Loading...
HomeMy WebLinkAboutNCC191357_ESC Approval Submitted (2)_20190904TOWN OF FUQUAY-VARINA 401 Old Honeycutt Road Fuquay-Varina, North Carolina 27526 fmwe Planning: (919) 552-1429 pIannjng@fuq9qY:Y9[!RLM Project Name: Meadbowbrook Phase 2 Erosion Control Only Date: 12/17/2018 Applicant: Daniel Feehan Telephone Number: 607-343-1258 Property Address: - Project Number: EC-2018-35 PIN Number: - Disturbed Acreage: 43,10 /10101/11/1011116:1,07, 21 . . .... ..... . .. .. `Raid prior to required precon meeting for major subdivisions and site plans or with building permit for minor subdivisionstsingle lot residential. TAP FEES: Amount Town installed residential taps to existing lines & nonresidential taps: Water $870,00 Quantity(EA) $0.00 Sewer $750.00 Quantity(EA) $0.00 Boring(publiG utilities quote) Quantity(EA) MOO Developer installed residential taps: MENININNUM Water $220.00 Sewer $100.00 Nonresidential and/or irrigation water meter cost (Meter cost from Meter size Cost $163.00 Meter size Cost Residential/commercial irrigation tap Irrigation $470.00 Quantity(EA) Quantity(EA) Public Utilities quote) Quantity(EA) Quantity(EA) Quantity(EA) $0.00 $0.00 NINE= $0.00 $0.00 $0.00 *Construction inspection fees are not charged for utility service lines: Private utility lines; Linear feet of water line $0,75 Quantity(LF) $0.00 Linear feet of sewer line $0.75 Quantity(LF) $0,00 Public utility line inspection: I Linear feet of water line $0.75 Quantity(LF) $0,00 Linear feet of sewer line $0.75 Quantity(LF) $0.00 Linear feet of forcemain $0.75 Quantity(LF) $0.00 Stormwater system inspection: MEN= Linear feet of storm drain $0.45 Quantity(LF) $0.00 Storm drain structures $20.00 Quantity(EA) $0.00 Stormwater control measures (Subdivision) $150.00 Quantity(EA) $0.00 Stormwater control measures (Site Plan) $200.00 Quantity(EA) $0.00 Transportation improvements, inspection: Linear feet of roadway $0,50 Quantity(LF) $0.00 Linear feet of curb & gutter -$0.25 Quantity(LF) $0.00 Linear feet of sidewalk $0.25 Quantity(LF) $0.00 Q1f'-K1Ar-'C; ECCQ- I Street signs, $155.00 Quantity(EA) $0.00 Traffic signs $90.00 Quantity(EA) $0.00 Erosion & Sediment Control Permit lmmmmmm= Approved Permit Fee Fee per disturbed acreage (or portion thereol) $250.00 Disturbed 43,10 Acreage 44 $11,000.00 Acreage I L Subtotal Inspection/Tap Fees] $11 1000-00 I SYSTEM DEVELOPMENT FEES I I *To be paid at final plat for subdivisions, preconstruction meeting for site plans or with building permit for minor subdivisions/single lot residentlal, I Water system development fee per residential unit $2.000.00 Quantity(EA) For Projects in Minus Harnett Harnett County Water District Only Difference 7OFKFee Co.� Fee $2,000�00 $1.200.00 $800.00 Quantity(EA) Sewer system development fee per residential unit $3.250�00 Quantity(EA) *Irrigation and Water Services require separate system development fees. Size Water Fee Quantity(EA) SmworF*a Quantity(EA) 3/4" $2.000.80 ---------- $3.208.00 ------ 11` $3,32&00 $5.416.00 1 1/2~ $0,055.00 --------- ------------ $10,833,00 -------- Z` $10.84S.08 -------- $17.3&1U0 �"" $21.297.00 --------- ---------- *34.665�00 ------- ------' 4^ $83.277.80 ���,i�4�OO 6° $66.554.00 *108.328.00 Other: $0.00 ------------ *Q�QO ------- FIRE SYSTEM DEVELOPMENT FEE: All uses requiring fire protection taps shall pay fees based aothe following schedule: Tap Size 4" $2,560.00 Qmunt&y(EA)_______ 6" $7.420�00 QvmntNy(EA)________ 81' $15.820.88 Quantity(EA)______^ 1011 *28.440.00 Quantity(EA)______ 12" $45.940.00 Qumniity(E4)________ ME Recreation unit fee (single family) $1,000m Quantity(EA) $0.00 Recreation acreage fee (multifamily) $25,000.00 Quantity(EA) $0.00 Subtotal System Development Fees:1 $0-00 Inspection/Tap Fee Subtotal: $11,000.00 System Development Fee Subtotal: $0.00 Total Fees: $11,000.00 Check Number: Receipt Number: Date