Loading...
HomeMy WebLinkAboutNCC191591_NOI Application_20190828Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/25/2019 11:57:21 AM (NCG01 NOI Submission) Approve by Morman, Alaina 8/26/2019 2:46:52 PM (Review- Construction NOI 15258) • The task was assigned to Morman, Alaina by round robin distribution 8/25/2019 11:57 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 28, 2019 5:00 PM 8/25/2019 11:57 AM Submit by McCoy, Suzanne 8/28/2019 3:31:54 PM (Payment Verification for NCC191591) * Dan Ryan Builders • McCoy, Suzanne assigned the task to McCoy, Suzanne 8/28/2019 3:30 PM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 9, 2019 5:00 PM 8/26/2019 2:46 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Ashberry Phase 1 C - Long Mill Road Widening 2. County* Franklin 3. Highway or Street Ashberry Lane Address * Street name only is acceptable if no address number assigned yet 4. City or Township* Franklinton 5. State * NC !17-8)aIsT2,G)M111if_T1IIa10141 6. Zip Code* 27596 7. Latitude * Enter the latitude in decimal degrees 36.0726 8. Longitude * Enter the longitude in decimal degrees (MIST be negative) -78.5058 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/26/2019 Estimated Construction Project Start Date 10. Date to End* 04/30/2020 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Development 12. Acres to be 1.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.50 (acres)* 14. Post- 0.80 construction (Estimated) impervious area (acres) * NCC Project NCC-F RANK-2019-Ash berry Phase 1C - Long Mill Road Widening Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Cedar Creek Wate rbody* l\brre of waterbody into which stornvwater runoff will discharge 15b. Waterbody 28-29-(2) Index No. * WWaterbody Index Ninber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act? * B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Dan Ryan Builders - North Carolina, LLC Name * 2. First Name* Jay ff Corporation, enter Registered Agent First l\brre 3. Last Name * Lewis ff Corporation, enter Registered Agent Last Barre 3b. Title Division President 4. Permitee E-mail jlewis@drbgroup.com Address* 5. Permittee 9192251078 Telephone No.* 6. Permittee Mailing Street Address Address* 3000 RDU Center Drive, Suite 202 Address Line 2 4588 Carlton Crossing Drive City State / Province / Region Morrisville NC Postal / Zip Code Country 27560 United States Check box if the r% Yes street address the same as mailing address 7. Permittee Street Street Address Address* 3000 RDU Center Drive, Suite 202 Address Line 2 4588 Carlton Crossing Drive City State / Province / Region Morrisville NC Postal / Zip Code Country 27560 United States C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Taylor Contact - First Name * 3. Primary Site Holt Contact - Last Name * 4. Title Land Project Manager 5. Site Contact E- tholt@drbgroup.com mail Address* 6. Site Contact 919-407-1149 Telephone No.* 7. Organization Dan Ryan Builders Name 8. Site Contact Street Address Mailing Address* 3000 RDU Center Drive, Suite 202 Address Line 2 city Morrisville Fbstal / Zip Code 27560 State / Province / Region NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/26/2019 Approved * 2. E&SC Plan Project FRANK-2019-028 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan FRANK-2019-028 LID permit for Long Mill Approval 60.2KB Widening.pdf letter/documentation Mist be RJF forrret 6. NOI Certification NOI Form Ph 1C and Long Mill Rd Signed Form 35.5KB 8.21.19.pdf Mist be RDFforrrat This is an Express f• No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature J tm Type Name * Jay Lewis Title Division President Organization Dan Ryan Builders - North Carolina, LLC Date * 08/25/2019 F. Tracking and COC Info NOI Tracking No. 15258 NC Reference No. NCG01-2019-1591 Uses 'count number variable (incremrented by SP) Certificate of NCC191591 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 1591 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)