Loading...
HomeMy WebLinkAboutNCC191665_ESC Approval Submitted_20190830ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality July 12, 2019 I��i��:Z+7��1�1:Z�I�/T i i • � _�I �[�1 t� Piedmont Natural Gas Company, Incorporated Attention: Mr. Tim Curtis, Supervisor.- Field Services 4301 Yancey Road Charlotte, North Carolina 28217 RE: Project Name: PNG — Thomas Road Extension (Express Review) Acres Approved: 1.52 Project ID: MECKL-2020-002 County: Mecklenburg City: Charlotte Address: Thomas Road River Basin: Catawba Stream Classification: Others Submitted By: Piedmont Natural Gas Company, Incorporated Date Received by LQS: July 9, 2019 Plan Type: New Dear Mr. Curtis: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A. NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The N01 form may be accessed at deq.nc.gov/N0001. Please direct questions about the N01 form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business, days. Initially, DEMLR will not charge a fee for coverage under the N0001 permit. However, on or after May 1, 2019, a $100 fee will be charged annually, This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 x.Q 704.663.1699 Letter of Approval with Moclific61,_. is Piedmont Natural Gas Company, Incorporated July 12, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The N0001 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, GG- Zahid S. Khan, CPM, Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Matt Bare, PE, SI, W. K. Dickson & Co., Inc. Inspection Department Letter of Approval with MOL ations Piedmont Natural Gas Company, Incorporated July 12, 2019 Page 3 of 3 Project Name: PNG — Thomas Road Extension Project ID: MECKL-2020-002 County: Mecklenburg Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: 1. Our Division maintains an interactive web -based map to help the public determine whether development activities are subject to the post -construction state stormwater permitting program or other stormwater permitting requirements. If your project is subject to state Phase II stormwater permitting requirements, you must have the post -construction stormwater permit prior to construction. The web -based map is located at: https://deq.nc;gov/about/divisions/energy-mineral-land-resourceslenergy-mineral-land- data/stormwater-maps-gis-resources