HomeMy WebLinkAboutNCC191564_ESC Approval Submitted_20190830ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
April 9, 2019
LETTER OF APPROVAL
Sampson County
Attn: David C. Clack, Finance Officer
406 County Complex Road
Clinton, NC 28328
RE: Project Name: Runway 24 Clearing
Acres Approved: 3.3
Project ID: SAMPS-2019-007
County: Sampson, City: Clinton
River Basin: Cape Fear
Stream Classification: Other
Submitted By: WK Dickson
Address: Airport Road
Date Received by LQS: April 12, 2019
Plan. Type: New
Dear Mr. Clack:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)
years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above named project. The NOI form may be
accessed at deq.nc.govINCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete
and correct NOI Form, a COC will be emailed to you within three business days. Initially,
DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Q
� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
zf:�,---DE Fayetteville Regional Office 1 225 Green Street. Suite 714 1 Fayetteville, North Carolina 28301
NCAFM CARMM
oep.N - ofFnWmnmawiGuanb 910A33.3300
Letter of Approval
Sampson County
April 9, 2019
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended fonn
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, El
Regional Engineering Associate
DEV LR
Enclosures: Certificate of Approval
cc: Ben Bothell, WK Dickson (electronic copy)
Myron Cashwell, Building Inspector (electronic copy)
DEMLR - Fayetteville Regional Office File