HomeMy WebLinkAboutNCC191279_ESC Approval Submitted_20190809v NaURQ e
'f G
c
URTM CAROB
MECKLENBURG COUNTY
Land Use & Environmental Services Agency
Storm Water Services
8/7/2019
Email: dhaneshnkinaerhomes.com
Dhanesh Kumar
215 N. Pine Street, Unit 2011
Charlotte, NC 28202
Re: Tanfield Subdivision Extension (#393006)
Approval as noted of plans
Denuded acreage 3.92
Dear Mr. Kumar:
Please be advised that the above referenced plan has been approved by this Office. This approval is
required prior to applying for the Construction Stormwater General Permit (NCGO10000). Application
for this permit can be made at https://deq.nc.gov/NCG01. Please contact Jason Klingler (980-721-3567),
Erosion Control Inspector to set up a pre -construction meeting after obtaining your Certificate of
Coverage (COC) from NCDEQ. Refer to the attached Fact Sheet for additional information.
The Planning Department of the Town of Matthews is being notified of this approval by copy of this
letter. Plans that are stamped approved will be held within EPM's "approved package" for printing out as
needed.
In addition, please always print out an approved set with approval stamps to be kept out at the site.
If you have any questions, please give me a call at 980-314-3232.
Sincerely,
Adam Nowocin, PE
Mecklenburg County Project Manager
CC: Town of Matthews Planning Department — Mary Jo Gollnitz
Project Manager — Travis Gingras — HensonFoley Design Inc.
Erosion Control Inspector — Jason Klingler
Mecklenburg County Land Development- Heather Davis
EPM Approved project
PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS
• 2145 Suttle Avenue • Charlotte, North Carolina 28208-5237 •
www.mecklenburgcountync.gov