Ki m,
Haupt, Mac
Friday, September 06, 2019 10:03 AM
Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B
RE: [External] RE: Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/
Johnston County (UNCLASSIFIED)
Follow up
Completed
Looked over the record drawings. I am ok with the credit release.
In the future when you guys visit this site, I would look at the vegetative viability on the north side of the stream
floodplain (stream left) at the major crossing. The folks who built the road went into the easement some so I am
wondering how much cut occurred and doubtful anyone put any topsoil back.
Thanks,
Mac
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) [mailto:Todd.J.Tugwell@usace.army.mil]
Sent: Thursday, September 5, 2019 4:22 PM
To: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B
<erin.davis@ncdenr.gov>
Subject: [External] RE: Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County (UNCLASSIFIED)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
The credits look right (match the mit plan). Looking at the "record drawing" I could only find one minor redline change.
My only comment is that the report states that planting was completed on May 6th. Their approved mit plan says
"woody vegetation planting will be conducted during dormancy", so they are also not consistent with their own plan. I
don't think this warrants holding credits back, but I would suggest something like "during our review of the baseline
monitoring report and record drawing, we noted that vegetation planting on the site was completed on May 6th. This is
outside of the normal planting window and not consistent with District guidance or the approved mitigation plan, which
states that woody vegetation planting will be conducted during dormancy. Please note that if the year 1 monitoring
report indicates any problems with vegetation performance, additional planting and/or monitoring may be required."
Thanks,
Todd
-----Original Message -----
From: Browning, Kimberly D CIV USARMY CESAW (US)
Sent: Thursday, September 05, 2019 2:57 PM
To: Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW
(US) <Todd.J.Tugwell@usace.army.mil>
Subject: RE: Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
Do you guys have any comment on this as -built before I approve the initial credit release?
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG (r)
-----Original Message -----
From: Browning, Kimberly D CIV USARMY CESAW (US)
Sent: Wednesday, August 21, 2019 3:18 PM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY
CESAW (US) <Kimberly.D.Browning@usace.army.mil>; emily_wells@fws.gov; kathryn_matthews@fws.gov; Wilson,
Travis W. <travis.wilson@ncwildlife.org>; jeff.poupart@ncdenr.gov; McLendon, C S CIV USARMY CESAW (USA)
<Scott.C.McLendon@usace.army.mil>; Wicker, Henry M Jr CIV USARMY CESAW (US)
<Henry.M.Wicker.JR@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA)
<Tyler.A.Crumbley@usace.army.mil>; renee.gledhill-earley@ncdcr.gov; Matthews, Monte K CIV USARMY CESAW (USA)
<Monte. K. Matthews@usace.army.mil>; Merritt, Katie <katie.merritt@ncdenr.gov>; Haupt, Mac
<mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>
Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Baumgartner, Tim <tim.baumgartner@ncdenr.gov>; Tim Morris
<Tim.Morris@kci.com>
Subject: Notice of_NCDMS Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County
(UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
The below referenced FINAL Baseline Report and Record Drawing (formerly known as As -Built) review has been
requested by NCDMS. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review
process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any
comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your
concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided
after the 15 -day comment deadline (shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
Name:
RFP:
RFP Issued:
Project#:
River Basin:
CU#:
County:
Stony Fork
16-006477
6/24/2015
97085
Neuse
03020201
Johnston
Mitigation Plan Assets -6,586 SMU and 480,338 riparian buffer credits
Provider: KCI Associates of NC, PA
DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov
There was no recorded change to assets.
Link to Stony Fork As -Built on SharePoint https://ncconnect.sharepoint.com/:f:/r/sites/deq_ext/dwm_irt/AsBuilt Report
Drawing/Stony Fork 97085?csf=1&e=oAC11P
15 -Day Comment Start Date: August 21, 2019 15 -Day Comment Deadline: September 5, 2019 45 -Day Credit Release
Approval Deadline: October 5, 2019
*NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the Record Drawing.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG (r)
CLASSIFICATION: UNCLASSIFIED
CLASSIFICATION: UNCLASSIFIED