Loading...
HomeMy WebLinkAboutNCC191846_ESC Approval Submitted_201909121;Governor NORTH CAROLIINA Environmental Quality AirportJohnston County ATTN-. Phillip Lanier, Airport Director 3149 Swift Creek Road Smithfield, NC 27577 RE: ProjectName: Johnston County Airport F 0 Site Development Project ID: JCS-2019-029 Acres Approved: 7.1 County: JOHNSTON,City: Smithfield Address: Swift Creek Road RiverBasin: Neuse, Stream Classification: Other Submitted By: WK Dickson Date Received by L D May 22, 2019 Plan Typed New Dear Mr. Lanier: 10 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff North Carolina Department ofEnvironmenwiQuAity � Divisbn ofEnergy, Minerai and Und Resources Ralegh Regionil Offlce ; 1628 Mali SerAce Center � 3600 Barrett Drive I Raleigh, North Carolina 27609 Letter of Approval with Modifications Johnston County Airport Authority rity June 20, 201.9 Page 2 of 3 Title 1 5 , NCAC 4 „011.5(a) and the NCC01, permit i require that the following documentation be kept mire file at the job site: 1, The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC„ once it Is received. 3. Records of inspection ion made during the previous 30 days, Also, this letter gives the notice required by Gp& 1 1 3-61..1.(a) of our right of periodic inspection ection to insure compliance with the approved plain. orula Carolina's Sedimentation tauaramn Polluauueara Control Act is perfon-na n _origin ed, requiring protection u of existing natural resources and a4joining properties.. s„ I�., following the come mencernne np of this project, the erosion and sedimentation taulearn control plan Is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113 .-, I through, CC), this office may require revisions to the plan and irnplerraemanaaulmnma of the revisions use insure compliance with the Act. Acceptance nce and approval of this plan Is conditioned upon your compliance with Federal and State water quality pears, regulations, and rules.. In addition, local e;luy or county ordinances or rules may also apply to this land -disturbing activity. "Claps approval does not supersede any other permit or approval. Please note that this approval is based in part oin the accuracy of the information provided in the Financial Responsibility onsllaulity orm , which you: provided. You are requested to file an amended form If there is any change in the Information included on the forms„ In addition, It would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a per construaction conference. Your cooperation Is appreciated. Sincerely, Sally C'aastre, EI Regional Engineering Associate DEGrpI. R Enclosures: Certificate of Approval NCG01 I-0acu Sheet M Benajairn-ninra T. Bothell, PIE (.bb—odidi wLsducic on:n�. � _Electronic Copy DEInrll.A - Raleigh Regional Office File Letter of Approval with Modifications Johnston County Airport Authority June 20, 2019 Page 3 of 3 -® Name: Johnston County Airport FBO Site Development County: JOHNSTON Project ID: J4HNS-2019-029 1. Provide two copies of the plan set issued for construction (one full-size and one half-size), prior to initiating land -disturbing activity. If changes to the plan sets are made, provide a cover letter addressing the changes, one copy of additional items (such as design calculations) and bubble, highlight, or otherwise identify the changes to your resubmittal. Reference the project name and ID on the submittal package. (G.S. I I 3A-57(4))