Loading...
HomeMy WebLinkAboutNCC191820_NOI Application_20190912Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/11/2019 8:39:07 AM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 9/11/2019 8:56:07 AM (Review- Construction NOI 15783) In The Land -Disturbing Permit # on the certificate is #081519, but Glenn Tolar Borrow Pit is also noted prominently on the Certificate near that ID number, referred to in the approval letter, and uniquely identifies the approval. The approval date entered is close to the actual approval date (8116119) and likely the date the applicant received it. All else is correct; this eNO/ will be approved as submitted. • The task was assigned to Georgoulias, Bethany by round robin distribution 9/11/2019 8:39 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 13, 2019 5:00 PM 9/11/2019 8:39 AM Submit by McCoy, Suzanne 9/12/2019 11:25:47 AM (Payment Verification for NCC191820) Brandon Foote • McCoy, Suzanne assigned the task to McCoy, Suzanne 9/12/2019 11:25 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 23, 2019 5:00 PM 9/11/2019 8:56 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Tolar Borrow Pit 2. County* Haywood 3. Highway or Street 28 canterbury lane Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* waynesville 5. State * NC 1 r-i) iTiT 7i) M fiIi f_TiI a 10141 6. Zip Code* 28786 7. Latitude * Enter the latitude in decirral degrees 35.4562 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -83.0409 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/23/2019 Estimated Construction Project Start Date 10. Date to End* 02/21 /2021 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 2.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 8.21 (acres)* 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-HAYWO-2019-Tolar Borrow Pit Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Un-named tributary to Richland Creek Wate rbody* Nacre of waterbody into which storawater runoff will discharge 15b. Waterbody 5-16-(1) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Fbrrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Glenn Tolar Name * 2. First Name* Glenn ff Corporation, enter Registered Agent First l\b e 3. Last Name * Tolar ff Corporation, enter Registered Agent Last Barre 3b. Title Owner 4. Permitee E-mail pttrs@bellsouth.net Address* 5. Permittee 281.507.48.46 Telephone No.* 6. Permittee Mailing Street Address Address* 363 Brunswick Drive Address Line 2 City Waynesville Postal / Zip Code 28786 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 363 Brunswick Drive Address Line 2 City Waynesville Fbstal / Zip Code 28786 State / Province / Region NC Country United States State / Province / Region NC Country United States C. Site Contact Information Part C. Proiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Brandon Contact - First Name * 3. Primary Site Foote Contact - Last Name * 4. Title Project manager 5. Site Contact E- brandon@tennoca.com mail Address* 6. Site Contact 828-665-8331 Telephone No.* 7. Organization Tennoca Construction Co Name 8. Site Contact Street Address Mailing Address* 1575 Smokey Park Hwy Address Line 2 City Candler Fbstal / Zip Code 28715 9. Consultant Name (optional) Daniel Hyatt First and Last narre 10. Consultant E- Dhyatt@wadetrim.com mail This person will be copied on all correspondence. 11. Consultant 8282551197 Telephone No. State / Province / P egion NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/19/2019 Approved * 2. E&SC Plan Project Glenn Tolar Borrow Pit Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Haywood County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan permit from CO.pdf Approval Mist be RCFformat letter/documentation 6. NOI Certification NCG01.pdf Form Mist be RDFformat This is an Express r No Review Project* r Yes 166.16KB 205.21 KB E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 'rw ( e�' Q ' � Type Name* Glenn M Tolar Title Owner Organization Glenn Tolar Date * 09/11 /2019 F. Tracking and COC Info NOI Tracking No. 15783 NC Reference No. NCG01-2019-1820 Uses 'count number variable (incremrented by SP) Certificate of NCC191820 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 1820 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)