See definition of SUBSTANTIAL IMPROVEMENT. SUBSTANTIAL IMPROVEMENT. Any repair, reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure before the start of construction of the improvement. The term SUBSTANTIAL IMPROVE, MENTincludes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include either: any project of improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which arc the minimum necessary IFloodOrd.doe - 7/20- 25 February 2003 to, assure safe living conditions; or, any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure. SUBSTANTIALLY IMPROVED EXISTING MANUFACTURED HOME PARKor SUB -DIVISION. Where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50% of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced. VARIANCE. A grant of relief to a person from the requirements of this chapter which permits construction in a manner otherwise prohibited by this chapter where specific enforcement would result in unnecessary hardship. VIOLATION. The failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in §§ 151.26, 151.35 through 151.38 and 151.50 through 151.61 is presumed to be in violation until such time as that documentation is provided. (Ord. 1991-50, passed 8-5-91) § 151.07 APPLICATION OF PROVISIONS. This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city. (Ord. 1991-50, passed 8-5-91) § 151.08 BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD HAZARD. The areas of special flood hazard identified by the Federal Emergency Management Agency in its Flood Insurance Study for the city, dated December 1, 1981, with accompanying maps and other supporting data, and any revision thereto are adopted by reference and declared to be a part of this chapter. (Ord. 1991-50, passed 8-5-91) § 151.09 COMPLIANCE WITH PROVISIONS. No structure or land shall hereafter be located, extended, converted or structurally altered without, full compliance with the terms of this chapter and other applicable regulations. (Ord. 1991-50, passed 8-5-91) Penalty, see § 151.99 § 151.10 ABROGATION AND GREATER RESTRICTIONS. This chapter is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this chapter another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (Ord. 1991-50, passed 8-5-91) FloodOrd.doc - 8/20- 25 February 2003 11 § 151.11 INTERPRETATION. In the interpretation and application of this chapter all provisions shall be: considered ' as minimum requirements; liberally construed in favor of the governing body; and, deemed neither to limit nor repeal any other powers granted under state statutes. ' (Ord. 1991-50, passed 8-5-91) § 151.12 WARNING AND DISCLAIMER OF LIABILITY. t The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering consideration. Larger floods can and will occur on rare occasions. Flood heights may be increased by man- made or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the city or by any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder. t(Ord. 1991-50, passed 8-5-91) PERMIT AND CERTIFICATION REQUIREMENTS ' § 151.25 BUILDING PERMIT REQUIRED. A building permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development or building activities. (Ord. 1991-50, passed 8-5-91) Penalty, see § 151.99 § 151.26 REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATION. Application for a building permit shall be made to the Director of Inspections on forms furnished by the Inspector prior to any development or building activities. The building permit may include, but not be limited to, plans in duplicate drawn to scale showing the nature, location, dimensions and elevations of the area in question; existing ' or proposed structures; and the location of fill materials, storage areas, and drainage facilities. Specifically, the following information is required: (A) Where base flood elevation data is provided in accordance with § 151.51(J), the application for a building permit within the Zone A on the Flood Insurance Rate Map shall show: (1) The elevation (in relation to mean sea level) of the lowest floor (including basement) of all new and substantially improved structures; and (2) If the structure has been floodproofed in accordance with § 151.36(B), the elevation (in relation to mean sea level) to which the structure was floodproofed. (B) Where the base flood elevation data is not provided, the application for a building permit must show construction of the lowest floor at least two feet above the highest adjacent grade. (C) Where any watercourse will be altered or relocated as a result of proposed 1 FloodOrd.doc - 9120- 25 February 2003 development, the application for a building permit shall include a description of the extent of watercourse alteration or relocation; an engineering report on the effects of the proposed project on the flood -carrying capacity of the watercourses and the effects to properties located both upstream and downstream; and, a map showing the location of the proposed watercourse alteration or relocation. (D) When a structure is floodproofed, the applicant shall provide a certificate from a registered professional engineer or architect that the nonresidential floodproofed structure meets the floodproofing criteria in § 151.36(B). (E) A floor elevation or floodproofing certification is required after the lowest floor is completed. Within 21 calendar days of establishment of the lowest floor elevation, or floodproofing by whatever construction means, whichever is applicable, it shall be the duty of the permit holder to submit to the Local Administrator a certification of the elevation of the lowest floor, or floodproofed elevation, whichever is applicable, as built, in relation to mean sea level. The certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work done within the 21 day calendar period and prior to submission of the certification shall be at the permit holder's risk. The Local Administrator shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop -work order for the project. (Ord. 1991-50, passed 8-5-91) FLOOD HAZARD REDUCTION § 151.35 GENERAL STANDARDS. In all areas of special flood hazard the following provisions are required: (A) All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure; (B) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; (C) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damages; (D) Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (E) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system; (F) New and replacement sanitary sewage systems shall be designed to minimize or FloodOrd.doc - 10/20- 25 February 2003 eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters; ' (G) On -site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and ' (H) Any alteration, repair, reconstruction or improvements to a structure which is in compliance with the provisions of this chapter, shall meet the requirements of new construction as contained in this chapter. (I) Nonconforming buildings or uses may not be enlarged, replaced, or rebuilt unless such enlargement or reconstruction is accomplished in conformance with the provisions of this chapter. Provided, however, nothing in this chapter shall prevent the repair, reconstruction or replacement of a building or structure existing on the effective date of this chapter and located totally or partially within the floodway zone, provided 1 that the bulk of the building or structure below base flood elevation in the floodway zone is not increased and provided that such repair, reconstruction or replacement meets all of the other requirements of this chapter. ' (Ord. 1991-50, passed 8-5-9])Penalty, see § 1511..99 § 151.36 SPECIFIC STANDARDS. 1 In all areas of special flood hazard where base flood elevation data has been provided, as set forth in §§151.08 or §151.51(J), the following provisions are required: ' (A) Residential construction. New construction or substantial improvement of any residential structure (including manufactured homes) shall have the lowest floor, including basement, elevated no lower than two feet above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of flood waters shall be provided. (B) Nonresidential construction. New construction or substantial improvement of any commercial, industrial, or nonresidential structure (including manufactured homes) shall have the lowest floor, including basement, elevated no lower than two feet above the level of the base flood elevation. Structures located in A -zones may be floodproofed in lieu of elevation, provided that all areas of the structure below the required elevation are watertight, with walls substantially impermeable to the passage of water, using structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the standards of this division -are satisfied. Such certification shall be provided to the official as set forth in §151.26(E). (C) Manufactured homes. ' (1) Manufactured homes that are placed or substantially improved on sites outside a manufactured home park or subdivision; in a new manufactured home park or subdivision; in an expansion to an existing manufactured home park or subdivision; or, in an existing manufactured home park or subdivision on which a manufactured home has incurred substantial damage as the result of a flood, must be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated no lower than 1 1 FloodOrd.doc - 11/20- 25 February 2003 two feet above the base flood elevation and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. (2) Manufactured homes that are to be placed or substantially improved on sites in an existing manufactured home park or subdivision that are not subject to the provisions of this division (C) must be elevated so that the lowest floor of the manufactured home is elevated no lower than two feet above the base flood elevation, and be securely anchored to an adequately anchored foundation to resist flotation, collapse, and lateral movement. (3) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. For the purpose of this requirement, manufactured homes must be anchored to resist flotation, collapse, or lateral movement in accordance with the Regulations for Mobile Homes and Modular Housing adopted by the Commissioner of Insurance pursuant to G.S. §143-143.15. Additionally, when the elevation would be met by an elevation of the chassis at least 36 inches or less above the grade at the site, the chassis shall be supported by reinforced piers or other foundation elements of at least equivalent strength. When the elevation of the chassis is above 36 inches in height an engineering certification is required. (4) An evacuation plan must be developed for evacuation of all residents of all new, substantially improved or substantially damaged manufactured home parks or subdivisions located within flood prone areas. This plan shall be filed with and approved by the Assistant Public Utilities Director and the local Emergency Management Coordinator. (D) Recreational vehicles. A recreational vehicle is ready for highway use if it is on wheels or jacking system, is attached to the site only by quick -disconnect type utilities and security devices, and has no permanently attached additions. Recreation vehicles placed on sites shall either: (1) Be on site for fewer than 180 consecutive days; (2) Be fully licensed and ready for highway use; or (3) Meet the requirements of §§151.26, 151.35 and division (C) of this section. (E) Elevated buildings. New construction or substantial improvements of elevated buildings that include fully enclosed areas that are usable solely for the parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to preclude finished living space and be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. (1) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria: (a) Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; (b) The bottom of all openings shall be no higher than one foot above grade; and FloodOrd.doc - 12/20- 25 February 2003 11 (c) Openings may be equipped with screens, louvers, valves, or other coverings or devices provided they permit the automatic flow of floodwaters in both directions. (2) Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator). ' (3) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms, except to enclose storage areas. 1 (F) Temporary structures. Prior to the issuance of a building permit, for a temporary structure, the following requirements must be met: (1) All applicants must submit to the Assistant Public Utilities Director a plan ' for the removal of such structure(s) in the event of a hurricane or flash flood notification. The plan must include the following information: (a) The name, address and phone number of the individual responsible for the removal of the temporary structure; (b) The time frame prior to the event at which a structure will be removed; ' (c) A copy of the contract or other suitable instrument with a trucking company to insure the availability of removal equipment when needed; and (d) Designation, accompanied by documentation, of a location outside the floodplain to which the temporary structure will be moved. ' (2) The above information shall be submitted in writing to the Assistant Public Utilities Director for review and written approval. (G) Accessory structure. When accessory structures (sheds, detached garages, and the like) with a value of $3,000 or less, are to be placed in the floodplain the following criteria shall be met: ' (1) Accessory structures shall not be used for human habitation; (2) Accessory structures shall be designed to have low flood damage potential; ' (3) Accessory structures shall be firmly anchored in accordance with §151.35(A); and 1 1 1 (4) Service facilities such as electrical and heating equipment shall be elevated in accordance with §151.35(D). (H) Floodways. Located within areas of special flood hazard established in § 151.08, are areas designated as floodways. The floodway is an extremely hazardous area due to the velocity of flood waters which carry debris and potential projectiles and has erosion potential. The following provisions shall apply within such areas: (1) No encroachments, including fill, new construction, substantial improvements and other developments shall be permitted unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard FloodOrd.doc - 13120- 25 February 2003 engineering practice that the proposed encroachment would not result in any increase in the flood levels during the occurrence of the base flood. Such certification and technical data shall be prepared by a registered professional engineer and presented to the Assistant Public Utilities Director. (2) If division (1-1)(1) of this section is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of this subchapter. (3) No manufactured homes shall be permitted. Existing manufactured homes shall be permitted to remain unless the manufactured home sustains substantial damage, in which case the manufactured home shall not be repaired or replaced. An existing manufactured home shall not be replaced under any circumstances. (Ord. 1991-50, passed 8-5-91; Am. Ord. 1995-61, passed 9-11-95; Am. Ord. 2000-65, passed 8-21-00) Penalty, see § 151.99 § 151.37 STANDARDS FOR STREAMS WITHOUT ESTABLISHED BASE FLOOD ELEVATIONS AND/OR FLOODWAYS. Located within the areas of special flood hazard established in § 151.08, are small streams where no base flood data has been provided or where no floodways have been identified. The following provisions apply within such areas: (A) No encroachments, including fill, new construction, substantial improvements or new development shall be permitted within a distance of the stream bank equal to five times the width of the stream at the top of the bank or 20 feet each side from top of bank, whichever is greater, unless certification with supporting technical data by a registered professional engineer is provided demonstrating that such encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. (B) 1f division (A) of this section is satisfied and base flood elevation data is available from other sources, all new construction and substantial improvements within such areas shall comply with all applicable flood hazard ordinance provisions of this subchapter and shall be elevated or floodproofed in accordance with elevations established in accordance with § 151.51(J). When base flood elevation data is not available from a federal, state or other source, the lowest floor, including basement, shall be elevated at least two feet above the highest adjacent grade. (Ord. 1991-50, passed 8-5-91) Penalty, see § 151.99 § 1.51.38 STANDARDS FOR SUBDIVISION PROPOSALS. (A) All subdivision proposals shall be consistent with the need to minimize flood damage; (B) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; (C) All subdivision proposals shall have adequate drainage provided to reduce FloodOrd.doc - 14120- 25 February 2003 11 ' exposure to flood hazards; and (D) Base flood elevation data shall be provided for subdivision proposals and other ' proposed development which is greater than the lesser of 50 lots of five acres. (Ord. 1991-50, passed 8-5-91) Penalty —see § 15199 ADMINISTRATION AND ENFORCEMENT § 151.50 DESIGNATION OF LOCAL ADMINISTRATOR. ' The Assistant' Public Utilities Director is hereby appointed to administer and implement the provisions of this chapter. ' (Ord. l 991-50, passed 8-5-91) § 151.51 DUTIES AND RESPONSIBILITIES OF ASSISTANT PUBLIC UTILITIES DIRECTOR. Duties of the Assistant Public Utilities Director shall include, but not be limited to: (A) Review all building permits to assure that the requirements of this chapter have been satisfied; (B) Advise permittee that additional federal or state permits may be required, and if ' specific federal or state permits are known, require the copies of such permits be provided and maintained on file with the building permit. (C) Notify adjacent communities and the State Department of Crime Control and Public Safety, Division of Emergency Management, State Coordinator for the National Flood Insurance Program prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency. (D) Assure that maintenance is provided within the altered or relocated portion of said watercourse so that the flood -carrying capacity is not diminished. (E) Prevent encroachments within floodways unless the certification and flood hazard reduction provisions of §§ 151.35 through 151.38 are met. (F) Obtain actual elevation (in relation to mean sea level) of the lowest floor, (including basement) of all new or substantially improved structures, in accordance with § 151.26(E). (G) Obtain the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been floodproofed, in accordance with § ' 151.26(E). (H) When floodproofing is utilized for a particular structure, obtain certifications 1 from a registered professional engineer or architect in accordance with § 151.36(B). (1) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a ' mapped boundary and actual field conditions), make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to IF1oodOrd.doc - 15/20- 25 February 2003 appeal the interpretation as provided in this subchapter. Q) When base flood elevation data or floodway data has not been provided in accordance with § 151.08, obtain, review, and reasonably utilize any base flood elevation data and floodway data developed available from a federal, state or other source, including data developed pursuant to § 151.38(D), in order to administer the provisions of this chapter. (K) Make on -site inspections of projects in accordance with this subchapter. (L) Serve notices of violations, issue stop -work orders, revoke permits and take corrective actions in accordance with this subchapter. (M) Maintain all records pertaining to the administration of this chapter and make these records available for public inspection. (N) Annexation. Provide the State Carolina Department of Crime Control and Public Safety, Division of Emergency Management, State Coordinator for the National Flood Insurance Program with two copies of the maps delineating new corporate limits within six months from date of annexation or change in corporate boundaries. (Ord. 1991-50, passed 8-5-91) § 151.52 INSPECTIONS OF WORK IN PROGRESS. As the work pursuant to a permit progresses, the Assistant Public Utilities Director and members of the Inspections Department shall make as many inspections of the work as may be necessary to ensure that the work is being done according to the provisions of the local ordinance and the terms of the permit. In exercising this power, the Assistant Public Utilities Director and members of the Inspections Department have a right, upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction at any reasonable hour for the purposes of inspection or other enforcement action. (Ord. 1991-50, passed 8-5-91) § 151.53 STOP -WORK ORDERS. Whenever a building or part thereof is being constructed, reconstructed, altered or repaired in violation of this chapter, the Assistant Public Utilities Director and/or the Director of Inspections may order the work to be immediately stopped. The stop -work order shall be in writing and directed to the person doing the work. The stop -work order shall state the specific work to be stopped, the specific reasons for the stoppage, and the conditions under which the work may be resumed. Violation of a stop -work order constitutes a misdemeanor. (Ord. 1991-50, passed 8-5-91) § 151.54 REVOCATION OF PERMITS. The Assistant Public Utilities Director and/or the Director of Inspections may revoke and require the return of the building permit by notifying the permit holder in writing stating the reason for the revocation. Permits shall be revoked for any substantial FloodOrd.doc - 16/20- 25 February 2003 11 departure from the approved application, plans, or specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any permit mistakenly issued in violation of an applicable state or local law may also be revoked. (Ord. 1991-50, passed 8-5-91) § 151.55 PERIODIC INSPECTIONS. ' The Assistant Public Utilities Director and the members of the Inspections Department shall have a right,- upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction of the Department at any reasonable hour for the purposes of inspection or other enforcement action. (Ord. 1991-50, passed 8-5-91) ' § 151.56 VIOLATIONS TO BE CORRECTED. When the Assistant Public Utilities Director finds violations of applicable state and local laws, it shall be his duty to notify the owner or occupant of the building of the violation. The owner or occupant shall immediately remedy each of the violations of law in the property he owns. (Ord. 1991-50, passed 8-5-91) § 151.57 ACTIONS IN EVENT OF FAILURE TO TAKE CORRECTIVE ' ACTION. If the owner of a building or property shall fail to take prompt corrective action, the Assistant Public Utilities Director shall give him written notice, by certified or registered mail to his last known address or by personal service: (A) That the building or property is in violation of this chapter; ' (B) That a hearing will be held before the Local Administrator at a designated place and time, not later than ten days after the date of the notice, at which time the owner shall be entitled to be heard in person or by counsel and to present arguments and evidence pertaining to the matter; and (C) That following the hearing, the Assistant Public Utilities Director may issue such order to alter, vacate or demolish the building; or to remove fill as appears ' appropri ate. (Ord. 1991-50, passed 8-5-91) § 1.51.58 ORDER TO TAKE CORRECTIVE ACTION. If, upon a hearing held pursuant to the notice prescribed above, the Assistant Public ' Utilities Director shall find that the building or development is in violation of this chapter, he shall make an order in writing to the owner, requiring the owner to remedy ' the violation within such period, not less than 60 days, the Assistant Public Utilities Director may prescribe; provided that where the Assistant Public Utilities Director finds that there is imminent danger to life or other property, he may order the corrective action FtoodOrd.doc - 17/20- 25 February 2003 be taken in such lesser period as may be feasible. (Ord. 1991-50, passed 8-5-91) § 151.59 APPEAL. Any owner who has received an order to take corrective action may appeal from the order to the local elected governing body by giving notice of appeal in writing to the Assistant Public Utilities Director and the City Clerk within ten days following issuance of the final order. In the absence of an appeal, the order of the Assistant Public Utilities Director shall be final. The local governing body shall hear an appeal within a reasonable time and may affirm, modify and affirm, or revoke the order. (Ord. 1991-50, passed 8-5-91) § 151.60 FAILURE TO COMPLY WITH ORDER. If the owner of a building or property fails to comply with an order to take corrective action from which no appeal has been taken, or fails to comply with an order of the governing body following an appeal, he shall be guilty of a misdemeanor and shall be punished in the discretion of the court. (Ord. 1991-50, passed 8-5-91) § 151.61 VARIANCE PROCEDURES. (A) The Board of Adjustment as established by the City Council shall hear and decide requests for variances from the requirements of this chapter. (B) Any person aggrieved by the decision of the Board of Adjustment or any taxpayer may appeal such decision to the Court, as provided in G.S. 7A. (C) Variances may be issued for the repair or rehabilitation of historic structures upon the determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. (D) In passing upon such applications, the Board of Adjustment shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this chapter, and: others; (1) The danger that materials may be swept onto other lands to the injury of (2) The danger to life and property due to flooding or erosion damage; (3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (4) The importance of the services provided by the proposed facility to the community; (5) The necessity to the facility of a waterfront location, where applicable; (6) The availability of alternative locations, not subject to flooding or erosion FloodOrd.doc - 18/20- 25 February 2003 damage, for the proposed use; (7) The compatibility of the proposed use with existing and anticipated development; (8) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area; (9) The safety of access to the property in times of flood for ordinary and emergency vehicles; (10) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site; and (11) The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. (E) Upon consideration of the factors listed above and the purposes of this chapter, the Board of Adjustment may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter. (F) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (G) Conditions for variances: (1) Variances may not be issued when the variance will make the structure in violation of other federal, state or local laws, regulations or ordinances. (2) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (3) Variances shall only be issued upon a showing of good and sufficient cause; a determination that failure to grant the variance would result in exceptional hardship; and, a determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. (4) Any applicant to whom a variance is granted shaLl be given written notice specifying the difference between the base flood elevation and the elevation to which the structure is to be built and a written statement that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. Such notification shall be maintained with a record of all variance actions. (5) The Assistant Public Utilities Director shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request. (Ord. 1991-50, passed 8-5-91) FloodOrd.doc - 19120- 25 February 2003 § 151.99 PENALTY. Violation of the provisions of this chapter or failure to comply with any of its requirements, including violation of conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a misdemeanor. Any person who violates this chapter or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $50 or imprisoned for not more than 30 days, or both. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy any violation. (Ord. 1991-50, passed 8-5-91) Disclaimer: This Code of Ordinances and/or any other documents that appear on this site may not reflect the most current legislation adopted by the Municipality. American Legal Publishing Corporation provides these documents for informational purposes only. These documents should not be relied upon as the definitive authority for local legislation. Additionally, the formatting and pagination of the posted documents varies from the formatting and pagination of the official copy. The official printed copy of a Code of Ordinances should be consulted prior to any action being taken. For further information regarding the official version of any of this Code of Ordinances or other documents posted on this site, please contact the Municipality directly or contact American Legal Publishing toll -free at 800-445-5588. © 2002 American Legal Publishing Corporation techsupport@amlegal.com 1,800,445.5588. FloodOrd.doc - 20/20- 25 February 2003 11 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Nease River Basin APPENDIX C Ordianance to Implement Regulations Regarding Illegal Stormwater Discharges Related to the City of Goldsboro's Stormwater Management Program 1 C tiDooAnanu end Seingslrvaabat Wly DDcmwrUZoWsb=%jF1NAL GoWsbao SMHFIN4 Ooldsbm SMP Re doa V 1 I Goldsboro, North Carolina Code of Ordinances TITLE XV: LAND USAGE CHAPI'ER 156: ILLEGAL DISCHARGE CONTROL CHAPTER 156: ILLEGAL DISCHARGE CONTROL Section General Provisions 156.01 Short title 156.02 Statutory authorization 156.03 Findings of fact 156.04 Statement of purpose 156.05 Objectives 156.06 Definitions 156.07 Application of provisions t 56.08 Basis for establishing this legal authority 156.09 Abrogation and greater restriction 156.10 Interpretation Non-Storniwater Discharge Controls 156.25 Illicit discharges 156.26 Illicit connections 156.27 Spills Administration and Enforcement 156.50 Inspections 156.51 Civil penalties 156.52 Injunctive relief 156.53 Criminal penalties GENERAL PROVISIONS § 156.01 SHORT TITLE. This chapter shall be known as the "Illegal Discharge Control Ordinance," but may 1 IIlegalDischargeOrd.doc - 119- 25 February 2003 also be referred to as the "Illicit Discharge Ordinance." (Ord. 2001, passed 2-19-01) § 156.02 STATUTORY AUTHORIZATION. The Legislature of the state has, in Ch. T15A, Art. 02B, §.0235, entitled Neuse River Basin - Nutrient Sensitive Waters Management Strategy: Basinwide Stormwater Requirement [hereafter referred to as the Neuse Stormwater Rule], designated specific local governments for stormwater management requirements as part of the Neuse River Nutrient Waters stormwater management strategy. Therefore, the City Council does ordain as follows in this chapter. (Ord. 2001, passed 2-19-01) § 156.03 FINDINGS OF FACT. (A) Water quality has been an issue in the Neuse River Basin for over a century. Dcspite a number of initiatives between 1950 and 1995, the Neuse River Basin has continued to have water quality problems. Although environmental conditions in the Neuse River are driven by complex interactions between rainfall, flows, temperatures, biological factors, and chemistry, the long history of problems with nutrient pollution and algal blooms provides evidence that immediate control measures are necessary. (B) In August 1998, the final comprehensive Neuse River Nutrient Sensitive Waters Strategy was adopted. The goal of the strategy is to achieve a 30% nitrogen reduction from each controllable and quantifiable source of nitrogen in the basin. The city was one of the 15 largest and fastest -growing local governments in the Neuse River basin which was required to comply with the Neuse Stormwater Rule. This rule contains four program elements, one of which pertains to illegal discharges. (C) Illegal discharges are substances deposited in storm sewers (which lead directly to streams) that really should be handled as wastewater discharges. Depending on the source, illegal discharges may contain nitrogen. Local governments that must comply with the Neuse Stormwater Rule, including the city, must identify and remove illegal discharges. (Ord. 2001, passed 2-19-01) § 156.04 STATEMENT OF PURPOSE. (A) This purpose of this chapter is to: (1) Protect the public health, safety and welfare by controlling the discharge of pollutants into the stormwater conveyance system. (2) Promote activities directed toward the maintenance and improvement of surface and ground water quality. (3) Satisfy the requirements imposed upon the city under its National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MSa) discharge permit issued by the state; and I I legalDi sc hargeOrd. doc - 219- 25 February 2003 1 (4) Establish administration and enforcement procedures through which these purposes can be fulfilled. (B) The provisions of this chapter are supplemental to regulations administered by federal and state governments. (Ord. 2001, passed 2-19-01) § 156.05 OBJECTIVES. The objectives of this chapter are to: (A) Regulate the discharge of substances which may contaminate or cause pollution of stormwater, stormwater conveyances, or waters of the state; (B) Regulate connections to the stormwater conveyance system; (C) Provide for the proper handling of spills; and (D) Provide for the enforcement of same (Ord. 2001, passed 2-19-01) § 156.06 DEFINITIONS. For the purposes of this chapter, the following definitions shall apply unless the ' context clearly indicates or requires a different meaning. ILLICIT CONNECTION. Any connection which allows the unlawful discharge of ' non-stormwater to the stormwater conveyance system or waters of the state in violation of this chapter. ' ILLICIT DISCHARGE. Any unlawful disposal, placement, emptying, dumping, spillage, leakage, pumping, pouring, emission, or other discharge of any substance other than stormwater into a stormwater conveyance, the waters of the state, or upon the land in such proximity to the same, such that the substance is likely to reach a stormwater conveyance or the waters of the state. ' MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). A stormwater conveyance or unified stormwater conveyance system (including without limitation: roads with drainage systems, municipal streets, catch basins, stormwater detention facilities, curbs, gutters, ditches, natural and man-made channels, or storm drains), that: (1) Is located within the jurisdictional limits of the city; and ' (2) Is owned or operated by the state, county, the city, or other public body; and (3) Discharges to waters of the state, excluding publicly owned treatment works, and lawful connections thereto, which in turn discharge into the waters of the state. NATURAL POLLUTANT DISCHARGE ELIMINATION SYSTEM. A permitting system established pursuant to §402 of the Clean Water Act et seq. Federal law reference: National Pollutant Discharge Elimination System Perrnits, 1 33 USC § 1342 I IIlegal DischargeOrd.doc - 319- 25 February 2003 POLLUTANT. Anything which causes or contributes to pollution. Pollutants may include, but are not limited to. paints, varnishes, and solvents; oil and other automotive fluids; non -hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects, ordinances, and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; hazardous substances and wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; and noxious or offensive matter of any kind. POLLUTION.- Man-made or man -induced alteration of the chemical, physical, biological, thermal, and/or radiological integrity of water. STORMWATER. Any flow resulting from, and occurring during or following, any form of natural precipitation. STORMWATER CONVEYANCE OR STORMWATER CONVEYANCE SYSTEM. Any feature, natural or man-made, that collects and transports stormwater, including but not limited to roads with drainage systems, streets, catch basins, curbs, gutters, ditches, man-made and natural channels, pipes, culverts, and storm drains, and any other natural or man-made feature or structure designed or used for collecting or conveying stormwater. WATERS OF THE STATE. Surface waters within or flowing through the boundaries of the state including the following: any intermittent or perennial stream, river, creek, brook, swamp, Iake, sound, tidal estuary, bay, reservoir, wetland, or any other surface water or any portion thereof that is mapped as solid or dashed blue lines on United States Department of the Interior Geological Survey 7.5 minute series topographic maps. Treatment systems, consisting of man-made bodies of water, which were not originally created in waters of the state and which are not the result of impoundment of waters of the state, are not waters of the state. (Ord. 2001, passed 2-19-01) § 156.07 APPLICATION OF PROVISIONS. This chapter shall apply within the territorial jurisdiction of the city, with the following exclusions: (A) Federal, state, and local governments, including their agencies, unless intergovernmental agreements have been established giving the city enforcement authority. (Ord. 2001, passed 2-19-01) § 156.08 BASIS FOR ESTABLISHING THIS LEGAL AUTHORITY. The Neuse River Basin: Model Stormwater Program for Nitrogen Control, dated August 30, 1999, requires that local governments establish the legal authority to control illegal discharges. By March 2001, each local government is required to show that is has established the legal authority to do the following: (A) Control the contribution of pollutants to the stormwater collection system Illegal DischargeOrd.doe - 4/9- 25 February 2003 associated with industrial activity. (B) Prohibit illegal discharges to the stormwater collection system. (C) Prohibit discharge of spills and disposal of materials other than stormwater to the stormwater collection system. (D) Determine compliance and non-compliance. (E) Require compliance and undertake enforcement measures in cases of non- compliance. (Ord. 2001, passed 2-19-01) § 156.09 ABROGATION AND GREATER RESTRICTION. This chapter is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (Ord. 2001, passed 2-19-01) § 156.10 INTERPRETATION. In the interpretation and application of this chapter all provisions shall be considered as minimum requirements; liberally construed in favor of the governing body; and, deemed neither to limit not repeal any other powers granted under state statutes. ' (Ord. 2001, passed 2-19-01) NON-STORMWATER DISCHARGE CONTROLS § 156.25 ILLICIT DISCHARGES. No person shall cause or allow the discharge, emission, disposal, pouring, or pumping 1 directly or indirectly to any stormwater conveyance, the waters of the state, or upon the land in such proximity to the same (such that the substance is likely to reach a stormwater conveyance or the waters of the state), any fluid, solid, gas, or other substance, other than stormwater; provided that non-stormwater discharges associated with the following activities are allowed provided that they do not significantly impact water quality: (A) Filter backwash and draining associated with swimming pools; (B) Filter backwash and draining associated with raw water intake screening and filtering devices; 1i (C) Condensate from residential or commercial air conditioning; (D) Residential vehicle washing; (E) Flushing and hydrostatic testing water associated with utility distribution systems; 1 (F) Discharges associated with emergency removal and treatment activities, for hazardous materials, authorized by the federal, state, or local government on -scene coordinator; 1 Illegal DischargeOrd.doe - 5/9- 25 February 2003 (G) Uncontaminated ground water [including the collection or pumping of springs, wells, or rising ground water and ground water generated by well construction or other construction activities]; (H) Collected infiltrated stormwater from foundation or footing drains; (I) Collected ground water and infiltrated stormwater from basement or crawl space pumps; (J) Irrigation water; (K) Street wash water; (L) Flows from fire fighting; (M) Discharges from the pumping or draining of natural watercourses or waterbodies; (N) Flushing and cleaning of cleaning of the exteriors of buildings, including gutters, provided that the discharge does not pose an environmental or health threat; and (0) Other non-stormwater discharges for which a valid NPDES discharge permit has been approved and issued by DENR and provided that any such discharges to the municipal separate storm sewer system shall be authorized by the city. Prohibited substances include but are not limited to: oil, anti -freeze, chemicals, animal and human waste, paints, garbage, litter, and other pollutants. (Ord. 2001, passed 2-19-01) § 156.26 ILLICIT CONNECTIONS. (A) Connections to a stormwater conveyance or stormwater conveyance system which allow the discharge of non-stormwater, other than the exclusions described in § 156.25, are unlawful. Prohibited connections include, but are not limited to: floor drains, waste water discharge from washing machines or sanitary sewers, wash water discharge from commercial vehicle washing or steam cleaning, and waste water discharge from septic systems. (B) Where such connections exist in violation of §§156.25 and 156.26, that were made prior to the adoption of this provision or any other ordinance prohibiting such connections, the property owner or the person using the connection is allowed one year to remove the connection following application of this regulation; provided that, this grace period shall not apply to connections which may result in the discharge of hazardous materials or other discharges which pose an immediate threat to health and safety, or are likely to result in immediate injury and harm to real or personal property, natural resources, wildlife, or habitat. (C) (1) Where it is determined that the connection: (a) May result in the discharge of hazardous materials or may pose an immediate threat to the health and safety, or is likely to result in immediate injury and harm to real or personal property, natural resources, wildlife, or habitat, or IllegalDischargeOrd.doc - 619- 25 February 2003 11 (b) Was made in violation of any applicable regulation or ordinance, (2) The City Manager or his designee shall designate the time within which the I connection shall be removed. In setting the time limit for compliance, the city shall take into consideration: (a) The quantity and complexity of the work, (b) The consequences oi� delay, (c) The potential harm to the environment, to the public health, and to public and private property, and (d) The cost of remedying the damage. I (D) In regard to removing illicit connections, the responsible party must consider that permits are required by the Inspections Department for connections to or I modification of storm sewers located in city owned rights -of -way. The costs of such permits will be borne by the responsible party. (Ord. 2001, passed 2-19-01) § 156.27 SPILLS. (A) Spills or leaks of polluting substances discharged to, or having the potential to be indirectly transported to the stormwater conveyance system, shall be contained, controlled, collected, and removed promptly. All affected areas shall be restored to their preexisting condition. (B) Persons associated with the spill or leak shall immediately notify the City Fire Chief or his designess of all spills or leaks of polluting substances. Notification shall not ' relieve any person of any expenses related to the clean-up, restoration, loss, damage, or any other liability which may be incurred as a result of the spill or leak, nor shall such notification relieve any person from other liability which may be imposed by state or other law. (Ord. 2001, passed 2-19-01) ADMINISTRATION AND ENFORCEMENT § 156.50 INSPECTIONS. (A) The Building Inspector (or other authorized agent of the city) has full power and authority to enter upon a premise for the purpose of investigating an illegal discharge. Should the owner or occupant of any property refuse to permit such reasonable access, the Chief Building Inspector or his designee may obtain an administrative search warrant pursuant to G.S. §15-27.2 or its successor. ' (B) No person shall obstruct, hamper or interfere with any such representative while carrying out his official duties. (Ord. 2001, passed 2-19-01) II IlegalDischargeOrd.doc - 7/9- 25 February 2003 § 156.51 CIVIL PENALTIES. (A) Illicit discharges. Any person who allows or assists in a violation of this chapter shall be subject to civil penalties as follows: (1) For the first time offenders, if the discharge consists of domestic or household products in quantities considered ordinary for household purposes, the person shall be assessed a civil penalty not to exceed $100 per violation or per day for any continuing violation. If the discharge contains non -domestic substances, including but not limited to process waste water, or if the person cannot provide clear and convincing evidence of the volume and nature of the substance discharged, the person shall be assessed a civil penalty not to exceed $1,000 per violation or per day for any continuing violation. (2) For repeat offenders, the amount of the penalty shall be double the amount assessed for the previous penalty, not to exceed $10,000 per violation or per day for any continuing violation. (B) Illicit connections. Any person found with an illicit connection in violation of this chapter and any other person who assists in the establishment of an illicit connection in violation of this chapter, shall be subject to civil penalties as follows: (1) First time offenders shall be subject to a civil penalty not to exceed $500 per day of continuing violation. (2) Repeat violators shall be subject to a civil penalty not to exceed $1,000 per day of continuing violation. (C) Other violations. Any person found in violation of other provisions of this chapter, not specifically enumerated elsewhere, shall be subject to a civil penalty not to exceed $100 per violation or per day for any continuing violation. (D) Payment/collection procedures. Penalties shall be assessed by the City Manager or his designee. No penalty shall be assessed until the person alleged to be in violation is served written notice of the violation by registered mail, certified mail -return receipt requested, or personal service (such as express mail service or courier). Refusal to accept the notice shall not relieve the violator of the obligation to pay the penalty. The City Manager or his designee shall make written demand for payment upon the person in violation, if the payment is not received or equitable settlement reached within 30 days after demand for payments is made, the matter shall be referred to the City Attorney for institution of a civil action in the name of the city, in the appropriate division of the general court of justice in the county for recovering the penalty. (Ord. 2001, passed 2-19-01) § 156.52 INJUNCTIVE RELIEF. (A) The city may petition the General Court of Justice in the county seeking injunctive relief, or other relief as deemed appropriate, to require compliance with this chapter. Cost of such action shall be assessed against the individual who is failing to comply with this chapter. IIlegalDischargeOrd.doc - 819- 25 February 2003 ' (B) The institution of an action for injunctive relief under § 156.52 shall not relieve any party to such proceeding from any further civil or criminal penalty prescribed for violations of this code. (Ord. 2001, passed 2-19-01) § 156.53 CRIMINAL PENALTIES. Any person who knowingly or willfully violates any provision of this chapter, rule, regulation, order duly adopted or issued pursuant to this chapter shall be guilty of a misdemeanor, punishable by a fine not to exceed $500. Each violation shall be a separate offense. (Ord. 2001, passed 2-19-01) Disclaimer: This Code of Ordinances and/or any other documents that appear on this site may not reflect the most current legislation adopted by the Municipality. American Legal Publishing Corporation provides these documents for informational purposes only. These documents should not be relied upon as the definitive authority for local legislation. Additionally, the formatting and pagination of the posted documents varies from the formatting and pagination of the official copy. The official printed copy of a Code of Ordinances should be consulted prior to any action being taken. For further information regarding the official version of any of this Code of Ordinances or other documents posted on this site, please contact the Municipality directly or contact American Legal Publishing toll -free at 800-445.5588. © 2002 American Legal Publishing Corporation techsupport@amlegal.com 1,800.445,5588. 1 1 I I lega ID i sch argeO rd.doc - 9/9- 25 February 2003 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Nense River Basin APPENDIX D Example Letter to Likely Sources of Illegal Disharges 1 CiUow—ta —d Sett.v l mb&?." D —Wft C3o1d+6aoF NAL ° Pf;NA . Go� SMP Repo tdw Re: The City of Goldsboro's "Illegal Discharge Control Ordinance" Dear Business Owner or Operator, The City of Goldsboro has adopted an "Illegal Discharge Control Ordinance" on March 1, 2001 to satisfy requirements of the State and protect the water quality of local streams and the Neuse River. This ordinance prohibits illicit connections and/or discharges to the City's storm drain system (streets, catch basins, curbs, gutters, ditches, man-made and natural channels, pipes, culverts, etc.). You are receiving this letter because you are involved in a business that is a likely source of illicit discharges. Illicit discharges include any discharge other than stormwater to the storm drain system, except for the activities listed below (provided the dot significantly imtxrct water rtuality). (1) Filter backwash and draining associated with swimming pools; (2) Filter backwash and draining associated with raw water intake screening and filtering devices; (3) Condensate from residential or commercial air conditioning; (4) Residential vehicle washing; (5) Flushing and hydrostatic testing water associated with utility distribution systems; (6) Discharges associated with emergency removal and treatment activities, for hazardous materials, authorized by the federal, State, or local government on -scene coordinator; (7) Uncontaminated ground water [including the collection or pumping of springs, wells, or rising ground water and ground water generated by well construction or other construction activitiesl; (8) Collected infiltrated stormwater from foundation or footing drains; (9) Collected ground water and infiltrated stormwater from basement or crawl space pumps; (10) Irrigation water; (11) Street wash water; (12) Flows from fire fighting; (13) Discharges from the pumping or draining of natural watercourses or waterbodies; (14) Flushing and cleaning of stormwater conveyances with unmodified potable water; 1 (I5) Wash water from the cleaning of the exterior of buildings, including gutters, provided that the 1 discharge does not pose an environmental or health threat; and (16) Other non-stormwater discharges for which a valid NPDES discharge permit has been approved ' and issued by DENR and provided that any such discharges to the municipal separate storm sewer system shall be authorized by the City. ' Substances prohibited from introduction into the storm drain system include, but are not limited to: oil, anti -freeze, chemicals, animal and human waste, paints, garbage, litter, and other pollutants. An illicit connection is any connection which allows the unlawful discharge of non-stormwater to the stormwater conveyance or waters of the State, as specified above. Illicit connections are prohibited, and ' must be corrected by: cutting off and sealing the connection, reconnecting to the sanitary sewer (may require a permit) or other treatment facility with a permit, or applying for and receiving a discharge permit under the NPDES. A copy of the ordinance can be obtained by calling the City of Goldsboro's General Services Department (734-8674). Thank you for your assistance, Richard M. Slozak City Manager City of GoiRsbOro ' Stormwater Management Program For Nitrogen Control to The Heuse River Basin ' APPENDIX E Implementation Schedule 1 csoo wts and Sa irgs�%%a6ataUAy Doewmnle OWsb=TINAL WWsboro sMFICNAL aoWsbm snap Repuri doc Goldsboro s Stormwater Management Program for Phase II 1 Implementation Schedule 1 I Action Responsible Party Accomplish by Date Review of Planning Ordinances: Review local ordinances for restrictive land -use planning and design requirements. Planning Department Completed Revise/Prepare local ordinances to allow innovative land -use planning and design techniques 2003 Planning Department Adopt local ordinances revisions to allow innovative land -use planning and design techniques City Council 2003 BMP Inspections: �{ f i kk`} '� •:%S t 6 1 µ j(y1; � 'i!i. t� r'.. .%1i��tli �:.!'GG.:iF�61'��.5�-� Develop and Maintain a Database of all BMPs, their Engineering Department ASAP location, and status. Receive Training on how to do BMP inspections Engineering Department ASAP (March 2003) Conduct inspections of all BMPs. Engineering Department Annually for each 13MP Prepare New or Modified Ordinances: Mik Develop a Stormwater Permit for Development and Engineering Department March 2005* Redevelopment Activities (June 2003) Prepare Ordinance for a locally issued Stormwater Engineering Department March 2005* Permit for Low Density and High Density Development (October 2003) and Redevelopment Projects Prepare Ordinance enforcing Deed Restrictions and Engineering Department March 2005* Protective Covenants placed on Development and (October 2003) Redevelopment Projects by the Stormwater Permit *All Ordinances must be approved by NCDENR, =r x� `" ..� A;,4 'V approved b the CityCouncil, and in lace b this date - Prepare the Phase H Stormwater Permit p' 'rt" ' .�, W� +' ` +�-.� Reformat and Update existing Stormwater Management Engineering Department February 2003 Program Prepare and Submit Phase 11 Stormwater Permit Engineering Department March 2003 Application No Exposure Certification:��;.� �w Prepare and submit to NCDENR the No Exposure Public Utilities March 2003 Certification for the Water Reclamation Facility Department Industrial Activity Stormwater (SW) Permit,, s 3 ��. '?'� ;✓ clkkc era end seutrga WARE VW VwiW rvwnpVmM duc0t P a imp pendoc Page: I/1 1 Action Responsible Party Accomplish by Date Prepare and Submit Notice of Intent (NOI) to Discharge General Services March 2003 SW for the Maintenance Facility Department Develop Stormwater Pollution Prevention Plan (SWPPP) General Services March 2004 (within for the Maintenance Facility Department IA year of permit) Prepare and Submit NOI to Discharge SW for the Public Utilities March 2003 Biosolids Facility Department Develop SWPPP for the Biosolids Facility Public Utilities March 2004 (within Department IS` year of permit) Mapping:ISBN— x -kKiu' Collect, map, and prepare written descriptions of Engineering Department October 2002 jurisdiction -wide information. (ASAP -Feb 2003)) Identify high priority areas and chose first area (201/o) for General Services (GS) October 2002 mapping and field screening. Department (ASAP -Feb 2003) Conduct dry weather field screening of first high priority GS Department October 2003 area. Prepare detailed mapping of first high priority area. GS Department October 2003 Conduct dry weather field screening of second high GS Department October 2004 priority area. Prepare detailed mapping of second high priority area. GS Department October 2004 Conduct dry weather field screening of third high GS Department October 2005 priority area. Prepare detailed mapping of third high priority area. GS Department October 2005 Conduct dry weather field screening of fourth high GS Department October 2006 priority area. Prepare detailed mapping of fourth high priority area. GS Department October 2006 Conduct dry weather field screening of fifth high priority GS Department October 2007 area. Prepare detailed ma in of a h high priority area. GS Department October 2007 Illegal discharges:I Contact persons who are responsible for establishments GS Department March 2003 that are likel sources of illegal discharges (letter). Identify investigators for illegal discharges GS Department March 2003 Provide Multi -phased training for city personnel on GS Department March 2003 investigating and identifying illegal discharges. Training material, plus seminars and hands-on field training. Prepare map and table for the identification of illegal GS Department March 2003 discharges. Establish an illegal discharge hotline. Assistant to City Manager] March 2003 1 eNoomarta and WknpeV.�sabata" wd .xeW�W docswp v :nd d—doc Page: 1 2/2 0 Action Responsible Party Accomplish by Date Plan and conduct systematic field investigation to GS Department October 2003 and identify illegal discharge sources (first area). annually thereafter Public Education Action Plan: Implement Public Education Action Plan. Use major Assistant to City Manager Complete Annually media advertising or Category 1 and 2 activities. Prepare Annual Update and submit with Annual Report Assistant to City Manager October 2002 and annually thereafter Educate Cityof Goldsboro Officials: �;c f .';r,. 1!z�prr '*T, "rf.T3 ". 'ir.3 ,(iiT4•.RaW.L .�W& �`a"�`^i - kN P.cIY+ Brief City Officials on Stormwater Program and Phase 11 Engineering Department February 2(X)3 Permitting Impacts c:doc mLa end a mrgemwnata%" dmimwxftbg�Nph + mwnjN shed amMU nel doap%W a nw� da da Page: 3/3 City of Goldsboro Stormwater Management Program For Nitrogen Control In The Nease River Basin APPENDIX F EPA Phase II Measurable Goals 0 1 iC+� and Senlnp )wubcmlMy CWdsba SMRFlN& GokL*h SAIP nepon.doc Table 7.1 BMP's and Measurable Goals for Public Education and Outreach S Pmeasura6fe"IG&A j�,;YR ;QYA` -YiR "N MffR6*�(iiigibl� V 4N, �It- Rj;� �;Posiii(wpwfy-�,Ye-- 1 Information 95% of households Public Utilities Flyer will be sent Director information annually as part of x x x x x .the Annual Drinking Water Quality Report 2 Web Site Information on the Assistant to City Stormwater Manager Management Program will be x x x x established on the City's Web Site and reviewed annually 3 Radio Spots Information on Assistant to City citizen actions to Manager reduce pollution 2 4 4 4 and report illicit discharges will be aj red Table 7.2 BMP's and Measurable Goals for Public Participation/Involvement Vf 0 -1A -15XI, Me'--'is'-uVAbI0,GoZi�` 'A R iA I— Ri 1,�Y%W-W T % I TY ';Rv"`z"b esponsi -OSW6 I Storm Drain 20% of storm drains Assistant to City Stenciling will be stenciled Manager annually through school groups, x x x x x community groups, or other volunteer groups solicited by the city 2 Stream One stream will Assistant to City Adoption policed on an Manager annual basis by x x x x Adopt -a -Stream volunteers i Table 7.3 BMP's and Measurable Goals for Illicit Discharge Detection and Elimination 1 Measi able Goya svq YLR y Y�R YR Responsibl ; �YR YPos�hon/Pa rt. I Mapping of 50 % of MS4 outfalls General Services Storm Drain will be mapped each X X Director Outfalls year for the first two ears of the perrnit 2 Mapping of 20% of MS4 will be General Services Storm Drain mapped annually X X X X X Director System 3 Potential 95% or greater of Assistant to City Polluter retail, commercial, Manager Information industrial, and institutional entities will be sent a letter every two years X X X outlining their responsibilities for detecting and eliminating illicit connections and ille al discharges 4 Potential Restaurant Assistant to City Polluter owners/operators and Manager Education maintenance/wash facility operators will X attend one class on pollution prevention during the permitted period 5 Potential Institutional and Assistant to City Polluter industrial personnel Manager Education will attend one class X on pollution prevention during the permitted period 6 Illegal The City will Assistant to City Discharge establish and utilize a Manager Hotline Hotline for the X X X X reporting of illegal discharges. ITable 7.4 BMP's and Measurable Goals for Construction Site Runoff Control JIM' p5;W4 -M LIZ �',jj,` Y-W i�j,,,2QA Y 4_3 �,Vftvomt i. 4:,re J IF dr. ib a t 4 A I Developer Technical workshops Engineering Education for Developers (see Department item 5 in Table 7.5) Director will include information on their responsibilities x x x x x under the State Erosion and Sediment Control Program Table T5 BMP's and Measurable Goals for Post -Construction Runoff Control _7 :Y]141 'WA,"; Onsi C, A 4 AV 1 `,�, k'j: '-3 -4 �,g c I Site Plan Development Plans Engineering Reviews will be reviewed for Department compliance with the x x x x x Director SWMP 2 Local Permit The City will Engineering for implement a Department Construction program requiring Director under the Developers to SWMP obtain a Permit to Construction under the SWMP. The x x x x Local Permit will be developed during the first year of the NPDES Pen -nit period, and then used in subsequent years. 3 BMP Stormwater BMPs Engineering Inspections will inspected X X X X Department -annually Director 4 Retrofit Site Three (3) sites Engineering Selection suitable for retrofit Department will be identified Director annually by the x x x x x City. If funds are available from the State or Federal Government, the M if"AW-Goal east s % NY espofisibl' "MI. RAMRS, M, Sw WNW W. tx M_ City will implement the retrofits. 5 BMP 90% of BNIPs that Engineering Maintenance are found to be Department poorly maintained x x x Director will be brought into ,compliance within 180 daysor less 6 BMP Technical Engineering Education workshops will be Department held by the City Director annually for x x x x x Developers and their Engineering Staff/Contractor Table 7.6 BM_P's and Measurable Goals for Pollution Prevention/Good Housekeeping- V24 W iible"Fl_ RUYRf � N-YR; .,R6PofigibW 2 r_"� 1 Street 50% of streets will General Services Sweeping be swept annually x x x x x Director 2 Vehicle 95% of City General Services Washing vehicles will be Director cleaned on wash x x x x x racks which treat or recycle wash water 3 illicit 50% of City -owned General Services Connection facilities will Director Inspection inspected for illicit connections by 2005, all City - owned facilities inspected by 2007. x x When found, illicit connections will be managed so that illegal discharges do not occur 4 Illicit Illicit connections General Services Connection identified by Director Elimination inspection or other means will x x eliminated as City Budgets allow Public Education Action Plan City of Goldsboro Stormwater Management Program for Nitrogen Control in the Neuse River Basin For Submission to: NCDENR Division of Environmental Quality September 28, 2001 1 Goldsboro's Public Education Action Plan Goldsboro, in complying with the requirements of The Neuse Stormwater Rule (15A NCAC 2B .0235), has prepared this locally unique Public Education Action Plan for the City. This Action Plan outlines the proposed education activities for the upcoming year, identifies target audiences, and estimates the anticipated costs of the program. In addition, because this is the first Action Plan to be submitted to the Division of Water Quality (DWQ) for approval, components of the Action Plan which were to be addressed by the municipalities prior to submittal of the first Annual Report (due October 31) are also discussed. Goldsboro (with a population of less than 60,000) will conduct two Category 1 activities and two Category 2 activities (see Table 1 below) as part of their annual Action Plan. One of the activities is directed at educating the citizens about what types of discharges should not go to the stormwater collection system and making them aware of the illegal discharge hotline. In addition to the two Category 1 and two Category 2 activities, the City has conducted two technical workshops in the first year (one for City staff and local government officials, and one for the development community) and will be establishing a toll free hotline for reporting illegal discharges. Table 1. Public Education Action Plan Category 1 and 2 Activities Category 1 Category 2 Demonstration Sites (for BMPs) Fact Sheets "Adopt -a -Program" Environmental Freebies Quarterly local newspaper articles Fertilizer Tags Storm drain marking Flyers Recognition Program (recognize environment friendly participants) Postmarks Web page Utility bill inserts Local Cable TV program Close-out Packages (new homeowners) Toll free hotline for reporting environmental problems Speak to civic organizations quarterly Environmental field day Technical Workshop (only applicable after I" year) Environmental Contest The combination of activities selected by the City was chosen to raise awareness of nitrogen loading issues across as diverse an audience as possible (including ethnic, minority, and low-income communities; academia and educational institutions; neighborhood and community groups; children; outdoor recreation groups; and business and industry). Specifically, activities were chosen that would educate the public about water quality, nonpoint source pollution, and the effects of everyday activities on water quality and nutrient loading. Table 2 illustrates the eight major audiences being targeted by these education efforts, and the specific categories of information that will be stressed for each audience. r,Wacunemh end eadinp%wsehauVny doom ftw goldshaoleducation wiun dmtt p&k education action plan.doc Table 2. Major Target Audiences of this Action Plan and Categories of Information Being Stressed. Pollution Nutrient Illegal Special Stormwater & Sensitive Discharges/ Daily Hotline Top' Pollutants Waters Illicit Activities Technical Connections Workshops Elected Officials City Staff ✓ . ✓ ✓ ✓ Homeowners ✓ ✓ ✓ BIG' ✓ Leaders Developers/ ✓ ✓ Contractors .ORGZ ✓ ✓ General ✓ �* Public Media ✓ ✓ ✓ ✓ ✓ ✓ 1 BIG = Business, Industry, Institutions, Govemment. 2 ORG = Civic Organizations and Environmental Groups. * Information targeted to school -aged children. 2 c)docun&Ms end mwygslwsabata4nY documamn C WsboiWed Zbn aoWn pWNoNsdom's dmil p b6o odtmtm action plandoc Year One Activities As mentioned above, Goldsboro conducted two technical workshops in the first year of the Stormwater Management Program. A brief description of each workshop is presented below. City Staff Workshop: Goldsboro held a 2-hour technical workshop on February 14, 2001 for City Staff (conducted by ARCADIS G&M) to introduce them to the Goldsboro's Stormwater Management Program for Nitrogen Control in the Neuse River Basin (SMP) and to prepare them to carry out the Program. This workshop was attended by representatives from Engineering, Planning, Inspections, General Services (Garage/Maintenance, Streets/Storm Sewers, Sanitation, and Building and Traffic Maintenance), Public Works, Recreation and Parks, Community Affairs, the Fire Department, and the City Manager's Office. The workshop consisted of: + a general introduction to stormwater as well as a discussion of the need for the Neuse Stormwater Rule and who would be affected; • a presentation of the four elements of the Neuse Stormwater Rule; • the annual reporting requirements; • what is anticipated to be included in EPA's Phase Il Rule; and • a question and answer period. Development Community Workshop: Goldsboro and Wayne County teamed together to present a 4-hour technical workshop on March 1, 2001 at Wayne Community College to introduce the development community to the City's and County's SMPs and to prepare them to meet the Nitrogen Runoff and Peak Discharge requirements of the SMPs. Invitations were mailed to engineers, developers, architects, contractors, surveyors, planners, realtors, and several business entities such as Wooten Oil Co. and Lane Tree Golf Club. Although the basic components of the workshop were the same as those presented at the Goldsboro Staff Workshop, each of the four program elements were discussed in much more detail. The participants were then walked through actual calculations of nitrogen loading and peak runoff for small residential, large residential, and commercial developments, as well as examples involving the implementation of BMPs. Sample worksheets - completed independently by the participants — were then reviewed, followed by a question and answer period. Continuing Education Credits (CEC) were provided by the College. Toll Free Hotline: Goldsboro is in the process of establishing a toll free hotline for reporting illegal discharges and illicit connections. This number will be answered in person during normal business hours, and by voice rnail after hours and on weekends. Each call will be logged in, then the information will be forwarded to the appropriate field personnel for follow-up. The resolution of each call will also be documented, providing a complete record which will then be used for the preparation of the Annual Report. This hotline will be established by October 31, 2001. 3 ' c:ldwa� and a ftKOO iabaW" dwzmm�,bwolmd�%n scow, owkpldsbom's den pubk educedon action ptm.aoc Goldsboro's Proposed Education Action Plan Category I Activities: Over the past year, Goldsboro has totally redesigned their web page. It is now possible to obtain information about the Mayor, the City Council, and each of the 14 City Departments; access a catalog of City services (with phone numbers); and even browse through the Goldsboro Code of Ordinances. The Public Utilities De artment already has the following information on their web page under the Water Treatment Plant section: Fallowing are some tips for conserving water and maintaining water quality: • Dispose of hazardous chemicals properly. • Limit your use of pesticides and fertilizers. • Check your plumbing for leaks and fix them. • Take shorter showers. • Do full loads of laundry and run dishwasher only when full. • Water lawn and garden only when needed, at night. They describe Goldsboro's Grease Trap Program that is a part of its Sewer Use Ordinance, and which applies to industrial and non -domestic establishments, particularly food preparation and food serving facilities. They also discuss how residential customers can help prevent grease accumulation in (and therefore, overflows to) the sanitary sewer system. With such an excellent foundation to start from, this web site will be expanded to include more detailed information on stormwater and water quality. Specifically, a separate subheader will be added to the home page and titled along the lines of "Protecting Your Water" or "Stormwater and You." This link will directly address the impacts of public activities on water quality (such as pouring oil down the storm sewer, overwatering the lawn and flushing fertilizers into the storm sewers, and washing cars in the street) and provide links to additional sites on how everyone can help improve the water quality in the Neuse River Basin. Targeted Audience: General Public, Homeowners, and Business/ Industry/Institutional/Government Leaders. Anticipated Cost for Web Page Enhancements: $ 250 (cost for web -page developer) The second proposed Category I activity will be getting the Mayor's Youth Council involved in either storm drain stenciling or in an "Adopt -a -Stream" program. This youth group, established in 1974, implements programs and develops projects and special events that will benefit them and their community. Membership is open to all 9th —12th graders in the Wayne County School System. 4 ckloc nwft and satlingslmabald-Y loco tslgoldsbamledo imn aclion plantgoldsbom'a draft pdAl odwation action plan clot Either of these activities will fit quite nicely into the agenda of the Youth Council, which is already involved in the Keep Wayne County Beautiful program. In addition, the General Services Department will provide valuable assistance and direction to this group for either of these activities. They can provide maps of storm drains, and because they conduct annual maintenance inspections of Stoney Creek (from northern city limits to southern city limits), Reedy Creek (from northern city limits to Stoney Creek), and Richland's Creek (from eastern city limits to Stoney Creek), can also provide recommendations for stream segments which could most benefit from being incorporated into the "Adopt -a -Stream" program. Targeted Audience: General Public, specifically 9`h to 12'h grade children and young adults. Anticipated Cost for "Adopt -a -Stream" program: $ 200 (cost of "Adopt -a -Stream" signs and garbage bags) Anticipated Cost for Stream Stenciling program: $ 250 (cost of spray paint and templates) An additional Category 1 activity that Goldsboro will conduct is to enlist the support of the local ' newspaper. By catching the interest of a local reporter, quarterly local newspaper articles on stormwater and stormwater related issues can be published at no cost to the City, and the newspaper will reach portions of the general public that may otherwise be missed. ' Targeted Audience: Everyone who reads a newspaper, which should include portions of all target audiences. ' Anticipated Cost for Quarterly Newspaper Articles: $ 0 ' Category 2 Activities: Goldsboro's Public Utilities Department mails an annual Consumer Confidence Report on the Water ' Treatment Plant to all water customers. This is a perfect, cost-effective avenue in which to reach practically every resident of Goldsboro. Flyers, aimed specifically at educating the public on stormwater issues and the direct impacts of residential activities on water quality and nutrient loading, ' will be included in this annual mailing. This mailing always occurs before June 30 each year, and is usually completed during the first quarter of the calendar year. ' These same flyers will be posted or made available at locations where the public is frequently found. This includes placing the flyers next to Building Permit Applications, and posting these flyers in the library, banks, City buildings, schools, fire stations, police stations, recreation centers (3) and park ' facilities (11), and at the City -managed golf course. ' Targeted Audience: Every homeowner and business owner receiving water, sewer, or refuse services. Anticipated Cost for flyer insertion: $1,500 ' Oddw l.mid .eWrp, ,,V doma*r". ��WnwWnmoo•"pU.A� dw=Wn acWn p4m cloc 5 1 0 The second Category 2 activity which will be conducted is expanding on the City's existing ' "Curbside Recycling and Refuse Program" pamphlet. This booklet describes the City's recycling program in detail and goes on to address junked or abandoned vehicles, disposing of unwanted bulky items, and the consequences of having an overgrown lot. This pamphlet will be expanded to include information on daily activities which impact water quality (such as the importance of not dumping wastes into the storm sewers) and will advertise the illegal discharge hotline. An insert will be developed for the existing supply of pamphlets. When the next printing of pamphlets occurs, an additional page will be added. These pamphlets are provided to all new customers (residential, commercial and industrial), and given to any customer that is not complying with the recycling regulations, and are available upon request to the general public. In ' addition, the web site (the first Category I activity) will refer to this pamphlet and provide information as to how it can be obtained. Copies will also be provided to the schools. Targeted Audience: Business/ Industry/InstitutionallGovernment Leaders, General Public, and Homeowners. Anticipated Cost for expanding the "Curbside Recycling and Refuse Program": $1,000 ' dx�»erft*Iftb—\ed—tm wton pIw6goktftmadmft pLbk mk"bon wbDnpL edw 1 1 1 1 1 1 1 1 1 s ' Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality 11 /6/2002 THE CITY OF GOLDSBORO RICHARD SLOZAK, CITY MANAGER P.O. DRAWER A GOLDSBORO, NC 27533-9701 Subject: NPDES Phase 11 Stormwater Program Richard Slozak: In 1990 the U.S. Environmental Protection Agency's (EPA) Phase I Stormwater program was promulgated under the Clean Water Act. Phase I relies on National Pollutant discharge Elimination System (NPDES) permit coverage to address stormwater runoff from: (1) "medium" and "large" municipal separate storm sewer systems (MS4s) generally serving populations of 100,000 or greater, (2) construction activity disturbing 5 acres of land or greater, and (3) ten categories of industrial activity. The NPDES Stormwater Phase II Final Rule was promulgated in December 1999 and is the next step in EPA's effort to preserve, protect, and improve the Nation's water resources from polluted storm water runoff. The Phase 11 program expands the Phase I program by requiring additional operators of MS4s in urbanized areas and operators of small construction sites, through the use of NPDES permits, to implement programs and practices to control stormwater runoff. Phase It is intended to further reduce adverse impacts to water quality and aquatic habitat by instituting the use of controls on the unregulated sources of stormwater discharges that have the greatest likelihood of causing continued environmental degradation. The NPDES Stormwater Phase II Final Rule requires nationwide coverage of all operators of small MS4s that are located within the boundaries of a Bureau of the Census defined "urbanized area" based on the latest decennial Census. We are writing to you to remind you that the City of Goldsboro has been identified as being located within a census - designated urbanized area in both the 1990 and 2000 decennial census. As a regulated community, you are required to develop a stormwater management program and apply for stormwater permit coverage, if you own and operate a small MS4 or file a certification that the City of Goldsboro does not own or operate a small MS4. The deadline for submitting your application package or non -ownership certification is March 10, 2003. Application and certification documents, as well as additional information on the NPDES stormwater program, are available for download at our web site . Our web address is http:l/h2o.enr.state.nc.us/su/stormwater.him[. You may also contact us for hard copies of the documents. if you have any questions about this letter, please feel free to contact me (919-733-5083, ext.525) or Darren England (919-733-5083, ext. 545) Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater and General Permits Unit Files Washington Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699.1617 (919) 733-7015 ern NCDENR Customer Service 1-800-623-7748