Loading...
HomeMy WebLinkAboutNCC191195_ESC Approval Submitted_20190816Gaston County Soil Erosion and Sedimentation Control Program VRAZ n TM$t� www.gastongov.com /departments /Natural -Resources CONTACT: Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Telephone: 704-922-4181 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenville Mount Holly Ranlo Spencer Mountain Stanley Mission Statement 'To provide leadership and conservation assistance to the people of Gaston County to improve and sustain their soil, water, air, plant and wildlife resources." GASTON COUNTY Gaston Natural Resources Department Soil Erosion & Sedimentation Control RE: Letter Of Approval With Performance Reservations Date: 07/12/2019 Project Name Lithium Hydroxide Expansion Project Permit #: 3492 Responsible Person FMC Lithium USA Corp. Address Po sox 795 City, State, Zip Bessemer City NC 28016 Location HWY 161 Submitted By Parsons Date Received: 06/17/2019 0 New Submittal Revision Watershed LCrowders Creek Disturbed Acreage: 5.50 atln; Larry S ickard The Erosion and Sedimentation Control Plan submitted for the above project has been reviewed and is approved with performance reservations as listed on the next page. This approval is conditioned upon the knowledge that these Best Management Practices may fail to meet the soil erosion and sedimentation control as required. If these planned Best Management Practices fail, the site will be in violation of the Gaston County Sail Erosion and Sedimentation Control Ordinance (Section 18(k) and the Sedimentation Pollution Control Act of 1973. (G.S. 113A-61.1(c))). Please be advised that the Ordinance (Section 18 (c) and Title 15 NCAC 04B.0127(b) requires that a copy of the approved Soil Erosion & Sedimentatioin Control Plan be on file at the job site. This letter is also Notice required by the Ordinance (Section 21) and G.S. 113A-61.1 of our right of periodic inspection to insure compliance with the aooroved clan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COO) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NO[ form and additional information regarding this permitting process may be accessed at deg.nc.gov/NCGO1. Enclosed is your Certificate of Approved Plan that must be posted on the primary entrance of the job site before construction begins and until establishment of permanent groundcover. After commencement of this project, if it is determined that the Soil Erosion & Sedimentation Control Plan is inadequate to meet the requirements of the Ordinance (Section 18 (c)(f) and G.S. 113A-51 through 66), this office may require revisions to the Plan and implementation of the revisions to insure compliance. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there are any changes in the information included on the form. Please notify our office (704-922-4181) at least 48 hours before commencement of the land -disturbing activity (0rdinanc Section $ (e . Sincerely, GASTON NTY NATURA ESOUR DEPARTMENT Jonathan Boerger: Conservationist jonathan.hoerger@gastongov.com Gaston County Erosion & Sedimentation Control Program Page 1 of 2 Gaston County Soil Erosion and Sedimentation Control Program $S+R13RA4 dd ARTM' www.gastongov.com !departments !Natural -Resources CONTACT: Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Telephone. 704-922-4181 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenville Mount Holly Ranlo Spencer Mountain Stanley Mission Statement "To provide leadership and conservation assistance to the people of Gaston County to Improve and sustain their soil, water, air, plant and wildlife resources." Soil Erosion & Sedimentation Control Plan Review Reasons for Approval with Performance Reservations Given existing topograohv and noted drainage areas, close monitoring and maintenance of stone silt fence outlets at soil stockpile areas will be especially critical to avoid overwhelming of sediment control measures. CC1: CC2: 1303 Cherryville Highway, Dallas, NC 28034 Citizens Resource Center Telephone: 704-922.4181