Loading...
HomeMy WebLinkAbout20160372 Ver 2_USACE Initial Credit Release Approval_20190906Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, September 06, 2019 10:41 AM To: Crocker, Lindsay Cc: Baumgartner, Tim; Tim Morris; Tugwell, Todd J CIV USARMY CESAW (US); Wells, Emily N; kathryn_matthews@fws.gov; Wilson, Travis W.; Poupart, Jeff, McLendon, C S CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Matthews, Monte K CIV USARMY CESAW (USA); Merritt, Katie; Haupt, Mac; Davis, Erin B; Bowers, Todd Subject: [External] Notice of Initial Credit Release Approval / NCDMS Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County (UNCLASSIFIED) Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED Lindsay, The 15 -Day Record Drawing review for the Stony Fork Mitigation Site (SAW -2016-00875) ended September 5, 2019. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are below. There were no objections to issuing the initial credit release. Please provide me with a copy of the updated ledger. During our review of the baseline monitoring report and record drawing, we noted that vegetation planting on the site was completed on May 6th. This is outside of the normal planting window and not consistent with District guidance or the approved mitigation plan, which states that woody vegetation planting will be conducted during dormancy. Please note that if the year 1 monitoring report indicates any problems with vegetation performance, additional planting and/or monitoring may be required. Please contact the mitigation office if you have any questions. Thanks, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (US) Sent: Wednesday, August 21, 2019 3:18 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>; emily_wells@fws.gov; kathryn_matthews@fws.gov; Wilson, Travis W. <travis.wilson@ncwildlife.org>; jeff.poupart@ncdenr.gov; McLendon, C S CIV USARMY CESAW (USA) <Scott.C.McLendon@usace.army.mil>; Wicker, Henry M Jr CIV USARMY CESAW (US) <Henry.M.Wicker.JR@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; renee.gledhill-earley@ncdcr.gov; Matthews, Monte K CIV USARMY CESAW (USA) <Monte. K. Matthews@usace.army.mil>; Merritt, Katie <katie.merritt@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Baumgartner, Tim <tim.baumgartner@ncdenr.gov>; Tim Morris <Tim.Morris@kci.com> Subject: Notice of_NCDMS Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED The below referenced FINAL Baseline Report and Record Drawing (formerly known as As -Built) review has been requested by NCDMS. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided after the 15 -day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. Name: RFP: RFP Issued: Project#: River Basin: CU#: County: Stony Fork 16-006477 6/24/2015 97085 Neuse 03020201 Johnston Mitigation Plan Assets -6,586 SMU and 480,338 riparian buffer credits Provider: KCI Associates of NC, PA DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov There was no recorded change to assets. Link to Stony Fork As -Built on SharePoint https://ncconnect.sharepoint.com/:f:/r/sites/deq_ext/dwm_irt/AsBuilt Report Drawing/Stony Fork 97085?csf=1&e=oAC11P 15 -Day Comment Start Date: August 21, 2019 15 -Day Comment Deadline: September 5, 2019 45 -Day Credit Release Approval Deadline: October 5, 2019 *NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete. Mitigation Plan lengths may vary from the Record Drawing. Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED