Loading...
HomeMy WebLinkAboutNCC191473_ESC Approval Submitted_20190821ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality August 9, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Todd Brown PO Box 1349 Thomasville, NC 27360 RE: Project Name: East Coast Oxygen & Hydro Acres Approved: 1.4 Project ID: RANDO-2020-001 County: Randolph City: Thomasville Address: Turnpike Ct River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Todd Brown Date Received by LQS: July 11, 2019 Plan Type: Commercial - New Dear Todd Brown, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasOncdenr.gov or Paul Clark at Paul. clarkOncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D North Carolina Department of Environmental Quality I division of Energy, Mineral and Land Resources E Q�� 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORn+cnAawn � oenamemm���viuu.i� /"� 919.707.9200 Letter of Approval with Modifications Todd Brown August 9, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval Certificate of Approval NPDES NCG01 Fact Sheet cc: Summey Engineering Associates, PLLC ATTN: Christian Vestal PO Box 968 Asheboro, NC 27204 Regional Office file Letter of Approval with Modifications Todd Brown August 9, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: East Coast Oxygen & Hydro Project ID: RANDO-2020-001 County: Randolph 1. The plan is approved with the modifications shown in the digital copy emailed on 8/9/2019 2:52 PM. Please provide 2 physical copies of this final version to the Winston-Salem Regional Office within 2 weeks or prior to commencement of construction activity, whichever comes first. 2. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities