Loading...
HomeMy WebLinkAboutNCC191333_NOI Application_20190813Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/12/2019 11:46:58 AM (NCG01 NOI Submission) Approve by Clark, Paul 8/12/2019 12:40:23 PM (Review- Construction NOI 14719) • The task was assigned to Clark, Paul by round robin distribution 8/12/2019 11:47 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 14, 2019 5:00 PM 8/12/2019 11:47 AM Submit by Lucas, Annette 8/13/2019 10:09:05 AM (Payment Verification for NCC191333) • Lucas, Annette assigned the task to Lucas, Annette 8/13/2019 10:08 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 26, 2019 5:00 PM 8/12/2019 12:40 PM 1 r-G) ff T:M'G)M F1Ii f_TiI a 10141 NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Carolina Connector Intermodal Rail Terminal 2. County* Edgecombe 3. Highway or Street 5770 Old Battleboro Road Address * Street name only is acceptable if no address nurrber assigned yet 4. City or Township * Rocky Mount 5. State * NC 6. Zip Code* 27809 7. Latitude * Enter the latitude in decirral degrees 36.0275 8. Longitude * Enter the longitude in decirral degrees (WISTbe negative) -77.7517 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/14/2019 Estimated Construction Project Start Date 10. Date to End* 01 /01 /2021 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Development 12. Acres to be 235.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 400.00 (acres)* 14. Post- 32.30 construction (Estimated) impervious area (acres) * NCC Project NCC-EDGEC-2019-Carolina Connector Intermodal Rail Terminal Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Unnamed Tributary of Beech Branch Waterbody * Nacre of waterbody into which stormuater runoff will discharge 15b. Waterbody 28-75-(2) Index No. * NCWaterbody Index Nanber Stormwater r No discharges will flow rj Yes to additional wate rs * 15c. Additional Unnamed Tributary of Compass Creek Receiving Waterbody narre Waterbody 15d. Waterbody 28-72 Index No. NCWaterbody Index Ninber 15e. Additional Waterbody nave Receiving Waterbody 15f. Waterbody NCWaterbody Index Nunter Index No. 16a. Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization CSX Transportation, Inc Name * 2. First Name* Richard ff Corporation, enter Registered Agent First l\brre 3. Last Name * Hisrich ff Corporation, enter Registered Agent Last Barre 3b. Title Director Terminal Development 4. Permitee E-mail Richard_Hisrich@csx.com Address* 5. Permittee 904-633-1427 Telephone No.* 6. Permittee Mailing Street Address Address* 500 Water Street, S/C J350 Address Line 2 City State / Province / Region Jacksonville FL Rastal / Zip Code Country 32202 us Check box if the r% Yes street address the same as mailing address 7. Permittee Street Street Address Address* 500 Water Street Address Line 2 City State / Province / Region Jacksonville FL Pastal / Zip Code Country 32202 us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Brandon Contact - First Name * 3. Primary Site Knapp Contact - Last Name * 4. Title Director of Construction - Public Projects 5. Site Contact E- brandon_knapp@csx.com mail Address* 6. Site Contact 904-652-5690 Telephone No.* 7.Organization CSX Transportation Name 8. Site Contact Street Address Mailing Address* 500 Water Street S/C J350 Address Line 2 aty Jacksonville Fbstal / Zip Code 32202 State / Province / Region FL Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/12/2019 Approved * 2. E&SC Plan Project EDGEC-2020-002 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan EDGEC-2020-002 LOA 20190812.pdf 55.21 KB Approval Mast be FDF format letter/documentation 6. NOI Certification Carolina Connection Intermodal Rail Terminal Form NOI.pdf 643.77KB Mist be FDFforrrat This is an Express f• No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Richard Hisrich Title Director Terminal Development Organization CSX Transportation, Inc. Date * 08/12/2019 F. Tracking and COC Info NOI Tracking No. 14719 NC Reference No. NCG01-2019-1333 Uses 'count number variable (incremrented by SP) Certificate of NCC191333 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 1333 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)