Loading...
HomeMy WebLinkAboutNCC191517_ESC Approval Submitted_20190830ROY COOPER Gm,errftw MICHAEL S. REGAN Secre£ar, S. DANIEL SMITH �nrcOM,Wrecwr NORTH CARGUNA Environmental Quality August 5, 2019 IXI I TER OFAPPROVAL City of Fayetteville PWC Joseph Glass, Engirieering Manager -Water Resources Post Office Box 1089 Fayetteville, NC 28302 RE: project Name: Rehabilitation of the Cross Creek Outfall, - Blue St to Gale St Acres Approved: 6.0 Project ID: CLJM1"lE-2020-011 County- Cumberland, City: Fayetteville Address: Ann Street --- Blue Street River Basin: Cape Fear Stream Classification: Other Submitted by: Daniel Peplinski Date Received by LQS: July 24, 2019 Plan Type: Utility DearN/Ir. Glass: 08/13/2019 W.K., Ndkson & Co.,, Inc. L This office has reviewed the subject-, erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site, This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by'ritle 15A NCAC 413.0129. As ol'April 1, 2019, all new construction activities are required to cornplete arid SUbrnit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COQ under the NCGO10000 Construction Stormwater General Permit, 1 1 his form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The N01 form may be accessed at dLe q.nc4Yov LNff,;(Yt. the NOI form to Annette Lucas at Aiinette.leicasl@ticclenr-,_,c.)v or Paul Clark at ,—_ paul.clarkff ncciear.,gov. After you submit a complete, and correct NO] F'orru, a COC will be ernailed to you withiii three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI. permit. 0 However, a $1.00 fee will soon be charged annually. `Phis fee is to be sent to the DEMLR Stormwater Central Office staff it) Raleigh. u� r uIrp, A I :r," I v . , n,uro- J,:e, w '1, it L 0I ?2'n C4 �O !Ct'T '"Jdv 0,0K Title 15A NCAC 413 .0118 (a) and the NCGO I. permit require that the following documentation be, kepL on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01. permit and the COC, once it is received. 3. Records of inspections made during the previous 1.2 months. Also, this letter gives the notice required by G.S. 113A-61.1.(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .011.8(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If', following the commencement of this project, it is determined that-, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1.973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbriu.) activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part care the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, riot to exceed the approved acres, Exceeding the acreage will be a violation of this permit and would require a revised plan and additionakipplication fee. III addition, it Would be helpful if you notify this office of the proposed starting date for this project. Please notify Lis ifyou plan to have a preconstruction conference, Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office EncIOSLIres: Certificate of'Approval cc: Daniel Peplinski, R E, W. K. Dickson & Company, Inc, Michael Bailey, Cumberland COLInty Inspections )flice — electronic copy Fayetteville Regional Office