HomeMy WebLinkAboutNCC191428_ESC Approval Submitted_20190821ROY COOPER
Governor
MICHAEL S. REGAN
secretary
S. DANIEL SMITH
Director
Caviness Land Development, Inc.
ATTN: Watson G. Caviness, President
639 Executive Place, Suite 400
Fayetteville, NC 28305
NORTH CAROLINA
Environmental Quality
August 14, 2019
LETTER OF APPROVAL
RE: Project Name: Parkway Meadows Phase One - Lot 21
Acres Approved: 0.32
Project ID: MOORE-2020-006
County: Moore
City: Sandhills Township
Address: Vanderbuilt Court
River Basin: Lumber
Stream Classification: Other
Submitted By: Larry King & Associates, RLS, PA
Date Received by LQS: July 26, 2019
Plan Type: New - Residential
Dear Mr. Caviness:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan shall expire three (3) years following the date of approval, if no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General
Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. the NOI form to Annette Lucas at
Annette lucasPncdenr.gov or Paul Clark at PauLcIark@ncdenr gov. After you submit a complete and correct NOI
Form, a COC will be entailed to you within three business days. A $100 fee will be charged annually until a Notice
of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
relW ��
wvu���aanw�.�.w wab\
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1225 Green Street, Suite 714 I Fayetteville, North Carolina 28301
910.433.3300
Letter of Approval
Caviness Land Development Inc.
August 14, 2019
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also,
this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as called for on the application plan,
not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
04
r
Timothy L. LaBou PE
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Larry King & Associates, RLS, PA (via email)
Deborah Ensminger, Moore County (via email)
Fayetteville Regional Office - DEMLR file