Loading...
HomeMy WebLinkAboutNCC191605_NOI Signed Certification_20190828/ , f "", % 11 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center V I am the person responsible for the construction activities of this project, for satisfying the requirements of this pe2 The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, anei, complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for rmit, and for any civil or criminal penalties incurred due to violations of this Y ` .... and the approved Erosion and I ill abide b all conditions of it !i �� �0 iC1CJ4it Sediment Control Plan. a If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) *'' the NCGU1)Q0(.)(') Ger�era� P(grin'I'J't, I will nonetheless ensure that all conditions of permitPart 11 of the request this permit will constitute the permit requirements for the discharge(s) r is enforceable in the Name of Project: Tr- in yi5 i t Date:A�f- *IMPORT TIVOTE. This form must be signed by a responsible corporate officer that owns or operates tim- president, secretary,