Loading...
HomeMy WebLinkAboutNCC191259_ESC Approval Submitted_20190814ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality May 31, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Delhaize America ATTN: Donald Molihan, Director of Operations 1703 East D Street Butner, NC 27509 RE: Project Name: ADUSA DC-9 Freezer Expansion Project ID: GRANV-2019-012 Acres Approved: 10.8 County: GRANVILLE, City: Butner Address: 1703 East D St. River Basin: Neuse, Stream Classification: Falls Lake Watershed Submitted By: Bohler Engineering NC, PLLC Date Received by LQS: May 22, 2019 Plan Type: Revised Dear Mr. Molihan: This office has reviewed the subject erosion and sedimentation control plan. We Find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (N01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucasPncdenr.gov or Paul Clark at Paul.ciarkOncdenngov. After you submit a complete and correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. RE North Carolina Department of Environmental Quality ' Division of Energy. Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 Letter of Disapproval Delhaize America May 31, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspection made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute l 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, CS . Sally Cast e, El Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGO1 Fact Sheet cc: Wyatt Bone (wbone@t)olilereng.com ] - Electronic Copy DEMLR - Raleigh Regional Office File Letter of Disapproval Delhaize America May 31, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: ADUSA DC-9 Freezer Expansion Project ID: GRANV-2019-012 County: GRANVILLE 1. Provide a legend with symbols/icons to identify all proposed erosion and sedimentation control measures. Measures are to be to scale. Use the symbol in the legend provided for erosion control matting on the slopes. It appears the symbol identified for stockpiles was used on slopes (GS 113A-57(3), 15A NCAC 0413.0105, 15A NCAC 04B .0I06(5)) 2. Provide two copies of the plan set (one full-size and one half-size), showing the modifications required for approval. To facilitate DEMLR review, bubble, highlight, or otherwise identify the changes to your resubmittal. Provide one copy of additional items (such as design calculations). Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A-57(4))