Loading...
HomeMy WebLinkAboutwq0028587_Permit (Modification)_20060526North Carolina Department of Environment and Natural Resources ` Division of Water Quality Michael F. Easley, Governor May 26, 2006 David Hewett, Town Manager Town of Leland 102 Town Hall Drive Leland, NC 28451 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director Subject: Permit No. WQ0028587 MODIFICATION Town of Leland Brunswick Forest Sewer Wastewater Collection System Extension Brunswick County Dear Mr. Hewett: In accordance with your application received April 24, 2006, and additional information received on May 17, 2006, we are forwarding herewith Permit No. WQ0028587, dated May 26, 2006, to the Town of Leland for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0028587 Issued April 7, 2006, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. This modification includes the addition of gravity sewer and a pump station to serve Jefferson. Landing Phase 2 (aka Phase ,l Section 1-B) with no additional flow allocation. Please note that enough flow has been allocated for only an additional 20 three -bedroom homes without requesting more from Brunswick County or reducing the flow allocated to the commercial portions. By copy of this permit, the Town of Leland Building Inspections Department is hereby notified that building or occupancy permits shall only be issued for the 280 three -bedroom residences as part of the Jefferson Landing at Brunswick Forest Phases 1 & 2 (aka Phase 1 Section 1-A & 1- B) project until a modified permit is issued by the Division indicating additional connections. In addition, no certificates of occupancy are to be granted prior to the submittal of a sealed engineer's certification per Condition 6 of this permit. Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: 910-796-7215 / FAX: 910-350-2004 Internet: www.ncwaterqualitv.om NorthCarohna ;Vaturally An Equal Opportunity/Affirmative Action Employer 50% Recycled/10% Post Consumer Paper Customer Service 1-877-623-6748 Town of Leland WQ0028587 Page 2 Please note the following standard conditions that are contained in this permit. Condition 3: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Condition 9: Regarding the installation of gravity sewer at greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. Condition 12: Regarding Division notification should the system fail'to operate including the loss of wastewater from the collection system. In addition, note Permit Condition 13 regarding the posting of pump stations with emergency contact information. Permitting of this project does not constitute an acceptance of any part of .the project that does not meet 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the, certification provided by the North Carolina -licensed Professional Engineer named in the application. It shall be the Permittee's responsibility to ensure that the as - constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North' Carolina General Statute § 143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Leland for the construction and operation of approximately 5,926 linear feet of 8-inch gravity sewer; a 380-gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and on -site generator with automatic transfer switch; as well as approximately 2,821 linear feet of 6-inch force main to serve 149 three -bedroom residences as part of the Jefferson Landing at Brunswick Forest Phase 2 (aka Phase 1 Section 1-B) project, and the discharge of 53,640 gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application received April 24, 2006 and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February,12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. Town of Leland WQ0028587 Page, 3 /_1►1U: The continued construction and operation of the sewer infrastructure as described below and previously permitted In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,' 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit: April 7, 2006 Modification Construction and operation of approximately 100 linear feet of 8-inch, 793 linear feet of 10- inch, and 3,830 linear feet of 12-inch gravity sewer to serve as a gravity sewer outfall or interceptor line for future upstream or tributary sewer systems as part of the Brunswick Forest Phase 3 project with no additional discharge of collected domestic wastewater into the Town of Leland's existing.sewerage system, pursuant to the application received February 16, 2006 March 10, 2006 Modification Construction and operation of approximately 6,741 linear feet of 8-inch gravity sewer to_ serve 131 three -bedroom residences as part of the Jefferson Landing at Brunswick Forest (Phase 1) project with no additional discharge of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application received February 14, 2006. July 21, 2005 Modification Construction and operation of approximately 25 linear feet of 8-inch and 3,290 linear feet of 12-inch gravity sewer to serve as a gravity sewer outfall or interceptor line for future development upstream of the previously approved sewer listed below as part of the Brunswick Forest Phase 2 project, and with no additional discharge of collected wastewater into the Town of Leland's existing sewerage system, pursuant to the application received June 15, 2005. March 24, 2005 Original Permit Construction and operation of approximately 868 linear feet of 8-inch, 3,414 linear feet of 10- inch, and 3,141 linear feet of 12-inch gravity sewer; a 1500-gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry/auto dialer, and on -site generator with automatic transfer switch; as well as approximately 20,650 linear feet of 10-inch force main to serve 300 three -bedroom homes (108,000 gpd), a 100,000 ft2 shopping center with a grocery store (12,000 gpd), a two-story restaurant with 10,000 ft2 of dining area (26,700 gpd), and a 30,000 ft2 office building (3,000 gpd) as part of the Brunswick Forest Phase 1 project, and the total discharge of 149,700 gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application received March 11, 2005. Town of Leland WQ0028587 Page 4 The sewage and wastewater collected by this system shall be treated in the Northeast Brunswick Regional Wastewater Treatment Facility (Permit No. NC0086819) prior to being discharged into the receiving stream. This permit shall become voidable unless the agreement between the Town of Leland and Brunswick County for the collection and final treatment of wastewater is in full force and effect. A stormwater management plan shall be submitted to and approved by the Wilmington Regional Office in accordance with 15A NCAC 2H .1000. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of -this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dean Hunkele at (910) 796-7215. Sincere y, e_"_ (:�� for Alan W. Klimek, P.E. Cc: Jeff Malpass, Malpass Engineering Tim Evans, Town of Leland Building Inspections Department Jerry Pierce, Brunswick Qounty Public Utilities - . Cent ral"Files, Su_r —ace Water ProtecfFon Section Marie Doklovic; Pretreatment, Emergency Response and Collection Systems Unit Files d NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shad be developed and shall be actively maintained. - c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1 C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2H..0220, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents (as -built or recording drawings and pump station designs, if applicable) to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are -provided as applicable. 7. A copy of the construction record drawings and pump station designs, if applicable, shall be maintained on file by the Permittee for the life 'of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through § 143-215.6C. 9. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a, permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCGO10000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 2 12. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality staff member at the Wilmington Regional Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858- 0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS- SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 13. Each pump station including simplex stations shall be clearly and conspicuously posted with the telephone number and name of the owner/operator of the sewer system and instructions to call the number in the event of alarm activation. 14. The Permittee shall provide for the pump station and force main the following items: a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in the pump station,, b. An air relief valve located at all high points along the force main, C. A screened vent for the wetwell, d. Fillets located in the wetwell at the intersection of the flooring and sidewalls, e. Three feet of cover (minimum) over the force main or the use of ferrous material where three feet cannot be maintained, f. Sufficient devices which will protect the pump station from vandals, and g. Flood protection if the pump station is located below the 100-year flood elevation. Permit issued this day: May 26, 2006 NORTH C. ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0028587 3 Fast Track Engineering Certification ' PERMIT NO. WQ002'8587 Jefferson Landing at Brunswick Forest Phase 2 (aka Phase 1 Section 1-B) Sewer May 26, 2006 Brunswick County CERTIFICATION: This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation. Consequently, the PERMITTEE should submit this certification in a manner that documents proof -of -receipt by the Division. Complete and submit this unmodified form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Record drawings are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, and other utilities including water lines, stormwater systems, etc. • One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or -storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project that do not result in non-compliance with this permit, regulations, or the minimum design criteria should be clearly identified on the record drawings, on this certification in the space provided, or in written summary form. PRIOR TO CERTIFICATION (FINAL OR PARTIAL): Permit modifications are required for any changes resulting in non- compliance with this permit (including total pipe length increase of 10% or greater, increased flow, or increases in the number/type of connections), regulations, or the minimum design criteria. Requested modifications or variances to the minimum design criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the minimum design criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. ENGINEER'S CERTIFICATION ❑ Final ❑ Partial Comments: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the Permittee hereby state that, to,the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date ................................................... SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS REGIONAL SUPERVISOR SURFACE WATER PROTECTION SECTION DIVISION OF WATER QUALITY WILMINGTON REGIONAL OFFICE 127 CARDINAL DRIVE EXTENSION WILMINGTON, NC 28405-3845 ........... ................... The PERMITTEE is responsible for tracking all partial certifications up until a final certification is received. A final certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. ,� FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Application Number: I O Q C (to be completed by DWQ) V n 95n ft 1. 1a. Owner: _ c I- j Town Of �•eIRii4 Full Legal Name (company, municipality, HOA, utility, etc.) Ta 1 b. vi. New Town Mamaer z 0 Signing Official Name and Title (Please rdyview 15A NCAC 2H .0206(b) for authorized siLningA1L?FiRa0)4 LF- 1 c. The legal entity who will own this system is: ❑ Individ-ut�al ❑ F�e(,deralj�[V,.j Municipality ❑ State/County❑ Private PartnIership ❑ Cor i 1d. 1O2 IOWR I 1 D , 1e. Le{l{j 0 Street Address City 1f. NOt�"h �QI'0 {11Q 1g. 2$�Sz ® 1h. State Zip Code 410 —371— 6148 1i. 110 7'371-1073 1j. ���We-��tawn�leland,com I-- Telephone Facsimile E-mail 2. Project (Facility) Information: J 2a. 1rghswick'6resj- 2b. $runswJ.Ck a Brief Project Name (permit will refer to this name) County Where Project is Located Q 3. Contact Person: f _ Q 3a. I Name and Affiliation o Someone Who Can Answer Questions About this Application ; 3b. $0-392-5213 3c. 1e4rn41pv5(9t4ec.,Pr, colt► ! 1. Phone Number -mail 'r, ^_ _ _ -� p )_. i W.�l�-_ Project is igNew (Modification of an existingpermit) If Modification, Permit No.: 2. Owner is Public (skip to Item 8 3 ❑ Private go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction 111) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) El Homeowner Assoc./Developer (Instruction IV) ❑ Selling units (lloCts, townhomes, etc. - go to Item B(2b)) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project _ - 4a. Not tL-4 Bruns w�Gk Reaioha� WUV7' F 4b NC 00 86 B l9 W Name of WWTF WTF Permit No. O 5a. Tnllth '5b. 5c. LL Owner of Downstream Sewer Receiving Sewer Size ; Permit Number of Downstream Sewer (if known), Z-- _ 6 - - _ - -- - - The origin of this wastewater is (check all that apply): W Residential Subdivision ❑ Car Wash ❑ Apartments/Condominiums ❑ Institution /Lgo % Domestic/Commercial IJJ ❑ Mobile Home Park ❑ Hospital i ❑ School ❑ Church %Industrial m ❑ Restaurant ❑ Nursing Home % Other (specify): ❑ Office ❑ Other (specify): 7. Volume of wastewater to be permitted in this project.53 �{O gallons per day --J — --V - -, 8. If the permitted flow is zero, indicate why: N/A ❑ Interceptor Line - Flow will be permitted is subsequent permits that connect to this line i I ❑ Flow has already been allocated in Permit No. _ ❑ Rehabilitation or replacement of existing sewer with no new flow expected IrAST-TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 w _Z P Z O O fY LL Z F- ry w fL ul i 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(I) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(I)(3). Izo �p m_ 53� 6 `f0 GPD i 10. Summary of Sewer Lines to be Permitted (attach additional sheets,if necessary) Length feet Gravity or Force Main Size (inches) Len g (feet) (use the pull down menu) 5192 C��� - 2� 921 ' ' APR 2 4 Z00b ENTER TOTAL LINE LENGTH IN MILES 1 , ;6 a1�ICs ham; JI 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID Power Reliability Option ' (self chosen -as shown on 'Design Flow Operational Point (1- dual line feed; 2- permanent generator w/ATS; 3- ' plans for cross-reference) (MGD) GPM @ TDH portable generator w/telemetry; 4-wet well storage) 0.17 380 @ G% -� I - I 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force; Mains (latest version), the Gravity Sewer Minimum Design, Criteria (latest version) and 15A NCAC 2H .0200 as applicable? R [6 Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: I SUBMIT TWO COPIES OF PLANS, SPECIFICAT16NS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION! 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings -General Permit or 401 Certification? ❑ Yes ❑ No [/N/A Sedimentation and Erosion Control Plan? Yes ❑ No ❑ N/A i Stormwater? 0 Yes ICJ No ❑ N/A J1 t Wfil P_ I 'FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 w rn i` W 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as! necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: ; ❑ A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, ❑ A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. i 1 Location iD on Map (self chosen - as shown on Name of Waterbody Stream Waterbody i map for cross-reference) Waterbody County River Basin Index Classification j dory Creek BNOSiN;ck Cape Fear 18-78 S W . _. �CF17Z0U'b D • APR 2 f Submit the 8.5" x 11" topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification:------_--_^-_^-�_��� David W. Aewe �r�lnsv+��k � t those l -Sev en I B i 1 attest that this application for 1 has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and;attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina Gel�ral Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, on once cation in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 asll w 11 as civil penalties up to $25, 000 per violation. la. Sig ng official Signature Professional Engineer's Certification: Date 1 attest that this application for 8NI1iV1,ck FDf bt V4ASe I-sedion ( B has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation'to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February J 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June l 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement,! representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to i exceed$10,000 as well as civil penalties up to $25,000 per violation. I�+ - - - - -• �neflWiafr! I 2a. J Professional Endineer Name 2b. 2c. Hoaress 2d. WilJA1Ift �1A 2e. City 2g.410-391-51y3 2h. 0-3g1-5163 2i. Telephone Facsimile !l,A �� St�f }L� •, 1. �.�1� U o , o State Zip ie>,nlW� bizecrrr, cony 1 -mail al„ gnature Date \ \\ a ass -_ _ �- I �/J 1 1�� � �p / � �ail�-� ��31tA29�� �� j •I�• .� 17 Radio 11524 -_r. .\ �1 ; it 1 : �•� ' Tower26 28 I v zxc ^` , R -, I�^j—� f 4• f..- .'�.Sandpltg-�:> ,' �� del '1I ✓1 C - :—_ 12'30 3789 am 38 37 /117 37 f i _ �_.__._ 'V \� � \� �, I � \ \�., ?2 Q %� it %��� �,• ,'r �� _ _ \ � U \ �_—` ,,-•� �\ `.,,,,',rW fir_-,, r;. - Walter B. Futch Jr. Town-ofLeland Mayor ; Brenda Bozeman Town Hall Drive Mayor Pro Tern Leland, North Carolina 28451 Leland, R. Gordon Hobbs Councilman Telephone (910) 3 71-0148 James Medlin Councilman Fax (910) 371-1073 Thomas L. Wallace U Councilman 20 April 06 Mr JeffMalpass c/o Malpass Engineering, P.C. 1134 Shipyard Blvd Wilmington, NC 28412 Subject: Sewer Flow Acceptance — 53,640 gallons per day Brunswick Forest; Jefferson Landing Phase 1 Section I Northeast Brunswick County Wastewater Treatment Plant Permit # NCO086819 Dear Sir; David W Hewett Town Manager Carol Ann Floyd Town Clerk You are hereby notified that the Town of Leland acknowledges your request for sewer flow acceptance from the project `Brunswick Forest — Jefferson Landing Phase 1 Section 113" in the amount of 53,640 gallons per day. The flow shall be transferred for -treatment at the Brunswick County Wastewater Treatment Plant. This letter hereby serves as approval of the above -described request to be used for plan submittal to the NC Department of Environment and Natural Resources for review and approval. Please call if you have any questions. Sincerely, IL David W. Hewett Town Manager CC: Jerry fierce - Brunsco RE: Brunswick Forest Phase F Section 1-B (aka Jefferson Landing P... Subject: RE: "Brunswick Forest Phase 1.Section 1-B (aka Jefferson Landing Phase 2) From: "Jeff Malpass" <jeffmalpass@bizec.rr.com> Date: Wed, 17 May 2006 07:33:52 70400 To:" "'Dean Hiinkele"' <Dean.Hunkele@ncmail.net> Thecflow is apart of the 300 gpd that is correct we are up to 280 gpd. Thanks, Jeff -----Original Message ----- From: Dean Hunkele[mailto:Dean.Hunkelegncmail.net] Sent: Tuesday, May 16, 2006 2:58 PM To:,Jeff Malpass (Malpass Eng)' Subject: Brunswick Forest -Phase 1 Section 1-B•(aka Jefferson Landing Phase 2) .Jeff, Should I be assigning any new flow to this permit for the 149 lots or is it part of the original 300 lots we permitted and gave flow allocation? If part of the 300, then we would be at 280 of that. Hope to get it issued ,this week. Please advise ASAP. By the way, I tried to call your cell and it wouldn't let me leave a message. Dean Hunkele Environmental"Specialist Wilmington Regional Office Division of Water Quality Surface Water Protection Section Direct Phone: Main Phone: Fax: Address: (910) 796-7403 (910) 796-7215 (910) 350-2004 127 Cardinal Drive Ext Wilmington, NC 28$05-3845 1 of 1 5/22/2006 9:58 AM