Loading...
HomeMy WebLinkAboutNCC191320_ESC Approval Submitted_20190814SOIL EROSION AND SEDIMENTATION CONTROL Natalie J. Berry P.E. Water 0— ality Administrator August 5, 2019 C/O John Kinnaird, PE Brooks Engineering Associates 17 Arlington Street Asheville, NC 28803 Andy Baker, Managing Member Luna Ridge LLC 120 High Hickory Trail Swammanoa, NC 28778 Acres Approved: 10.5 Project ID: 20190503 County: Henderson City: 0 Clark Gap Rd River Basin: French Broad Stream Classification: Hoopers Creek C;Tr; Featherstone Creek C Submitted By: John Kinniard, Brooks Engineering Date Received by HC: May 21, 2019 Plan Type: New Submittal Subject: Approval with Conditions Letter Regarding - Soil Erosion and Sedimentation Control. 20190503 - Luna Ridge Subdivision - Henderson County Dear Luna Ridge LLC, This office received a complete submittal for "Luna Ridge Subdivision" on May 21, 2019. After review of the submittal the subject erosion and sedimentation control plan, we find the plan to be acceptable and hereby issue this letter of Approval with conditions. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Chapter 42 Article VIII Subpart E §42-256.(1) of the Henderson County Code as well as the by Title 15A NCAC 413.0129. Please be advised that Article VIII Subpart E §42-256.(N) of the Henderson County Code and Title 15A NCAC 413.0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by Article VIII Subpart E §42-268.(A) of the Henderson County Code and NCGS 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and 100 North King Street, Suite 118 Hendersonville, NC 28792 Webpage: https://www.hendersoncountync.gov/waterresources Approval Letter Permit No. 20190503 "Luna Ridge Subdivision "cont'd" correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after August 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66) and the Henderson County Code, this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify me if you plan to have a pre -construction conference. Your cooperation is appreciated. This project will be kept on file at the Henderson County Office. If you have any questions, or need additional information concerning this matter, please contact the Soil Erosion and Sedimentation Control Administrator at (828) 694-6521. Sincerely, Natalie J. Berry, PE, CPESC, CPSWQ, CFM cc: 20190503 File ec: Shawna Riddle, Asheville Regional Office Conditions for Approval 1. Self -Inspection reports must be filled out appropriately and kept on site for inspection by the erosion control office at the inspector's request. They can be emailed to nberrya.hendersoncountvnc.gov weekly if you prefer. 100 North King Street, Suite 118 Hendersonville, NC 28792 Webpage: https://www.hendemncountync.goy/waterresources