HomeMy WebLinkAbout19870413 Ver 1_Complete File_19871119
State of North Carolina
Department of Natural Resources and Community Development
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor R. Paul Wilms
S. Thomas Rhodes, Secretary November 19, 1987 Director
Mr. Joseph W. Cuilla, P.E.
The Kling-Lindquist Partnership, Inc.
2301 Chesnut Street
Philadelphia, PA 19103
Subject: Proposed Fill in
Headwaters or Isolated
Wetlands
Glaxo, Inc., R&D Facilities
Durham County
Dear Mr. Cuilla:
Upon review of your request for Water Quality
Certification to place fill material in a tributary to
Northeast Creek, we have determined that the proposed fill
can be covered by General Water Quality Certification No.
2176 issued November 4, 1987. A copy of the General
Certification is attached. This Certification may be used
in qualifying for coverage under Corps of Engineers'
Nationwide Permit No. 26.
If you have any questions, please contact Bill Mills at
919/733-5083.
Sincerely,
Original Si! ' 7_e-,d By
William C. i4r"dls
For R. Paul Wilms
RPW/dkb
Attachment
cc: Wilmington District Corps of Engineers
Raleigh Regional Office
Pollution Prevention Pays
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015
An E^ual On-rtunir, Affirmative Action Em-lover
Y
The Kling-Lindquist Partnership, Inc.
2301 Chestnut Street
Philadelphia, PA 19103
215 569 2900
July 30, 1987
RECEIVED
Mr. William C. Mills
North Carolina Department of Natural
Resources and Community Development
P.O. Box 27687
Raleigh, North Carolina 27611-7687
RE: Glaxo, Inc., R & D Facilities, Research Triangle Park,
Project No. 2345
Dear Mr. Mills:
Architecture Engineering
Interior Design &
Consulting Services
AUG 0 7 1987
WAILK (QUALITY SECTION
4PERATt! 'NS BRANCM
We have completed the application for Water Quality Certification and sub-
mit this to your Department for review.
Attached are copies of all appropriate documentation for your perusal,
which include:
- One copy of application for Water Quality Certification.
- Narrative describing project.
- Sketch SKA-1, Master Plan outlining the facilities.
- Sketch SKC-1, Master Plan for Stormwater Sewer.
- Copy of USGS Map indicating Drainage Area.
- Copy of letter dated March 16, 1987 from Corps of Engineers, Mr. Hollis,
referencing this project.
- Photocopy of FEMA Flood Study.
If you have any questions, please contact me.
At the request of the Army Corps of Engineers, we are copying them.
Sincerely,
Q . C -at,
9seph W. Cuilla, P.E.
JWC/mmk
Enclosure
cc: Mr. Charles W. Hollis, Corps of Engineers
Mr. Mike Herriott, Glaxo
Mr. Helmut Krohnemann
Mr. Bob Wetmore
Dr. S. Das
APPLICATION
r , FOR
PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY_GERTIFICATION
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
Department of Administration State of North Carolina Department of the Army
(GS 146-12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District
(GS 113-229,143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329)
DECEIVED
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank.
AU O 7 19$7
WAILk QUALITY SECTION
1. Applicant Information OPERATIONS BRANCH
A. Name GLAXO INC.
Last First Middle
B. Address p.
Street, P. 0. Box or Route
Research Triangle Park NC 277nA (919) 248-2100
City or Town - State. Zip Code Phone
11. Location of Proposed Project:
A. County Durham
B. 1. City, town, community or landmark Research Triangle Park
2. Is proposed work within city limits? Yes No x
Unnamed
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
.Tributary to Northeast Creek
111. Description of Project
A. 1. Maintenance of existing project N/A 2. New work Fill across Intermittent Stream
B. Purpose of excavation or fill
1. Access channel N/A length width depth
2. Boat basin N/A length width depth
3. Fill area Dam/Road length 50'-0 width 40-0' depth 20-0'
4. Other N/A length width - depth
C. 1. Bulkhead length N/A Average distance waterward of MHW (shoreline)
2. Type of bulkhead construction (material) N/A
D. Excavated material (total for project)
1. Cubic yards N/A 2. Type of material N/A
E. Fill material to be placed below MHW (see also VI. A)
1. Cubic yards 50 2. Type of material On-site Earth for a structure
Earthen Dam.
IV. Land Type, Disposal Area, and Construction Equipment:
A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X
B. Does the disposal area include any marshland, swamps or other wetland? Yes No X
C. Disposal Area
1. Location N/A
2. Do you claim title to disposal area? N/A
D. Fill material source if fill is to be trucked in N/A
E. How will excavated material be entrapped and erosion controlled? Sediment Ras; ns, Silt T'Pnca
And Permanent Ground Cover.
F. Type of equipment to be used Front End Loaders. Bull Dozg-_ c?, Trucks.- etc -
G. Will marshland be crossed in transporting equipment to project site? If yes, explain No.
D& F-B 1
Rev. 10/78
V. Intended Use of Project Area (Describe)
A. 1. Private N/A
2. Commercial Dam/Road Constructed for Stormwater Management Facility.
yI 3. Housing Development or Industrial N/A
4. Other N/A
B. 1. Lot size(s) 192 Acres.
2. Elevation of lot(s) above mean high water 35'-0 ave.
3. Soil type and texture ):lard Clays to a depth of 3' to 7' w/partially weathered rock
4. Type of building facilities or structures Corporate Facilities, 4 to 5 story office
Buildings and Research Facilities with Central Plnnt_
S. Sewage disposal and/or wastewater treatment A. Existing County Sewerlanned Extension of Count
B. Describe Sewer
6. 1Land Classification'(circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL
CONSERVATION OTHER (SeeCAMA Local Land Use Flan Syr
VI. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes X No
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes_ No K_
2. Type of discharge N/A
3. Location of discharge N/A
VII. Present rate of shoreline erosion (if known): N/A
VI If. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for
work in project area, if applicable: N/A
IX. Length of time required to complete project: 1 year
X. In addition to the completed application form, the following items must be provided:
A. Attach y of the deed State application only) or other instrument under which applicant
claims title to the af# property. OR if applicant is not claiming to be the owner of said property,
3?tz3.
then forwar py of the or other instrument under which the owner claims title plus written
permi on from the owner to carry o?7t the project on his land.
14 Attach an accurate work plat drawn to scale on 8%z X 11" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy (
certified
D. List na nd com
Such owners h 3
plat must be served upon adjacent riparian landowners by registered or
aG.S. 113-229 (d)) Enter date served
asses of the riparian landowners with property adjoining applicant's.
in which to submit comments to agencies listed below.
X1. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolina's approved coastal management program and will be conducted in a
manner consistent with such program.
XII. Any permit issued pursuant to this application will allow only the development described in this appli-
cation and plat. Applicants should therefore describe in the application and plat all anticipated devel-
opment activities, including construction, excavation, filling, and land "c)earing.
DATE
Applicant's Signature
D&F-82 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS
Rev. 10/78
ad?
Glaxo Inc., - Research and Development Facilities
Research Triangle Park
Project Description
Glaxo Inc., is developing research and development facilities on approxima-
tely 192 acres located in Research Triangle Park, North Carolina. The site
extends approximatley 5,500 ft. north to south from Alexander Drive to
Ellis Road and is bounded on the east by the east/west expressway. The
northern half of the site, which has been selected for the Research and
Development Facilities, is totally wooded and intersected by an intermit-
tent stream bisecting this part of the site east to west. Two high points,
north and south of the stream, at elevations approximately 370 and 380
respectively, are located 50 to 60 feet above the stream. Low points of
295 and 305 mark the elevation of the intermittant stream.
The stream valley provides the opportunity for water detention to control
stormwater runoff. The proposed dam location for the stormwater detention
facility will also provide for the location of the proposed Boulevard. The
two new ponds, one of five acres and one of one acre surface area, will be
developed for stormwater management. The location of these ponds is basi-
cally along the natural water course of the existing intermittant stream.
The approximate area of stream bed disturbance during construction is equal
to 6 ft wide x 1500 ft long/43560 sq. ft. per acre = 0.2 acres.
The development for the master plan of the Glaxo facilities will be
completed in four phases. Construction within the stream location for the
detention facilities will commence with the second phase of construction.
Listed below are the parts of the facility and.the estimated construction
beginning dates and completion dates.
Development Phase Description
1. PD Pilot and Central Plant
Construction Construction
Start Date Completion Date
10/87 4/89
2. Administration
3. R&D Labs, PD Labs & Nodes
12/87 9/89
6/88 3/AO
4. Animal/Tox Facility 8/88 3/90
„
1 ?
IN REPLY REFER TO
Regulatory Branch
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
March 16, 1987
Mr. Joseph W. Cuilla
Kling-Lindquist Partnership,
Incorporated
2301 Chestnut Street
Philadelphia, Pennsylvania 19103
Dear Mr. Cuilla:
g. ul?lr+ar?
Reference your letter of February 17, 1987, concerning the ,
proposed Glaxo Facility in Research Triangle Park, Durham County,
North Carolina.
In response to that letter, Mr. Ken Jolly of my staff
inspected the proposed worksite on March 3, 1987. The inspection
revealed that the site consists of high ground with the exception
of an unnamed tributary to Northeast Creek which traverses the
northern limits of the tract. Our review of the plans submitted
with your letter indicates that you propose to construct a road
across this stream and also build two ponds on this drainway.
Work entirely restricted to existing high ground will not
require Department of the Army permits. However, Federal permit
authorization will be required for any discharge of fill material
into the stream on the property. We would appreciate the
opportunity to review detailed plans of all work in the stream,
when such plans become available, for a specific determination of
Federal permit requirements.
Should you have questions, please contact Mr. JoPy,
Regulatory Branch, telephone (919) 343-4632.
Sincerely,
ar s W. Ho is
hie , Regulatory Branch
Copy Furnished:
Ms. Susan Suggs
Durham County Planning
Department
201 East Main Street
Durham, North Carolina 27701
,
?
\ 1 i
------- - ----------
4w a
-- . ---
i
' .ELLIS ROAD
' -?---- -- 6?
7
I
i
j
i
L
i
5kv, 3 lip
` ----- ~ ~ ------ r
/ - - .may/ _-?J
' -- >
1 RESEARCH LABORATORY °C
2 PHARMACEUTICAL DEVELOPMENT
3 RESEARCH ADMINISTRATION
,
4 CENTRAL PLANT ~'•`._
i %1
5 PARKING DECK %
6 GUARD HOUSE ,
i
7
PONDS r
8 INFORMATION CENTER
9 ADMINISTRATION
10 HEADOUARTERS
;1 r
.r
„
:
,
, i
r
,
'W l
I? ! k
,N
, IL"
N
\
. i
41
5 1
,
O
ALEXANDER DRIVE -_
%
1
• NORTH
1':600'
V J I
Q
V
o` u c"
u
z
L
H
Z W
z
Q ?
i
0
Ln a
z
V
z
W
M
Z
O
i
Vi. VII
W W
C
?
p V
u- v
< L"/
? 0 <
d
W
Q c z
X
Q Cu
<
?
J
V _
u
W
N
W
* -" -----_ELLIS ROAD r
- :? r - - - EA$T
WEST m
'-- -- - t---- ±?'-. sXWAY
s r ?a? O V O
y. DETENTIO
POND
OUTFALL O'
'a STRUCTURE _ G
_.. ,
_ - - .r
- K;
r .-L H :i
-?
SWALE Z G
MP;,,i --_?_- i CG N9
z- C)
LEGEND
?•••?-¦••? ' STORMWATER SEWER -•`- -
....??...? MANHOLE P H A S E? 2
>- ?••???¦?¦ CATCH BASIN
?••?••?••? HEADWALL W/RIP-RAP
EXISTING ' ?-
"•-?---? SWALE CATCH BASIN C <
MOORE - - /
DRIVE
.'v NORTH
1":350'
X ec
J
=
V
«
?I ? //J?) mom.. \ ?!y? i i ! ? i. '??? ?1\l?yi/- ??' j
?, ?a t/ywj 1926 9- ? ? ? r '?\ , r ? L r
J itl W \ J Sn IA r' \ 1 J r/?.
350 `.. + • I 8/ ?l-; _, %i/ .
...
T.r/-Pr kJ if ;' : •1?? ( ?. • rT ?,•• 1 ` c`^•_.?.: '/
3982 r
' ./ 1117! r!? a ???' :. /w r" 1
- JQ`? •? ' _`?' l'. I /. ,a???'?r-Sj (1 ,,; •I'%1 L;%?1? , I'` ? t91r
57'30 - .. •` ^, , ,, ? 1???7.r?,. p??? jl ';1' y?. 1 ,j?ln,.
3981 r ?, 1 '. .._ I . II ; a• } ?,? •- i J I 1 ? / ???? • ?1 / rs `' • ?/
• ' X11 , ???? r _ l ?_-?- ??? i ? l 7 %1 _s ? ?)i .(?,`_,;;??
! \ ?:`\
ILI
_ ,r . SCIaxD/??J
ayp
)' •/ /
1 ' ... off- i O • • Ii Gou
\ ! `
IQ c I' r i ykZ%'a• /?..._ t
B
\ _ \ 19511 r ? , ? 356 ? ? ~ JF v ? ?\ l? ? t`: \l? U M`424 •• ` , ? ??.
l (?i / ?!( t ltd ?? f t ?Wat? 92 •VJa
•
`w''??, -Southern \ . I anuel.. ?.. , f ? i . ? ,..xi, • ,T0 (• .. ? T2
41
711
7t/ J
? I I .:... •. ?.L..-r _?C- .m?' fib„ «r, s/Q / ,J / t , ,.. , ?r? _ ? r .? ? t
J ..? \
Gott:
x3?t 3' o
INN
41
41.
rc?
'? .. :-_`? ?\Jf Wt J3M 'y_ y8•' .p r4 ?j`?t
1121
J / 195 J f (..
l) ?? ? ?,` ,Stabs ?? Lfj'? a `
i `` /:. - ? ???/ -. ? >fr?\? •{ ?? 1i 350 ; r ?; ! \"-/? 1?----?C
%
v J r/ 1 / r I '
??
o Fo m
ODD °
0 o O
o , (A Z
mi c p m
;. D _ o o n
Sao ;: o m?
^d? ?" c 9``Fp I
O N
? O ?
/... m y
_ D
N Co
O ?N
f m Z
n m
1 m f,
D
1
711
cl;
0
FREE
yy
v
c
D
N
Z
n ?y
to
H
NON41noS =?
i c.
N
Z
m
D ,