HomeMy WebLinkAboutNCC191593_ESC Approval Submitted_201908277/16/2019
INDION !, I I I I
Ingersoll-Rand Company
800-B Beaty Street
Davidson, NC 28036
RE: Project Name: Ingersoll Rand Acres Approved: 5.33
Project ID: ZP-08-19
County: Moore
City: Southern Pines
Address: 1725 US Hwy 1 North
River Basin: Cape Fear Stream Classification: WS-Ill BW
Submitted By: M. Shane Sanders, SNS Engineering
Date Received by: Town of Southern Pines, 7/15/2019
Plan Type: Erosion Control
Dear Ingersoll-Rand Company,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan approval shall expire three (3) years following the date
of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at Please direct questions about the NOI form to Annette
Lucas at Angette.klcas(�,nc Lkat&nY or Paul Clark at )v PaLlI.Cia.rk(�l)tic(l(.nr.�-,ov. After you submit a
. . . ...............
complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGO I permit. However, on or
after May 1, 2019, a $ 100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .01 18(a) and the NCGOI permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO I permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Letter of Approval
Ingersoll-Rand Company
7/16/2019
Page 2 of 2
Also, this letter gives the notice required by G.S. I 13A-6 1. 1 (a) of our right of periodic inspection
to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute I I 3A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Kennedy, AICP, CZO
Assistant Town Manager
Community Development Director
Town of Southern Pines
Enclosures: Certificate of Approval
NCGOI Fact Sheet
ec: Shane Sanders, SNS Engineering
Chris Cleaveland, Sandhills Building Systems