Loading...
HomeMy WebLinkAboutSW3190804_Signed_Pine Forest II_Supplemental EZ forms_08.10.19_8/20/2019SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Infiltration System Bioretention Cell Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting_ Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Quantity _ _ _ Location(s) _ _ _ __------._..--- 2 BMP 100 (35.737303,-80.868514) - BMP 200 (35.736919,-80.866229) Designer information for this project: is and Title: Patrick Murphy - Department Manager anization: R Joe Hams and Associates et address: 127 Ben Casey Dr. Ste. 101 State, Zip: Fort Mill, SC 29708 ne number(s): (803) 803-1799 iil: Ipmurphy@rjoeharris.com Designer Applicant: Project Name: Pine Forest II Address Amity Hill Road City / Town Statesville, INC fm Cnvlronmv. aor, Company: JCNG II, LLC Contact: Michael Johnson Mailing Address: 323 Walnut Street City, State, Zip: Statesville, INC 2677 Phone number(s): (704) 996-5978 Email: michaeljohnson@earthlink.net Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 1:00 PM 8/10/2019 SAND FILTER THE DRAINAGE AREA Drainage area number 100 Total coastal wetlands area (sq ft) Total surface water area (sq ft) Total drainage area (sq ft) 425191 at BUA associated with existing development (sq ft) Proposed new BUA (sq ft) 211134 sf Percent BUA of drainage area 50% COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwaler program(s) that apply (please specify): Phase II MSI or UA Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located on or near contaminated soils? What are the side slopes of the SCM (H V)? Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets and receiving stream protected from erosion (10-year storm)? Is there a a bypass for flows in excess of the design flow? What is the method for dewatering the SCM for maintenance? 4 SHWT elevation(frri '1 Type of sand filter (open or closed) 1 If closed, describe if the filter will be pre -cast or pour -in -place: #1I - #1 f closed, lop of grate elevation (fmsl) #2 Volume that can be retained In the sediment chamber (cubic feet) #2 Will there be a permanent pool in the sediment chamber? #2 Bottom of the sediment chamber (fmsl) ##22 Area of the sediment chamber (square feet) l#2 Physical depth of the sediment chamber (inches) #2 Ponding depth in the sediment chamber, above any permanent pool (inches #PElevafion of top of weir between chambers (fmsh #2 Volume that can be retained in the sand chamber (cubic feet) Bottom of the sand chamber (fmsl) LArea of the sand chamber (square feet) 1. #2 Physical depth of the sand chamber (inches) #2 Pending depth in the sand chamber, above any permanent pool (inches) ADDITIONAL INFORMATION Break down of BUA in the drainage area (both new and existing) - Parking / driveway (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway I ft) - Other, please specify in the comment box below (sq ft) Total BUA (sq ft) Design rainfall depth (in) Minimum volume required (cu ft) Design volume of SCM (on fill Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #8 Does the mainetenance access comply with General MDC (8)? 3:1 #9 Does the drainage easement comply with General MDC (9)9 No L the SCM is on a singlefamily lot, does the plat comply with General MDC (10)? Yes thereanO&M Agreement that complies with General MDC (11)? Yes thereanO&M Plan that complies with General MDC (12)? Drawdown Orificeas the SCM designed by an NC licensed professional? 784 ft 4704 of No 790.0 ft 3307 sf 36 in 793 ft 2437 cf Volume of stormwater from drainage area during design storm (cubic feet) Total volume that can be stored above the sediment and sand chambers (cubic feet) Is this sand filter designed to attenuate peak flows? Elevation of the bypass device (fmsl) Describe the bypass device: er Structure and Weir _Fording depth from the top of the sand to the bypass device (ft) _Describe the mechanism for distributing flow over the sand surface: irepay Spillway Sand specification for sand chamber yen Sand Pine Forest II 1 22753 sf 11395 sf 117308 at 59678 sf 211134 sf 1.0 in - - - 17606 of 17619 of Yes Yes Yes Yes Yes Yes 17619 of 96239 cf Yes 796 ft Eft 789 ft #7 Depth above underdrain pipe (inches) 4E Ill.in 1625 sf #8 Will the media be maintained to drain at least two inches per hour at the sand surface? Ys 18 in #9 Is at least one clean out pipe provided at the low point of each underdrain line? Yes 18 in #9 Will clean -out pipes be capped? Yes Please use this space to provide any additional information about this sand filter that you think is relevant to the review_ Sand Filter 1 1:00 PM 8/10/2019 SAND FILTER Sand Filter 2 1:00 PM 8/10/2019 SAND FILTER Pine Forest II THE DRAINAGE AREA age area number 200 coastal wetlands area (so it) surface water area (sq ft) drainage area (sq ft) 360327 sf associated with existing development (sq ft) rsed new BUA (so ft) 136208 sf ;nt BUA of drainage area 37.8 PLIANCE WITH THE APPLICABLE STORMWATER PROGRAM (water program(s) that apply (please specify I. e II MSI or UA Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located on or near contaminated soils? What are the side slopes of the SCM (H:V)7 (Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Is there a a bypass for flows in excess of the design flow? What is the method for dewalering the SCM for maintenance? Yes No 31 No Yes Yes Drawdown Orifice SHWT elevation (fmsl) 784 ft Type of sand filter (open or closed) Open If closed, describe if the filter will be pre -cast or pour -in -place: _... _. If closed, top of grate elevation (fmsl) Volume that can be retained in the sediment chamber (cubic fey Will there be a permanent pool in the sediment chamber? Bottom of the sediment chamber (fmsl) Area of the sediment chamber (square feel) Physical depth of the sediment chamber (inches) Pending depth in the sediment chamber, above any permanent Elevation of top of weir between chambers (fir l) Volume that can be retained in the sand chamber (cubic feet) _. Bottom of the sand chamber (fmsl) 4278 cf No 788 ft 2137 at 36 in 791 ft 1575 cf 786.5 ft Break down of BUA in the drainage area (both new and existing): - Parking / driveway (so ft) - Sidewalk (so ft) 13325 at 7574 at - Roof (so ft) 67604 sf - Roadway (so ft) 47705 at - Other, please specify in the comment box below (so ft) Total BUA (sq ft) 136208 s Design rainfall depth (in) 1.0 in Minimum volume required (cu fl) 11716 cf Design volume of SCM (cu ft) - - - - - 11797 cf 97 If applicable, with the SCM be cleaned out after construction? Yes #8 Does the mainetenance access comply with General MDC (8)? Yes 49 Does the drainage easement comply with General MDC (9)? Yes #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? # 11 Is there an O&M Agreement that complies with General MDC (11)? Yes 912 Is there an O&M Plan that complies with General MDC (12)? Yes #13 Was the SCM designed by an NC licensed professionalV Yes #3 Volume of stormwater from drainage area during design storm (cubic feet) 11716 cf #3 Total volume that can be stored above the sediment and sand chambers (cubic feet) 11797 of #3 Is this sand filter designed to attenuate peak flows? Yes #3 Elevation of the bypass device (fmsl) 794 ft #3 Describe the bypass device Riser Structure and Weir Describe the mechanism for distribut ebay Spillway Sand specification for sand chamber an Sand #7 Depth above underdrain pipe (inches) flow over the sand surface: Eft #2 Area of the sand chamber (square feel) 1575 sf #8 Will the media be maintained to dram at least two inches per hour at the sand surface? Yes - #2 Physical depth of the sand chamber (inches) 18 in #9 Is at least one clean out pipe provided at the low point of each underdrain line? Yes #2 Pending depth in the sand chamber, above any permanent pool (inches) - 11 in #9 Will clean -out pipes be capped? Yes ADDITIONAL INFORMATION _ Please use this space to provide any additional information about this sand filter that you think is relevant to the review: 2 Sand Filter 3 1:00 PM 8/10/2019