Loading...
HomeMy WebLinkAbout20070339 Ver 1_Application_20070227~~Y M ~~ 3J' e ~a~o MICHAEL F. EASLEY GOVERNOR U.S. Army Corps of Engineers Regulatory Field Office 6508 Falls of Neuse Road Suite 120 Raleigh, NC 27615 ATTENTION: Dear Sir: STATE OF NORTH CAROLINA DEPARTN~NT OF TRANSPORTATIO Mr. Andrew Williams NCDOT Coordinator ~~ /~, "l ~~~~ ~. ''~ °! ~y T9y0Oc'L ~ ~ ~,J'r~ y2 '~e,f' ~y N ~9f,<:;ti ~.r~. ~~, ~~i ~-~` l LYNDO TIPP~fT SECRETARY 070339 Subject: Section 404 Nationwide Permit 23 and 33 Application for replacement of Bridge No. 165 over Paw Paw Creek tributary on SR 1376 (Paw Paw Rd.) in Rockingham County, Division 7. State Project No. 8.2511301, Federal Aid Project No. BRZ-1376(1), TIP No. B-3900; WBS Element No. 33336.1.1. References: NCDOT letter to USFWS, September 7, 2004. USFWS letter to NCDOT, September 16, 2004. Please see the enclosed Pre-Construction Notification (PCN), permit drawings, roadway design plans, Programmatic Categorical Exclusion (PCE) and the Natural Resources Technical Report (NRTR) for the subject project. The North Carolina Department of Transportation (NCDOT) plans to replace the 36-foot length bridge with a double 11 foot x 9 foot x 59.5 foot reinforced concrete box culvert (RCBC) using a diversion channel to maintain flow during construction. The new RCBC will be constructed approximately 20 feet east of the existing alignment. Traffic will be detoured offsite during construction. The roadway grade of the new structure will be approximately nine feet above the existing roadway at this location. Roadwork for the shifted alignment will begin approximately 300 feet to the south of the existing bridge and entl approximately 320 feet north of the existing bridge. The existing roadway approaches will be widened to provide a maximum 22 foot roadway width with two 11 foot lanes (the actual width maybe three feet wider to accommodate vehicular movement). Four-foot (seven foot where guardrail is required) grass shoulders will be provided on each side. MAILING ADDRESS: LOCATION: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-715-1 S34 2728 CAPITAL BLVD. PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX: 919-715-5501 SUITE 240 RALEIGH NC 27604 1598 MAIL SERVICE CENTER WEBSITE: yyWyy.NCDOT.ORG RALEIGH NC 27699-1598 February 19, 2007 IMPACT TO WATERS OF THE UNITED STATES General Description: The project is located in the Roanoke River basin (Sub-basin 03-02-02, Hydrologic Unit 03010103). The jurisdictional resource in the project area is a perennial stream that is an unnamed tributary (UT) to Paw Paw Creek. The Division of Water Quality stream index number for Paw Paw Creek is 22-30-6(2). The channel of the UT to Paw Paw Creek is approximately 8-10 feet wide and has an average depth of 3-4 feet. On the day of a site visit on August 2, 2006, the average stream flow was slow and measured approximately 5-7 feet wide and 4 inches to 1 foot deep. The substrate is composed of gravel, sand and silt. At this location, the UT to Paw Paw Creek has a best usage classification of WS-IV. No Outstanding Resource Waters (ORW), High Quality Waters (HQW), WS-I, or WS-II Waters occur within 1.0 mile of the project study area. Paw Paw Creek is not listed on the 303(d) list for North Carolina impaired waters (NCDENR-DWQ, 2004). Permanent Impacts: There will be 91 feet of permanent surface water impacts associated with this project. The permanent impacts are from construction of the new culvert (plus the wing- walls) on an alignment 20 feet east of the existing alignment. Please see discussion of the proposed culvert history in the Federally Protected Species section under James spinymussel. The project will not impact wetlands. Temporary Impacts: There will be 0.04 acres (122 feet) of surface water impacts due to construction of a temporary diversion channel to maintain water flow during construction. No temporary wetland impacts are associated with this project. Bridge Demolition: The existing two span bridge was constructed in 1956 and is composed entirely of a timber deck with asphalt wearing surface on timber girders. The substructure is composed of timber caps and timber piles. The existing deck has a thickness of 1.7 feet and is seven feet above the creek bed. The existing bridge is 36 feet long and 20 feet wide. Bridge No. 165 will be removed without dropping components into Waters of the United States. All guidelines for bridge demolition and removal will be followed in addition to Best Management Practices for the Protection of Surface Waters. This project is classified as Case 3 in that there are no special restrictions other than those outlined in Best Management Practices for the Protection of Surface Waters and Bridge Demolition and Removal. Utility Impacts: No jurisdictional impacts will occur from the utility pole relocation. Energy United EMC has an existing aerial single-phase line that crosses the bridge structure (left and right of the L line). This line will be relocated near the right of way line (left of the L line) prior to the date of availability. After the new line is put into service the existing line will be dismantled and removed. There are no other utilities located within the project limits. FEDERALLY PROTECTED SPECIES Plants and animals with a federal classification of Endangered (E), Threatened (T), Proposed Endangered (PE) and Proposed Threatened (PT) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973, as amended. The US Fish and Wildlife Service (USFWS) lists 2federally-protected species, as of December 11, 2006 for Rockingham 2 County. The Endangered and Threatened species in North Carolina web-site was checked on January 12, 2007 for any changes and the list remains the same. The species under federal protection are listed in Table 1. Table 1. Federally Protected S ecies for Rockin am Count Common Name Scientific Name Federal Status Habitat Present Biological Conclusion James Pleurobema Endangered Yes May Affect- spinymussel collina Not likely to adversely affect Smooth Echinacea Endangered Yes No Effect Coneflower laevi ata Pleurobema collina (James spinymussel) Freshwater mussel surveys were conducted on March 27, 2003 by NCDOT biologists in areas that possessed any suitable habitat. Survey limits were an estimated 1300 feet downstream to 330 feet upstream of the existing bridge. A total of 1.5 person-hours were spent during the survey. No mussels of any kind were found. Given the survey results, it is probable that the James spinymussel does not occur in the project footprint. However, because this stream is a tributary of the Mayo River, in which the James spinymussel is known to occur (within a mile of the confluence), the biological conclusion of May Affect, Not likely to Adversely Affect" is most appropriate. NCDOT requested concurrence for this project on October 29, 2003. A request from the USFWS (November 25, 2003) was made that NCDOT investigate an alternative culvert design of an open bottom culvert rather than the standard double barrel culvert. The NCDOT sent a letter to the USFWS on September 7, 2004 requesting concurrence to construct a 8 foot x 6 foot double barrel culvert after conducting the alternative analysis. The letter stated that the proposed 8 foot x 6 foot culvert would be constructed following all conservation methods and be buried as per construction requirements to provide fish passage and have a sill placed in one of the barrels to maintain normal flow conditions. Concurrence from the USFWS was requested for the proposed culvert. In a letter dated September 16, 2004 (enclosed) the USFWS concurred with the May Affect, Not likely to Adversely Affect the James spiny mussel conclusion based on the proposed 8 foot x 6 foot culvert with a sill in one barrel. The current permit drawings and roadway plans show an 11 foot x 9 foot double barrel culvert with a sill. The rise in the roadway grade eliminated the potential for weir flow necessitating the need for more conveyance (such as a larger culvert) through the transportation facility. The larger culvert size is to keep from raising the water surface in a 100 year storm more than one foot above the natural condition. The USFWS was contacted by email (May 4, 2006) about the change in culvert size. Mr. Gary Jordan (USFWS) responded in an email (May 8, 2006) that the previous concurrence is still valid based on the new larger culvert size assuming that a sill is on one barrel. 3 Echinacea laevigata (Smooth coneflower) Suitable habitat for the smooth coneflower is present within the road shoulders of the project area. A plant by plant survey for smooth coneflower, within the road shoulders area, was conducted on May 17, 2001, July 13, 2004 and August 2, 2006 by NCDOT biologists. No smooth coneflower specimens were found during these surveys. A review of the NC Natural Heritage Program database of rare species and unique habitats on January 12, 2007 revealed that no known populations of smooth coneflower occur within 1.0 mile of the project study area. No impacts to the smooth coneflower are anticipated. Therefore, the Biological Conclusion of No Effect remains valid from the NRTR document. RESTORATION PLAN Following construction of the bridge, all material used in the construction of the structure will be removed. The impact area associated with the bridge is expected to recover naturally, since the natural streambed and plant material will not be removed. NCDOT does not propose any additional planting in this area. Class I riprap and filter fabric will be used for bank stabilization. Pre-project elevations will be restored. NCDOT will restore stream to its pre-project contours. Schedule: The project calls for a letting of July 17, 2007 with a date of availability of August 28, 2007. It is expected that contractor will choose to start construction in August 2007. Removal and Disposal Plan: The contractor will be required to submit a reclamation plan for the removal of and disposal of all material off-site at an upland location. The contractor will use excavation equipment for removal of any earthen material. Heavy-duty trucks, dozers, cranes and various other pieces of mechanical equipment necessary for construction of roadways and bridges will be used on site. All material placed in the stream will be removed from the stream at that time. The contractor will have the option of reusing any of the materials that the engineer deems suitable in the construction of project. After the erosion control devices are no longer needed, all temporary materials will become the property of the contractor. AVOIDANCE, MINIMIZATION and MITIGATION Avoidance and Minimization: Avoidance examines all appropriate and practicable possibilities of averting impacts to "Waters of the US". The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts and to minimize impacts as part of the project design. Practical means to minimize impacts to surface waters temporarily impacted by the project include: Project Specific Measures- • During construction a road closure is planned and traffic will be diverted to an off-site detour • The culvert is to be constructed with a sill in one barrel and buried per construction requirements to allow fish passage • The existing bridge can be removed without any debris falling into the water. 4 Standard Measures- • Best Management Practices will be followed for this project as outlined in "NCDOT's Best Management Practices for Construction and Maintenance Activities" Mitigation: An acceptance letter dated February 13, 2007 from the Ecosystem Enhancement Program (EEP) is attached. NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. Unavoidable, permanent impacts to 91 feet of jurisdictional stream will be offset by compensatory mitigation provided by the EEP program. The project will not impact wetlands. REGULATORY APPROVALS Section 404 Permit: It is anticipated that impacts from construction of the new culvert and construction of a temporary diversion channel will be authorized under Section 404 Nationwide Permit 23 and 33. We are therefore requesting the issuance of Nationwide Permits 23 and 33 for the culvert construction and temporary diversion channel construction. Section 401 Permit: We anticipate 401 General Certification number 3403 will be applicable to this project. All general conditions of the Water Quality Certification will be met. Therefore, in accordance with 15A NCAC 2H, Section .0500(a) and 15A NCAC 2B .0200 we are providing 2 copies of this application to the North Carolina Department of Environment and Natural Resources, Division of Water Quality for their notification. 5 Thank you for your time and assistance with this project. A copy of this permit application will be posted on the NCDOT website at http://www.ncdot.org/doh/preconstruct/pe/neu/permit.html. Please contact Susan Thebert at (919) 715-1461 or sthebert@dot.state.nc.us if you have any questions or need any additional information. Sincerely, -, . _ ~~~ ~`l'~ Gregory J. Thorpe, Ph.D Environmental Management Director, PDEA w/attachment Mr. John Hennessy, NCDWQ (2 Copies) Mr. Travis Wilson, NCWRC Mr. Gary Jordan, USFWS Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. Mark Staley, Roadside Environmental Mr. J. M. Mills, P.E., Division 7 Engineer Mr. Jerry Parker, Division 7 Environmental Officer w/o attachment Mr. Jay Bennett, P.E., Roadway Design Mr. Majid Alghandour, Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. John Williams, PDEA Project Planning Engineer Mr. Scott McLendon, USACE, Wilmington 6 Office Use Only: Form Version March OS X 0 0 7 0 3 3 9 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ^ 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 23 and 33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information 1. Owner/Applicant Information Name: Gregory J. Thorpe Ph.D. Environmental Management Director Mailing Address: 1598 Mail Service Center Telephone Number: (919) 733-3141 Fax Number: (919) 733-9794 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 1 of 9 r III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Replacement of Bridge No. 165 over Paw Paw Creek tributary on SR 1376 (Paw Paw Road) 2. T.I.P. Project Number or State Project Number (NCDOT Only): B-3900 3. Property Identification Number (Tax PIN): N/A 4. Location County: Rockingham Nearest Town: Stoneville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): US 220 north ,exit on SR 1360~roceed west first right on SR 1376 proceed to bride No. 165. Site coordinates (For linear projects, such as a road or utility line, separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): °N 6. Property size (acres 7. Name of nearest receiving body of water: Paw Paw Creek 8. River Basin: Roanoke (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/adinin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of-the project at the time of this application: SR 1376 is gravel road in a rural setting. Land use is forested in the study area. attach a sheet that °W Page 2 of 9 10. Describe the overall project in detail, including the type of equipment to be used: The bridge will be replaced by a 11 ft. x 9 ft. x 59.5 ft, double reinforced concrete box culvert RCBC) using a diversion channel to maintain flow during construction. The new RCBC will be constructed approximately 20 ft. east of the existing alignment. Traffic will be detoured off-site during construction. The roadway grade of the new structure will be approximately 9 ft. above the existing roadway. The alignment will be shifted beginning 300 ft. to the south and 320 ft. to the north of the existing bridge. The roadway approaches will be widened to a maximum of 22 ft. and 4 ft. (7 ft. with Quardrail) grass shoulders are proposed. 11. Explain the purpose of the proposed work: The existing bridge is functionally obsolete. Bridge replacement with a culvert will result in safer traffic operations. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) Page 3 of 9 should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Permanent surface water impacts of 91 ft. due to culvert construction. Temporary surface water impacts of (122 ft ) 0.04 acres are due to construction of the temporary diversion channel. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length (linear feet) Area of Impact (acres) culvert UT to Paw Paw Cr. culvert placement perennial 10-20 ft. 91 0.03 diversion channel UT to Paw Paw Cr. temp div. channel perennial 10-20 ft. 122 0.04 Total Stream Impact (by length and acreage) 213 0.07 Page 4 of 9 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill excavatinn_ dred~ing_ flooding. drainase. bulkheads, etc. ----, ---- Open Water Impact Site Number (indicate on ma) _ . ------, --- - - o--o, - Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) Total Open Water Impact (acres) 6. List the cumulative im act to all Waters of the U.S. resulting from the project: Stream Im act (acres): 0.07 Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) 0.07 Total Stream Impact (linear feet): 213 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USAGE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts Page 5 of 9 were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts.Culvert to be constructed with one sill to maintain normal flow. Culvert to be buried per construction requirements to allow for fish passage. Road closure and an off-site detoured are proposed. The existing bridge can be removed without any debris falling in the water. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http : //h2o. enr.state. nc. us/ncwetl ands/stnn gide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 6 of 9 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 91 Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount ofNon-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ^ If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all. impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No Page 7 of 9 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Impact Required Zone i~~.:~_o F o,~ Multiplier 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No Page 8 of 9 If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at htt~•//h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). r {~ / ~•~ App cant/ gent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 9 of 9 o stem ~. ~ a ~e. PROGRAM February 13, 2007 Mr. Gregory J. Thorpe, Ph.D. Environmental Management Director Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr. Thorpe: Subject: EEP Mitigation Acceptance Letter: R~~ ~~ D Ff8 1 6 ZOp~ ppFA DlVI,~%?~,.n, c OFFjO~ ~,.,,. , ,y13yy~yS ~; ~~ ~,`'irr~ ~N~ \~'~ENTI B-3900, Replace Bridge Number 165 over Paw Paw Creek on SR 1376 (Paw Paw Road), Rockingham County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the subject project. Based on the information supplied by you in a letter dated February 8, 2007, the impacts are located in CU 03010103 of the Roanoke River Basin in the Central Piedmont (CP) Eco-Region, and are as follows: Stream: 91 feet During the review of this request, it was noted that the 2006 Impact Projection Database listed no wetland or stream impacts for this project; however, EEP will provide the requested stream mitigation. If additional stream mitigation in this cataloging unit is required due to this previously unreported mitigation need, EEP will include it in the 2007-2008 biennial budget. EEP commits to implementing sufficient compensatory wetland mitigation to offset the impacts associated with this project by the end of the MOA Year in which this project is permitted, in accordance with Section X of the Memorandum of Agreement between the North Carolina Department of Environment and Natural Resources, the North Carolina Department of Transportation, and the U. S. Army Corps of Engineers, signed on July 22, 2003. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. t~~~t7(''i~'/t,~... .~t~%,~~~:~/~~., ~f''U~~:; :.~~'c,~ -~,lfifi.`~ ~`G~,?- NCDENR ~, North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, Nf 27699-1652 / 919-115-0476 / www.nceep.net If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, William D. Gilmore, P.E. EEP Director cc: Mr. Andy Williams, USACE -Raleigh Mr. John Hennessy, Division of Water Quality, Wetlands/401 Unit File: B-3900 ._o ~~~~ ....~.~, . a , ~ _ ~1 __ -~ ., PROGRAM February 13, 2007 Mr. Andy Williams U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 Dear Mr. Williams: Subject: EEP Mitigation Acceptance Letter: B-3900, Replace Bridge Number 165 over Paw Paw Creek on SR 1376 (Paw Paw Road), Rockingham County; Roanoke River Basin (Cataloging Unit 03010103); Central Piedmont (CP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the unavoidable impact associated with the above referenced project. As indicated in the NCDOT's mitigation request letter dated February 8, 2007, compensatory stream mitigation from EEP is required for approximately 91 feet of stream impacts. Compensatory stream mitigation associated with this project will be provided in accordance with Section X of the Memorandum of Agreement between the N. C. Department of Environment and Natural Resources, the N. C. Department of Transportation, and the U. S. Army Corps of Engineers signed on July 22, 2003 (Tri-Party MOA). EEP commits to implement sufficient compensatory stream mitigation up to 182 stream credits to offset the impacts associated with this project by the end of the MOA year in which this project is permitted. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, .~ ~~ ~ William D. Gilmore, P.E. EEP Director cc: Mr. Gregory J. Thorpe, Ph.D., NCDOT-PDEA Mr. John Hennessy, Division of Water Quality, Wetlands/401 Unit File: B-3900 Nnrth farnlina Frncvctom Fnhanramant Frnaram 1/.S7 M~~I Co.~,~~a fe.,r~. R,h~rt1, Alf'17~~0 li,Cl / 010 71[ nAi[ / ....._.....__.. _.. w~ STA1Fa `fie ,,,-,,, .. ,+... ~Q ar v®~ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR September 7, 2004 Mr. Gary Jordan US Fish and Wildlife Service Post Office Box 33726 Raleigh, North Carolina 27636 Dear Mr. Jordan: LYNDO TIPPETT SECRETARY The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 165 on SR 1376 over an unnamed tributary to Pawpaw Creek which flows to the Mayo River in Rockingham County; (TIP No. B-3900). Attached, please find a memorandum dated May 7, 2003, discussing the biological conclusion for the federally endangered James spinymussel (Pleurobema collina). The biological conclusion of "May Affect -Not Likely to Adversely Affect" is considered appropriate for this species at this location. A request was made that NCDOT pursue the alternative analysis of an open bottom culvert rather than the standard double barrel culvert. Cost examination indicates that the standard culvert is approximately half of the bottomless and has afifty- percent longer life span. In addition, the length of time required for construction will be lessened by a third with the standard double barrel culvert. This 8 foot X 6 foot double barrel culvert will be constructed following all conservation methods, will be buried as per construction requirements to provide fish passage, and have a sill placed in one of the barrels to maintain normal flow conditions. Concurrence of the US Fish and Wildlife Service is requested for this conclusion. If additional information is required to respond to this request, please contact Steve Mitchell at 715-1549. Thank you for your assistance. Sincerely, ,~ ~---~ ~t Gregory .Thorpe, Ph.D. `~' Environmental Management Director Project Development and Environmental Analysis Branch Attachment MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9794 TRANSPORTATION BUILDING PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1 SOUTH WILMINGTON STREET 1548 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG RALEIGH NC RALEIGH NC 27699-1548 RECEIVED United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 2763fr3726 September 16, 2004 Gregory J. Thorpe, Ph.D. North Carolina Department of Transportation Project Development and Environmental Analysis 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Dr. Thorpe: SEP 17 2~4 DA-ISION OF HIGHWAYS PDEA-0FFICE OF NANRAI ENVIRONMBV'f This letter is in response to your letter of September 7, 2004 which provided the U.S. Fish and Wildlife Service (Service) with the biological conclusion of the North Carolina Department of Transportation (NCDOT) that the replacement of Bridge No. 165 on SR 1376 over an unnamed tributary to Paw Paw Creek, Rockingham County (TIP No. B-3900) may affect, but is not likely to adversely affect the federally endangered James spinymussel (Pleurobema collina). These comments are provided in accordance with section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.S.C. 1531- 1543). NCDOT previously requested concurrence for this project with a letter dated October 29, 2003. The Service responded with a letter dated November 25, 2003 which stated our intention to defer our concurrence decision until after NCDOT investigated an alternative culvert design which may reduce the likelihood of potential effects to the James spinymussel. Subsequently, Mr. Steve Mitchell (NCDOT) and Mr. Gary Jordan (Service biologist) discussed the results of that investigation during a telephone conversation on September 7, 2004. Your current letter summarizes that discussion. Based on previously submitted mussel survey results and other information provided, the Service concurs with your determination that the proposed project may affect, but is not likely to adversely affect the James spinymussel. We believe that the requirements of section 7(a)(2) of the ESA have been satisfied. We remind you that obligations under section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered in this review; (2) this action is subsequently modified in a manner that was not considered in this review; or (3) a new species is listed or critical habitat determined that may be affected by this identified action. The Service appreciates the opportunity to review this project. If you have any questions regarding our response, please contact Mr. Gary Jordan at (919) 856-4520 (Ext. 32). Sincerely, John Hammond Acting Ecological Services Supervisor cc: John Thomas, USACE, Raleigh, NC Beth Barnes, NCDWQ, Raleigh, NC Travis Wilson, NCWRC, Creedmoor, NC Chris Militscher, USEPA, Raleigh, NC ~ ,. ~ - . ~ G~~ ~ ~ 1377 1360 ~~ 1_382 ~ z - ~' ,~ ~ 1376 ~ Q~ L i~ - ~--_, 1375 ~ ' ~ ~ ~ ~ ~ - o ~ _- , __ PROJECT z2o RiV -' FR ~ ~ SITE _ 1 ~ / - ~--~ 1360 1603 13 9 2 STONEVILLE 1361 ~~~®~ DIVISION OF HIGHWAYS ROCgINGHAM COUNTY PROJECT: 33336.1.1 (B-3900) REPLACE BRG~165 OVER TRIB. TO PAW PAW CREEg ON SR 1376 SHEET / OF N2FTH CAPOLINA 0 z ~ o F ~ N (Y !p ~ ~ ¢ ~ a y 3 a ~ O F ~ ~ ^., O p x W ~ Z ~`'~ ~ ~ U `~ > O ~ _ o ~ 3 G w `~'r~ U Z W W x O Z O ~ U p U ~ O to ~n ~ O p m ~ ~ O w O a U ~ ZW_XU` ~ Z d (~ ~' d' O w W m 0 U H W ~ O ~ ~ ~ O W W W J Q l i 2 ~ a~a Q m U Z p H z? QZC7~ x ~ ~ o O W •• ~ Z J I- > W m Z ~ Q p ~ 2 ~ -F=-Z2U Z H ~ ~ ~ ~ U ~ > ~ H ~ ~ Z ~ U p w a ~ ~ Q d ~WwC9 ~O WV~ Y ~ ~ U p a m~ W ~ W U W ~// N/ N/ ~ /~ ~ ~ ii ~ W I.L 1.1. ~ 6' Z N Q mmrn~ 3 .~-I ~ .~ Z ~ p v~ m w a ~ C C U d N N N N H U Q M (9 y e 'Xt EH W U - a ~ y C C C U C a ~ W U ~ w LL w U ~. ~ ~ > f6 (n ~ ~"' p O ~ O ~ ~ Q ~ c C G C ~ O ~ ~ ~ ~ U p M O ~ EcnE~ o 0 H a~ ~- U a Q a ~, ~ C f" 'C N U ~ N C N `p O O ~ = U ~ o 0' W a ~ ~, o N C C ~ Q = O N ~ ~ U ~ O ~ ~ a o ~ ~ ~ m ~ ~ " o O Z x ~ J W H > a _ Ec~pp m Oo ~ii~~ o c c ~ co-f9~ i ~- ~ o o i ~ a~ o N 3 T F U ~ m ' (n ~ N ~ O O J ~ ~ o N .. O H ~ Z O PARCEL NO. NAMES AND ADDRESSES NAMES ADDRESSES 3 2 ARTHUR W. COBB RAY TWETEN 901 PAW PAW RD. STONEVILLE, N.C. 27048 1311 GRENOBLE COURT FREEHOLD, N.J. 07728 ~~~®~ DIVISION OF HIGHWAYS ROCgINGHAM COUNTY PROJECT:33336.1.1 (B-3900) REPLACE BRG~165 OVER TRIB. TO PAW PAW CREEg ON SR 1376 L ~ SHEET 4 OF -~- ~ r • CATEGORICAL EXCLUSION ACTION CLASSIFICATION FORM TIP Project No. State Project No. W.B.S. No. Federal Project No F~ ~ `'~u< rti.h~t? nr s.ls~ni F~E4•GFF~L~ yr i~ir" 4'~~;i ~Pi~3~G'Y~'t1+lT A. B. C Project Description: B-3900 8.2511301 33336.1.1 BRZ-1376(1) The purpose of this project is to replace Rockingham County Bridge No. 165 over an unnamed creek. The replacement structure will consist of atwo-barrel (each barrel 8x6 feet) reinforced concrete box culvert on an alignment shifted approximately 20 feet east of the existing alignment. Traffic will be detoured offsite during construction. The roadway grade of the new structure will be approximately 9 feet above the existing roadway at this location. Roadwork for the shifted alignment will begin approximately 300 feet to the south of the existing bridge and approximately 320 feet north of the existing bridge. The existing roadway approaches will be widened to provide a minimum 22-foot pavement width with two 11-foot lanes (the actual width may be 3 feet wider to accommodate vehicular movement.) Six-foot (nine-foot where guardrail is required) grass shoulders will be provided on each side. Purpose and Need: Bridge Maintenance Unit records indicate the bridge has a sufficiency rating of 40.3 out of a possible 100 for a new structure. The bridge is considered functionally obsolete with deck geometry rating of 3 out of 9 according to Federal Highway Administration (FHWA) guidelines. The bridge is therefore eligible for FHWA's Highway Bridge Replacement and Rehabilitation Program. Bridge No. 165, built in 1956, is nearing the end of its useful life. The narrow bridge deck (20 feet wide) aging timber bridge components, increasing maintenance costs and a structure not designed to carry modern traffic loads (posted 11 tons for single vehicles, 19 ton for truck-tractor semi-trailers) are the reasons driving the need for replacement. Proposed Improvements: Circle one or more of the following Type II improvements which apply to the project: Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing). r~ a street with adequate capacity to handle anticipated bus and support vehicle traffic. 9. Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users. 10. Construction of bus transfer facilities (an open azea consisting of passenger shelters, boazding azeas, kiosks and related street improvements) when located in a commercial azea or other high activity center in which there is adequate street capacity for projected bus traffic. 11. Construction of rail storage and maintenance facilities in azeas used predominantly for industnal or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community. 12. Acquisition of land for hazdship or protective purposes, advance land acquisition loans under section 3(b) of the UMT Act. Hardship and protective buying will be permitted only for a particular parcel or a limited number of pazcels. These types of land acquisition qualify for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. 13. Acquisition and construction of wetland, stream and endangered species mitigation sites. 14. Remedial activities involving the removal, treatment or monitoring of soil or groundwater contamination pursuant to state or federal remediation guidelines. D. Special Project Information• Estimated Costs: Total Construction $ 475,000 Right of Way $ 37,000 Total $ 512,000 Estimated Traffic: Current - 100 Yeaz 2025 - 200 TTST - 1% Dual - 2% Accidents: No accidents were recorded in a check of a recent three-yeaz period. Design Speed & Design Exception: This roadway will be designed as a rural local route with lane, shoulder and guazdrail meeting the criteria fora 60-mile per hour design speed. The horizontal curvature meets a 30-mile per hour design speed and the vertical curvature meets a 30-mile per hour design speed. Although the horizontal and vertical alignment will be improved with the proposed design, a design exception will still be required. To a street with adequate capacity to handle anticipated bus and support vehicle traffic. 9. Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users. 10. Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic. 11. Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community. 12. Acquisition of land for hardship or protective purposes, advance land acquisition loans under section 3(b) of the UMT Act. Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition qualify for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. 13. Acquisition and construction of wetland, stream and endangered species mitigation sites. 14. Remedial activities involving the removal, treatment or monitoring of soil or groundwater contamination pursuant to state or federal remediation guidelines. D. Special Project Information: Estimated Costs: Total Construction $ 475,000 Right of Way $ 37,000 Total $ 512,000 Estimated Traffic: Current - 100 Year 2025 - 200 TTST - 1% Dual - 2% Accidents: No accidents were recorded in a check of a recent three-year period. Design Speed & Design Exception: This roadway will be designed as a rural local route with lane, shoulder and guardrail meeting the criteria fora 60-mile per hour design speed. The horizontal curvature meets a 30-mile per hour design speed and the vertical curvature meets a 30-mile per hour design speed. Although the horizontal and vertical alignment will be improved with the proposed design, a design exception will still be required. To r improve beyond the proposed becomes impractical considering topographic and environmental constraints and keeping cost in mind. Functional Classification: Rural Local Route School Busses: There are no school busses currently using this road. Division Office Comments: The Division concurs with the proposed alternate. Bridge Demolition: Bridge 165 is composed entirely timber. Timber can typically be removed without any resulting debris falling into the water. Studied Offsite Detour: There is an acceptable offsite detour present. The majority of traffic near the bridge is local traffic. Traveling from the north end of SR 1376 back to the intersection with SR 1360 takes a similar amount of time no matter which direction is traveled. According to NCDOT Guidelines for Evaluation of Offsite Detours For Bride Replacement Projects a project with a 9-month duration of road closure and an additional travel time of less than 5 minutes is considered an acceptable delay in consideration that there are no mitigating circumstances. Rockingham County Emergency Services and the School Bus Transportation Director for Rockingham County have indicated that an offsite detour is acceptable. Floodplain Elevations: The design of the culvert is such that any impact on floodplain elevations will be minor. 4 ,', , E. Threshold Criteria The following evaluation of threshold criteria must be completed for Type II actions ECOLOGICAL YES NO (1) Will the project have a substantial impact on any unique or important natural resource? X (2) Does the project involve habitat where federally listed endangered or threatened species may occur? X (3) Will the project affect anadromous fish? X (4) If the project involves wetlands, is the amount of permanent and/or temporary wetland taking less than one-tenth (1/10) of an acre and have all practicable measures to avoid and minimize wetland takings been evaluated? X (5) Will the project require the use of U. S. Forest Service lands? ^ X (6) Will the quality of adjacent water resources be adversely impacted by proposed construction activities? X (7) Does the project involve waters classified as Outstanding Water Resources (OWR) and/or High Quality Waters (HQW)? X (8) Will the project require fill in waters of the United States in any of the designated mountain trout counties? X (9) Does the project involve any known underground storage tanks (UST's) or hazardous materials sites? X PERMITS AND COORDINATION YES NO (10) If the project is located within a CAMA county, will the project significantly affect the coastal zone and/or any ^ "Area of Environmental Concern" (AEC)? X (11) Does the project involve Coastal Barrier Resources Act ^ resources? X (12) Will a U. S. Coast Guard permit be required? ^ X (13) Will the project result in the modification of any existing ^ regulatory floodway? X (14) Will the project require any stream relocations or channel changes? X s SOCIAL, ECONOMIC, AND CULTURAL RESOURCES YES NO (15) Will the project induce substantial impacts to planned growth or land use for the area? X (16) Will the project require the relocation of any family or business? X (17) Will the project have a disproportionately high and adverse human health and environmental effect on any minority or low-income population? X (18) If the project involves the acquisition of right of way, is the ^ amount of right of way acquisition considered minor? X (19) Will the project involve any changes in access control? ^ - X (20) Will the project substantially alter the usefulness and/or land use of adjacent property? X (21) Will the project have an adverse effect on permanent local traffic patterns or community cohesiveness? X (22) Is the project included in an approved thoroughfare plan and/or Transportation Improvement Program (and is, ^ therefore, in conformance with the Clean Air Act of 1990)? X (23) Is the project anticipated to cause an increase in traffic volumes? X (24) Will traffic be maintained during construction using existing ^ roads, staged construction, or on-site detours? X (25) If the project is a bridge replacement project, will the bridge be replaced at its existing location (along the existing facility) and will all construction proposed in association with the bridge replacement project be contained on the existing facility? X" (26) Is there substantial controversy on social, economic, or environmental grounds concerning the project? X (27) Is the project consistent with all Federal, State, and local laws ^ relating to the environmental aspects of the project? X (28) Will the project have an "effect" on structures/properties eligible for or listed on the National Register of Historic Places? X (29) Will the project affect any archaeological remains which are important to history or pre-history? X 6 (30) Will the project require the use of Section 4(f) resources (public pazks, recreation lands, wildlife and waterfowl refuges, historic sites, or historic bridges, as defined in Section 4(f) of the U. S. Department of Transportation Act of 1966)? X (31) Will the project result in any conversion of assisted public recreation sites or facilities to non-recreation uses, as defined by Section 6(f) of the Land and Water Conservation Act of 1965, as amended? X (32) Will the project involve construction in, across, or adjacent to a river designated as a component of or proposed for inclusion in the National System of Wild and Scenic Rivers? X F. Additional Documentation Required for Unfavorable Responses in Part E Response to Question 2: Habitat exists for the James spiny mussel although no freshwater mussels were found in a survey. Although the coordination has not been completed yet, a finding of "May affect, not likely to adversely affect" is very likely. There will be no special commitments associated with this issue other than a commitment to follow through with concurrence which will be verified in a construction consultation. Response to Question 25: Bridge No. 165 is located in a tight curve. As proposed, the replacement would yield a slight shift allowing for better skew of the structure and improved curvature while still being considered essentially the same alignment. It falls within the accepted use of a Programmatic Categorical Exclusion. t G. CE Approval TIP Project No. State Project No. W.B.S. No. Federal Project No. B-3900 8.2511301 33336.1.1 BRZ-1376(1) Proiect Description: The purpose of this project is to replace Rockingham County Bridge No. 165 over an unnamed creek. The replacement structure will consist of atwo-barrel (each barrel 8x6 feet) reinforced concrete box culvert on an alignment shifted approximately 20 feet east of the existing alignment. Traffic will be detoured offsite during construction The roadway grade of the new structure will be approximately 9 feet above the existing roadway at this location. Roadwork for the shifted alignment will begin approximately 260 feet to the south of the existing bridge and approximately 470 feet north of the existing bridge. The existing roadway approaches will be widened to provide a minimum 22-foot pavement width with two 11-foot lanes (the actual width may be 2.5 feet wider to accommodate vehiculaz movement.) Six-foot (nine-foot where guardrail is required) grass shoulders will be provided on each side. Cateeorical Exclusion Action Classification• (Check one) TYPE II(A) X TYPE II(B) Approved: 3- -D Date Assistant Man ~l-~/ Date roiect Analysis Branch & Environmental Analysis Branch 3-D ~'~ Date Project Development & Environmental Analysis Branch For Type II(B) proje^cts only: ~ _~ Date ~a John F. Sullivan, III, P.E., Divisi~ Federal Highway Administration PROJECT COMMITMENTS: Rockingham County Bridge No. 165 on SR 1376 Over Tributary to Paw Paw Creek Federal-Aid Project No. BRZ-1376(1) State Project No. 8.2511301 W.B.S. No. 33336.1.1 T.I.P. No. B-3900 NCDOT will obtain concurrence from USFWS and report on this in the construction consultation. Programmatic Categorical Exclusion Green Sheet April 2005 Page1ofl Virginia i - 1384 ~:~ ;Leak - - - - - - ~.1 a ~ .8 Price 1402 ~ 1383 B22U ' ~ .~ 1375 By~ 1514°' 7 1548 ~~ ~y~ 1 1516 1518 v 1 86 w 1346 1348 ~~134511 1361 15~ A 1363 1 1' r 1367 ~~~ ,\O 220 N• b ~~ f 1 $f11iOF1 ' Airport OF l10RT71 ?: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ,~,~. • r PROJECT DEVELOPMENT & ~ ,yfi' ENVIRONMENTAL ANALYSIS BRANCH ROCKINGHAM COUNTY REPLACE BRIDGE 165 ON SR 1376 OVER TRIBUTARY TO PAW PAW CREEK B-3900 Figure 1 MATCH LINE A a- iTONEYILLE POP. 993 1- 1 - - - - 1 1 1 _I 1 f ~ 1 i 1 1 1 f. ~•~V •~ 1 - - -I - s ~ ~. N d w" a. vy ~y~ ~ ~~ u 4., _ > J~{ _• ~ Ww ~. North Carolina Department of Cultural Resources James B. Hunt, Jr., Governor Betty Ray McCain, Secretary January 3, 2000 MEMORANDUM To: William D. Gilmore, P.E., Manager Project Development and Environmental Analysis Branch From: David Brook ~` , i ~~,v~~~l._i Deputy State Histo ~ Preservation Officer Re: Replacement of Bridge No. 165 on SR 1376 over Creek, TIP No. B-3900, Rockingham County, ER 01-7944 Division of Archives and History William S. Price, Jr., Director On November 28, 2000, April Montgomery of our staff met with North Carolina Department of Transportation (NCDOT) staff for a meeting of the minds concerning the above project. She reported our available information on historic architectural and archaeological surveys and resources along with our recommendations. NCDOT provided project area photographs and aerial photographs at the meeting. Based upon our review of the photographs and the information discussed at the meeting, we offer our preliminary comments regarding this project. In terms of historic architectural resources we are aware of no historic structures located within the area of potential effect. We recommend that no historic architectural survey be conducted for this project. There are no known archaeological sites within the proposed project area. Based on our present knowledge of the area, it is unlikely that any archaeological resources which may be eligible for inclusion in the National Register of Historic Places, will be affected by the project construction. We, therefore, recommend that no archaeological investigation be conducted in connection with this project. Having provided this information, we look forward to the receipt of either a Categorical Exclusion or Environmental Assessment, which indicates how NCDOT addressed our comments. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have any questions concerning the above comment, contact Renee Gledhill-Earley, Environmental Review Coordinator, at 919 733-4763. DB:kgc 1(19 Fact 7nnc!c CtrePt • RalPioh Nnrth ~arnlina 77(,(11 _7Rl17 .~ ANC a~ ~~ ~ ti. ~~ y.rl~ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR December 5, 2001 MEMORANDUM TO: Joel Johnson Project Planning Engineer FROM: Lynn Smith, Natural Systems Specialist Natural Systems Unit LYNDO TIPPETT SECRETARY SUBJECT: Replacement of Bridge No. 165 over Paw Paw Creek Tributary in Rockingham County. Federal Aid Project No. BRZ-1376(1), State Project No. 8.2511301, TIP No. B-3900. This report is submitted to assist in the preparation of a Programmatic Categorical Exclusion (PCE) for the subject project. Water resources, biotic resources and jurisdictional issues such as wetlands and federally protected species are included in this report. This project is located in northern Rockingham County (Figure 1). The proposed project consists of replacing Bridge No. 165 on SR 1376 over a tributary to Paw Paw Creek with a double barrel 8-foot by 6-foot reinforced concrete box culvert at approximately the same location and roadway elevation as the existing bridge. Minor roadway alignment changes may be necessary as shown on Figure 2. Traffic will be maintained off-site on existing roads. The existing right-of--way (R/W) is from ditch line to ditch line, and the proposed is 80.0 ft (24.4 m). The existing cross-section is a two-lane bridge with a 19.0 ft (5.8 m) wide deck, 15.0 ft (4.6 m) gravel approach roadway with grass shoulders. The proposed cross-section is a box culvert with 22.0 ft (6.7 m) travelway and 3 ft (0.9 m) gravel offsets on each side. The project length is approximately 750.0 ft (228.6 m). Environmental Commitments Paw Paw Creek tributary is the only surface water present within the project area and flows into the Mayo River approximately 1.5 mi (2.4 km) downstream of the project area. The federally protected species, the James spinymussel does occupy the Mayo River. At this time, there are no site specific environmental commitments. However, it is anticipated that the US Fish and Wildlife Service (USFWS) and the NC Wildlife Resources Commission (NCWRC) will be involved in future project discussions. The NCDOT should use appropriate sediment and erosion control measures to prevent non-point source pollution. All standard guidelines and recommendations apply at this time. Purpose The purpose of this technical report is to inventory, catalog and describe the various natural resources likely to be impacted by the proposed action. This report also attempts to identify and estimate the probable consequences of the anticipated impacts to these resources. Recommendations are made for measures which will minimize resource impacts. These descriptions and estimates are relevant only in the context of existing preliminary design concepts. If design parameters and criteria change, additional field investigations will need to be conducted. Methodology Research was conducted prior to field investigations. Information sources used in this pre-field investigation of the study area include: U.S. Geological Survey (USGS) quadrangle map for Rockingham County (Price, NC, 1964), Geographical Information Systems (NC Center for Geographical Information & Analysis), USFWS, Natural Resources Conservation Service (MRCS, formerly the Soil Conservation Service) soil maps and NCDOT aerial photographs of project azea (1:1200). Water resource information was obtained from publications of the Department of Environment and Natural Resources, DENR Internet Page 2001 and from the NC Center for Geographic Information and Analysis (Environmental Sensitivity Base Map of Rockingham County, 1995). Information concerning the occurrence of federal and state protected species in the study area was gathered from the USFWS list of protected species (February 26, 2001) and species of concern, and the NC Natural Heritage Program (NCNHP) database of rare species and unique habitats. General field surveys were conducted along the proposed alignment by NCDOT biologists Lynn Smith and Karen M. Lynch on 17 May 2001. Plant communities and their associated wildlife were identified and recorded. Wildlife identification involved using one or more of the following observation techniques: active searching and capture, visual observations (binoculazs), and identifying chazacteristic signs of wildlife (sounds, scat, tracks and burrows). Jurisdictional wetland determinations were performed utilizing delineation criteria prescribed in the "Corps of Engineers Wetland Delineation Manual" (Environmental Laboratory, 1987). Jurisdictional surface water determinations were performed using guidance provided by NC Division of Water Quality (DWQ),"Field Location of Streams, Ditches, and Ponding" (NCDENR-DWQ, 1997). Definitions Definitions for aerial descriptions used in this report are as follows: Project Study Area denotes the area bounded by proposed construction limits; Project Vicinity describes an area extending 0.5 mi (0.8 km) on all sides of the project study azea; and Project Region is equivalent to an area represented by a 7.5 minute USGS quadrangle map with the project occupying the central position. -2- PHYSICAL RESOURCES Soil and water resources, which occur in the study area, are discussed below. Soils and availability of water directly influence composition and distribution of flora and fauna in any biotic community. The project study area ties within the Piedmont physiographic region in the north-central part of North Carolina. The topography in this section of Rockingham County is gently rolling. The study area is comprised mostly of forested area with few residential homes. Project elevation is approximately 740.0 ft (225.6 m) above mean sea level (msl). Soils There are two soil map units, associated with the Madison Series, occurring within the project boundaries. Table 1 lists physical descriptions of the individual soils. Table 1. Soils within the Project Study Area Soil ype' Slope ~iydric Classification Hazard Description MaE, Madison 15-35% Non-hydric _ Erosion, This is swell-drained soil on narrow side slopes. sandy loam Runoff Surface runoff is rapid. Permeability and available water capacity are moderate. MaD, Madison 8-15% Non-hydric Erosion, This soil is found on convex side slopes and narrow sandy loam Runoff ridges and has the same characteristics as MaE. Water Resources This section contains information concerning those water resources, if present, likely to be impacted by the project. Water resource information encompasses physical aspects of the resource, its relationship to major water systems, Best Usage Standards and water quality of the resources. Probable impacts to these water bodies are also discussed, as aze means to minimize impacts. _ One stream, an unnamed tributary (Ut) to Paw Paw Creek, will be directly impacted by the proposed project (Figure 2). This tributary to Paw Paw Creek is located in sub-basin 03-02- 02 of the Roanoke River Basin and flows into the Mayo River approximately 1.5 mi (2.4 km) downstream of the project azea. Within the project vicinity, the channel of this tributary is approximately 20.0 ft (6.1 m) wide and has an average depth of 5.0 ft (1.5 m). On the day of the site visit, the streamflow was swift and measured approximately 6.0 ft (1.8 m) wide and 3.0 ft (0.9 m) deep. The substrate is composed of bedrock, cobble, sand and silt. Streams are assigned a best usage classification by the DWQ. The classification of Paw Paw Creek [Index no. 22-30-6-(2)] is WS-IV. Unnamed tributaries receive the same best usage classification as the named streams into which they flow. Therefore, the classification of Paw Paw Creek tributary at Bridge No. 165 is WS-IV. "WS-IV" classification denotes waters used as sources of water supply for drinking, culinary, or food processing purposes for those users -3- ~~ d ~' ~ a 1'~ ' 8 ~ 1383 R ~ Price ~ 1402 ~~ 1358 ~ ~ 1503 ~ ,-.. .7 __- 3 51 : -- _ 1 Bridge No. 165 ,~ . '~, ' , 385 _. , t~%- _ ~ .-• ~ . ~ •cP N 2 G . - , ~ ,• 1360 p ~ ~ ~ i 1359 ~ ~' • ?,• ' -~ . 1382 ! . -. ,.._..---< , •-•--.. ~~•,• 6ut~% ~ 156 ~ . , _ _..• - 1504 • ~ 1508 ~ 1355 _ ~ ~~ '~. '_ ._.._ .. - 1 ~ '~ ~ !. _ 1376 , g ''~ `-. . `• 2`2 . J ~-~~.G{~~--~' .•' 1350 1349 ' ' _ _..,-•_;. / ~ 1509 • S • / ~ • 2 /•. ~ / 1360 ... - •- _ - -• • ~ ~ •~ •- ~ 151 1348 ~ , ~p t516 `•. • 2 _ ---- ~.. ' ~ ~ %^~~`.._.. 1361 ~ 1. 1360 ~ ... ~ • g p 1351 `~ 6 •~• 1518 ~ 151 3 1396 • • L 1347 1348 ; -. 1362 , q ~ ` i ! ~ 3 ~ . . ..~. _. ' ' h 1361 ~ % 1519 ' Q / _..~ -• ' • •. ~ •`.•~`~ 2 1386 ~ ~ 1363 `~ ~ STONEVILLE .9 • ,... •: 1346 1364 ' POP. 1,116 `. ' O 1348 1345 1344 1406 • 4 . 7 0) . '`. _••~ _ - ' F . `~ . 4 • 4 1365 '~ _ ` 1328 w . ••~' 1 1344 •U1 . •Q ~ i • /• -•-••-••. • 3 1395 1342 1367 "~ •.~ ~ ~ ... raj '•1387 ~.•\ ~ • v p ~7 ~~`~ ' ~ • ~. ~. _~ ~ ~ - N • y • `•. 133 A; 1332 ~ 220 ,•' ~ 1325 `i ~ . ~` •` •' 1300 1329'`-. _.._ ~.: '''.. 1395 ~~- ~ `. 1340 ' :' ~ :~ North Carolina Department of Transportation Division of Highvv~ays Project Development & Environmental Analysis Branch a ROCkIOg~latll COUnry Replace Bridge No. 165 on SR 1376 Over Creek B-3900 SCALE: l is = 1 mi Figure 1 t w A A" ~ -1 c'id * ' L -' '~ C ~• ' ''ti~ '*. v ,} ~` ~y .~ i ,~' M1•' .~ .• S, ~ ~ 4~r ~ 4 ~ v '~'N ~~~ z~ °` s' ~ ~ ~ Y ~ :'_. `~a ~; ti, ' ~ .~~ • ~ ~ ~'~e •~ ~ ~ r, ''f~i ; ~x ~ ~ S''~ N t g A~~ wS s J~` .rye ', ~~ `4 I ~ 1., ~_ i +~+~ K}N ~ . I 1 ~ • ~ f F~~~..ap w ~. 1 lt' V ~ •• . ~ n • ~• P ~ ~ . ~~; Y~ aD w ~ y~ h ~ _'~, ~' ~ e * T ,~. ~ .~ ~,. ~~, _'X ~~~' ~ ~,~ tea. ~,~ ~ ~.. ~ r .q~.. T 9~ ,5, ~' - ~ ~ e ~ a ~ ~R ~ ti V ~ ~.. ' ~ a ~' +Yy ~ H P ~ 'I~w ry ' ..r=.N '' ;`\ t' d VJI"' 4,^~Y+ R Vii. N~, 3's~N,.n :~•h ~h, ;~ ~e A. ~'it'f• .'~~ ~~ .vim! ~ ~i ~~ h '7,'• 16$~tG2`' ~ dE~ 'Y `'7 ~ ; ..... ., . N ~+f ~ y 7 J • /,]. Z •.~ .. ,~~ ~ ;~ ~ .~ .~r ~ ~~~ - ~~ tea. .~,~~.~~,~z •, (5 * ~ 5'1 f`J ~. i 1 ~~brt i-~[~ ~~~~ ih .~7 ~I~r~,~^ '~5~~ ~~~ R~~3~ ~i ,~ ~ ~, '3i' `vim y .r ~, t ~wtt mot,. ./y ~_ ~ ~.~,. c i T :. ~ ~~ ~. .. •, .,. .. :~~ ~ .. .. i'~ ' ~ ~•. + Nr , e „° • .~ ~ ~ z ~'•: hA ;~} r~ , ~ .'~ •.~:c ' ~.~ f^x;' ~\ ` S~' 'y'1~~~Gy,` \ ~ .. v r' ;yy.. J f 1 ~ k~: ~. .. *~ , '~ ~,` . ~.. , •7 ~~ .~` l ~ ~= ,.: F:' ~~ h '"'~` f ~' ~l i ~ ~ \~ XA 1 • ,. l~ ~1 R ~ 1 .T ~ ~ L \ ~v.~LMI"' ! \ .. ~ f'~'.. y~ r n .. '- +=:; _ ': red . ~ .. . ~ ~'~ _ u ~ t "*.. ~ t~ < t +:- ~r a .~, ,~ Y4 J~ i°;. ~. ~ ti` l i. \+`,!f' L~ yea • A, 3 q~ ~. r ~, .~' ~ ~ ~, ~ F , ~ ~ .a •_ • w ,o I ~ ~~' it ,~~ ~r_ +w, 1~1':. ~ ~~: „ ~ v .~+'~~~ ~ a ~ /b .i ~~I r. k T~' urG~S~ :!~ .. • ~~ ' ~. w .: ~•: ~.1 .a .. -L. ~ S~ ~1e +_~ .~~ ~... ~ b ,N$ 'Q V ~ ' i~nQN_ _. ~aC A 'b ~ ~ O 'S A p f~ ~ <. C •.~ ~ Q Q L:. H w G u ry ~ OQ rn d ~ C O ~~` o ~y p7A x^ y Id A ~ ~ '~] 0 ~ O ~ o a D _ H + ~ _ V] `C R° C~7 ~~) J: ~ _.~./ 1~ a ~ g ~ W o ° L ~ A L7 Fh { ~} ; .+` _; t 1 I r 1, 1 e. ;., ~P., ~` ~, M M-:i ~; ~ ~~ f 4,.N ~~: ~~ n c'~ n,~. ` .! n1 \ ti < ,^~ ,f ~r~,v~>` .; ~ M h j~n:~i s i~.~` ' h r2 yY i ~~(~ i ;; ]~ 3 ,l ~h where a WS-I, II or III classification is not feasible. WS-IV waters are generally in moderately to highly developed watersheds or protected areas. Point source dischargers of treated wastewater are permitted pursuant to rules .0104 and .0211 of 15A NCAC 2B .0100; local programs to control nonpoint source and stormwater discharge of pollution are required; suitable for all Class C uses. The "C" classification denotes freshwaters suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation and agriculture. A Protected Water Supply Watershed lies approximately 0.4 mi (0.6 km) (stream channel distance) downstream of Bridge No. 165. Protected areas are only located within WS-IV watersheds. A protected area is defined as land within five miles and draining to the normal pool elevation of water supplies, or within ten miles upstream and draining to a river intake. Neither High Quality Waters (HQW), Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately undeveloped watersheds) nor Outstanding Resource Waters (ORW) occur within 1.0 mile (1.6 km) of project study area. The DWQ has initiated a whole basin approach to water quality management for the 17' river basins within the state. The basinwide approach allows for more intensive sampling of biological, chemical and physical data that can be used in basinwide assessment and planning. Benthic macroinvertebrates are intensively sampled for specific river basins. Benthic macroinvertebrates have proven to be a good indicator of water quality because they are sensitive to subtle changes in water quality, have a relatively long life cycle, are nonmobile (compared to fish) and are extremely diverse. The overall species richness and presence of indicator organisms help to assess the health of streams and rivers. All basins are reassessed every five years to detect changes in water quality and to facilitate National Pollution Discharge Elimination System (NPDES) permit review. There are not any biological sampling sites located within 1.0 mi (1.6 km) of Bridge No. 165. One Basin Fish Community Assessment Site is located within 2.0 mi (3.2 km) of Bridge No. 165. This site (F-1) is located at the intersection of Paw Paw Creek and SR 1360. Fish tissue samples were last collected August 3, 1990 and received a North Carolina Index of Biotic Integrity (NCIBI) rating of Good. The NCIBI incorporates information about species richness and composition, trophic composition, fish abundance and fish condition and summarizes the effects of all classes of factors influencing aquatic faunal communities. Paw Paw Creek had a very diverse fish population with 26 species. This site had good habitat as evidenced by the number of darter species and sunfish species. The percentage of omnivorous species was elevated suggesting that there is some evidence of moderate nutrient enrichment at this site. Point source dischargers located throughout North Carolina are permitted through the NPDES Program. Any discharger is required to register for a permit. There are no permitted dischargers located within 1.0 mi (1.6 km) of Bridge No. 165. Nonpoint source discharge refers to runoff that enters surface waters through stormwater or snowmelt. Agricultural activities may serve as a source for various forms of nonpoint source pollutants. Land clearing and plowing disturb soils to a degree where they are susceptible to erosion, which can lead to sedimentation in streams. Sediment is the most widespread cause of -6- nonpoint source pollution in North Carolina. Pesticides, chemical fertilizers, and land application of animal wastes can be transported via runoff to receiving streams and potentially elevate concentrations of toxic compounds and nutrients. Animal wastes can also be a source of bacterial contamination and can elevate biochemical oxygen demand (BOD). Drainage ditches on poorly drained soils enhance the transportation of stormwater into surface waters (NCDEHNR-DEM, 1993). BIOTIC RESOURCES Biotic resources include aquatic and terrestrial ecosystems. This section describes those ecosystems encountered in the study area, as well as, the relationships between fauna and flora within these ecosystems. Composition and distribution of biotic communities throughout the project area are reflective of topography, hydrologic influences and past and present land uses in the study area. Descriptions of the terrestrial systems are presented in the context of plant community classifications and follow descriptions presented by Schafale and Weakley (1990) where possible. Dominant flora and fauna observed, or likely to occur, in each community are described and discussed. Scientific nomenclature and common names (when applicable) are provided for each animal and plant species described. Plant taxonomy generally follows Radford, et al. (1968). Animal taxonomy follows Martof, et al. (1980), Menhinick (1991), Potter, et al. (1980) and Webster, et al. (1985). Subsequent references to the same organism will include the common name only. Fauna observed during the site visit are denoted with an asterisk (*). Published range distributions and habitat analysis are used in estimating fauna expected to be present within the project area. Three communities are found in the project study area: Maintained/Disturbed, Mixed Pine/Hardwood Forest and Piedmont/Low Mountain Alluvial Forest. Community boundaries within the study areas are well defined without a significant transition zone between them, and terrestrial faunal species likely to occur within the study area will exploit all communities for shelter and foraging opportunities or as movement corridors. The maintained disturbed community occurs along the shoulder of SR 1376. Significant soil disturbance and compaction, along with frequent mowing or herbicide application, keep this community in an early successional state. Road shoulders act as buffers between the roadway and surrounding communities by filtering stormwater runoff and reducing runoff velocities. The width of the road shoulder is approximately 15.0 ft (4.6 m). Vegetation occurring along the road shoulder and less maintained areas adjacent to the road shoulder includes various grasses, wing stem (Verbesina occidentalis), winged sumac (Rhus copallina), ragweed (Ambrosia sp.), sour grass (Rumex acetosella), milkweed (Asclepias sp.), aster (Aster sp.), wild onion (Allium canadense), vetch (Vicia sp.), wild geranium (Geranium carolinianum), panic grass (Dicanthelium sp.), Queen Anne's Lace (Daucus carota), daisy (Chrysanthemum leucanthemum), Christmas fern (Polystichum acrostichoides), green and gold (Chrysogonum virginianum), fire pink (Silene virginica), reindeer moss (Cladonia evansii), grape (Vitis sp.), poison ivy (Toxicodendron radicans), -7- blackberry (Rubus sp.), Virginia creeper (Parthenocissusquipquefolia) and coral honeysuckle (Lonicera sempervirens). The Mixed Pine/Hardwood Forest occupies the four corners of the existing bridge. This community is adjacent to the alluvial forest and proceeds upslope and is extensive along SR 1376. The canopy is composed primarily of American beech (Fagus grandifolia), ironwood (Carpinus caroliniana), hickory (Carya sp.), Virginia pine (Pinus virginiana), red maple (Ater rubrum), tulip tree (Liriodendron tulipifera ), eastern red cedar (Juniperus virginiana), black gum (Nyssa sylvatica), black walnut (Juglans nigra) and sourwood (Oxydendrum arboreum). The shrub layer consists of big leaf snowbell (Styrax grandifolia), black cherry (Prunus serotina), hazelnut (Corylus americana), witch-hazel (Hamamelis virginiana), flowering dogwood (Corpus jlorida), redbud (Cercis canadensis), spicebush (Lindera benzoin) and maple leaf viburnum (Viburnum acerifolium). The herbaceous and vine layers consists of bellwort (Uvularia sessifolia), bedstraw (Galium sp.), rattlesnake plantain (Goodyera pubescens), rattlesnake fern (Botrychium virginianum), running cedar (Lycopodium jlabelliforme), wild yam (Dioscorea villosa), Virginia creeper and Japanese honeysuckle (Lonicera japonica). The Piedmont/Low Mountain Alluvial Forest (Piedmont) is present adjacent to the creek, along the northeast, northwest and southwest corners of the existing bridge. This community is more extensive along the west side of SR 1376. Within the southwest quadrant the alluvial forest reaches down into the creek channel. The canopy and shrub layers are composed of ironwood, red maple, flowering and silky dogwood (C. amomun), saplings of pine and red cedar, maple leaf viburnum, blueberry (Vaccinium sp.) and black haw (Viburnum. prunifolium). The herbaceous layer consists of Jack-in-the-pulpit (Arisaema triphyllum), rattlesnake fern, Christmas fern, sensitive fern (Onoclea sensibilis), New York ironweed (Vernonia sp.), Joe-pye-weed (Eupatorium fistulosum), lousewort (Pedicularis sp.), bedstraw, bellwort, mock strawberry (Duchesnea indica), may-apple (Podophyllum peltatum), yellow root (Xanthorhiza simplicissima), windflower (Anemone quinquefolia), skullcap (Scutellaria serrata), Japanese grass (Microstegium vimineum), jewel-weed (Impatiens capensis), wild yam and Virginia creeper. Wildlife associated with the communities present within the project vicinity include: white-tailed deer* (Odocoileus virginianus), eastem mole (Scalopus aquaticus), opossum (Didelphis virginiana), muskrat (Ondatra zibethicus), gray squirrel (Sciurus carolinensis), raccoon (Procyon lotor) and American toad* (Bufo americanus). Avian species utilizing the project vicinity include: tufted titmouse* (Parus bicolor), red- eyed vireo* (Vireo olivaceus), mourning dove* (Zenaida macroura), blue-gray gnatcatcher* (Polioptila caerulea), ovenbird* (Seiurus aurocapillus) and Louisiana waterthrush* (Seiurus motacilla). Summary of Anticipated Impacts Construction of the subject project will have various impacts on the biotic resources described. Any construction related activities in or near these resources have the potential to impact biological functions. This section quantifies and qualifies impacts to the natural -8- r resources in terms of area impacted and ecosystems affected. Temporary and permanent impacts are considered here as well. Calculated impacts to terrestrial resources reflect the relative abundance of the community present within the study area. Project construction will result in clearing and degradation of portions of this community. The project lies in a rural area consisting of natural forest communities and maintained/disturbed road shoulders. Table 2 summarizes potential quantitative losses to biotic communities, resulting from project construction. Estimated impacts are derived using the entire proposed R/W width of 80.0 ft (24.4 m). The gravel road has been excluded from the impact calculations. Table 2. Anticipated Impacts to Biotic Communities COM1ViUNITY ALTERNATE 1 Maintained/Disturbed 0.53 (0.21) Mixed Pine/Hardwood Forest 0.54 (0.22) Piedmont Alluvial Forest 0.14 (0.06) TOTAL: 1.21 (0.49) ivote: values cited are in acres (hectares). Plant communities found within the proposed project area serve as nesting and sheltering habitat for various wildlife. However, due to the size and scope of this project, it is anticipated that impacts to fauna will be minimal. Areas modified by construction (but not paved) will become road shoulders and early successional habitat. Reduced habitat will displace some wildlife further from the roadway while attracting other wildlife by the creation of more eazly successional habitat. Animals temporarily displaced by construction activities will repopulate areas suitable for the species. Bridge Demolition Bridge No. 165 is composed of a timber deck with asphalt wearing surface on timber joist. The substructure is composed of timber caps and timber piles. Therefore, Bridge No. 165 will be removed without dropping components into Waters of the United States. This project falls under Case 3 (Bridge Demolition and Removal Policy, dated 9-20-99) where there are no special restrictions other than those outlined in Best Management Practices for Protection of Surface Waters. JURISDICTIONAL TOPICS This section provides descriptions, inventories and impact analysis pertinent to two important issues--Waters of the United States and rare and protected species. Surface Waters and Wetlands Surface waters and wetlands fall under the broad category of "Waters of the United States," as defined in Section 33 of the Code of Federal Register (CFR) Part 328.3. Wetlands, defined in 33 CFR 328.3, are those areas that are inundated or saturated by surface or ground -9- _ ~- water at a frequency and duration sufficient to support, and under normal circumstances do support, a prevalence of vegetation typically adapted to life in saturated conditions. Any action that proposes to place fill into these areas falls under the jurisdiction of the U.S. Army Corps of Engineers (USAGE) under Section 404 of the Clean Water Act (33 U.S.C. 1344). Potential wetland communities were investigated pursuant to the 1987 "Corps of Engineers Wetland Delineation Manual". The three parameter approach is used where hydric soils, hydrophytic vegetation and prescribed hydrologic characteristics must all be present for an area to be considered a wetland. Wetlands are not present within the project study area. Paw Paw Creek tributary is the only jurisdictional surface water, under Section 404 of the Clean Water Act (33 U.S.C. 1344), present within the project study area. Discussion of the biological, physical and water quality aspects of these streams are presented in previous sections of this report. Permits Impacts to jurisdictional surface waters are anticipated. In accordance with provisions of section 404 of the Clean Water Act (33 U.S.C. 1344), a permit will be required from the USAGE for the discharge of dredged or fill material into "Waters of the United States". A Section 404 Nationwide Permit 33 CFR 330.5(a) (23) is likely to be applicable for all impacts to Waters of the United States from the proposed project. This permit authorizes activities undertaken, assisted, authorized, regulated, funded or financed in whole, or part, by another Federal agency or department where that agency or department has determined that pursuant to the council on environmental quality regulation for implementing the procedural provisions of the National Environmental Policy Act; (1) that the activity, work, or discharge is categorically excluded from environmental documentation because it is included within a category of actions which neither individually nor cumulatively have a significant effect on the human environment, and; (2) that the office of the Chief of Engineers has been furnished notice of the agency' or department's application for the categorical exclusion and concurs with that determination. A North Carolina Division of Water Quality (DWQ) Section 401 Water Quality Certification is required prior to the issuance of the section 404 permit. Section 401 of the Clean Water Act requires that the state issue or deny water certification for any federally permitted or licensed activity that may result in a discharge to Waters of the U.S. Federally-Protected Species Some populations of fauna and flora have been in, or are in, the process of decline either due to natural forces or their inability to coexist with human activities. Federal law (under the provisions of the Endangered Species Act of 1973, as amended requires that any action, likely to adversely affect a species classified as federally-protected, be subject to review by the USFWS. Other species may receive additional protection under separate state laws. -10- Plants and animals with federal classifications of Endangered (E), Threatened (T), Proposed Endangered (PE) and Proposed Threatened (PT) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973, as amended. As of February 26, 2001, the USFWS lists two federally-protected species for Rockingham County. Table 3. Federally-Protected Species for Rockingham County Scient~r Name Common 1Vame Status Pleurobema collina James spinymussel Endangered Echinacea laevigata Smooth coneflower Endangered Endangered - A taxon "which is in danger of extinction throughout all or a significant portion of its range" (Endangered Species Act, Section 3). Echinacea laevigata (smooth coneflower) Endangered Plant Family: Asteraceae Federally Listed: December 9, 1991 PE Flowers Present: June -early July Distribution in N.C.: Durham, Granville, Orange, Rockingham Smooth coneflower is a perennial herb that grows from simple or branched rhizomes. This herb has a smooth stem and few leaves. The basal leaves are the largest, and these leaves are smooth to slightly rough, tapered to the base and elliptical to broadly lanceolate. Mid-stem leaves have short or no petioles and are smaller than the basal leaves. Flowers are light pink to purplish in color and solitary. The petal-like rays usually droop. Fruits are gray-brown, oblong- prismatic and four-angled. Habitat for the smooth coneflower is found in areas of meadows, open woodlands, glades, cedar barrens, roadsides, power line rights-of--way, clearcuts, and dry limestone bluffs. Plants usually grow in soil derived from calcareous parent material. North Carolina populations are found in soils derived from Diabase, a circumneutral igneous rock. Optimal sites are in areas with abundant sunlight and little competition from other herbaceous plants. BIOLOGICAL CONCLUSION NO EFFECT Suitable habitat for smooth coneflower is present within the road shoulder portions of the project study area. A plant by plant survey for smooth coneflower, within the road shoulder area, was conducted on 17 May 2001 by NCDOT biologists Karen M. Lynch and Lynn Smith. No specimens were found during the survey. Furthermore, a review of the NC Natural Heritage Program database of rare species and unique habitats on November 1, 2001 revealed that no known occurrences of smooth coneflower occur within 1.0 mi (1.6 km) of the project study area. Therefore, project construction will not affect smooth coneflower. -11- .. - y Pleurobema collina (James spinymussel) Endangered Animal Family: Unionidae Date Listed: July 22, 1988 A description and biological conclusion for the James spinymussel is not available at this time. As soon as this information is available, it will be provided in a separate memorandum. Federal Species of Concern and State Listed Species There is one Federal Species of Concern (FSC) listed for Rockingham County. Federal Species of Concern are not afforded federal protection under the ESA and are not subject to any of its provisions, including Section 7, until they are formally proposed or listed as Threatened or Endangered. Federal Species of Concern aze defined as those species which may or may not be listed in the future. These species were formally candidate species, or species under consideration for listing for which there was insufficient information to support a listing of Endangered, Threatened, Proposed Endangered and Proposed Threatened. Organisms which are listed as Endangered (E), Threatened (T), Significantly Rare (SR) or Special Concern (SC) by the North Carolina Natural Heritage Program (NCNHP) list of rare plant and animal species are afforded state protection under the State Endangered Species Act and the North Carolina Plant Protection and Conservation Act of 1979. Heller's trefoil (Lotus helleri) is the only Federal Candidate and State listed species listed for Rockingham County. The species' state status is as "Candidate" species. Candidate species are very rare in North Cazolina generally due to habitat destruction. These species are also either rare throughout their ranges or disjunct in North Carolina from a main range in a different part of the country or world. Also included are species which may have 20-50 populations in North Carolina, but fewer than 50 populations rangewide. If present land use trends continue, candidate species are likely to merit listing as Endangered or Threatened. Suitable habitat for Heller_'s trefoil does exist in the study area. This data is provided for information purposes as the status of this species may be upgraded in the future. A review of the NCNHP database of rare species and unique habitats on November 1, 2001 revealed no records of North Carolina raze and/or protected species in or near the project study area. A survey for this species was not conducted during the site visit, nor was the species observed. Please contact me at (919) 733-7844 extension 286 if you have any further questions regarding this project. cc: Randy Turner, Natural Systems Unit Head File B-3900 -12- \ \ 5.0 V!. S IZr ~ ~ W Z ~~ ~~W m '<Z W a W = ~~ M_ O Wa 6 N 0 0~ J / o~ m / m 56/Ll/B 9 \ e. \ S9 s 0 e ~; ~, ~~ 10 /16~'~ /^ ~ / 0m ,1 i ,~~m' ~w e5~ Z~ a `" w ~~w 'J-'3 w N ~... w d J F m ~ < w 160 100 N Z 3 W Q / / t-J O~ O J Z ~ 1°jy0 WLL w~ O 755 0 e-~/ ~ g M ~~ m i W J U ~~ ~~ ~' U U h ~ ~ W v N N I ~n '1650 ~~ m ~~/ JIr/ m 0ms d'~6 B. 00 ° m ~ J r'. ~9 S, '~ / m ~J• m ` ~ ~ ~ ~, /// J 0 m 0m~. Q` ~ ~ ~ G// Uv 2 ~ m /~91~: ~ mm~ ~ pm ~ ~ ^ ~ U~1 m N B ///I ~ ~ ' m v J m 0 6 ~ \ / ~0 m m ~ ~ m s ~e ~ ~~ ~~ ~ /I / N ~ I -//~\ /^ ^ ~ m v 6 tae ~~ \ ~9p 8¢Se ~ ~m / m ^^m ~/ m v ~ ~ 825.0 g30 SP, \ s6 ~ ~ y e. ~. e6! S~ a~ a. ~ ~ ~ 6 s~ z~ ~ m zs a / ~ dam ~. 1000 ^~m m// 1~5 1~m ~` / 1°j0/ 1^ m m~ ~ m/ ~ ~A Pte. 1P em ~0 m/ h 1~ . V f ~ i'le / 11 j ~ / $000 p0m / 100 0 / m 0 / 1P 1Q ^Qh 1100 ~. // fl00 / z m/ 00 m~ 0 W / ~ / ^ /11 ^~ ~~• 0 0 100 0 ~ 1q5• / 1g0• 0/1 0m/~ ~~ 1 5 / 795.0 '190 / 10 110 bhm ~ X00 4)mm 790 '1850 / x~ //' / 0 / 0 1 785.0--/ 100 110• 10 i / m 110 / W~ 0 e ~ / ~780/ / 165 ~ y yp~?;~ ~ \ / 0// / © m0 ^ e. 6~ 7750 / 16/ m S~ m'- / c © ro ~ 10 o Gi Ph. ~~ m ~ m ~ m 00 m ^m m 1q5~ f ^ ~~ j 6 vi m °~ Er m m ~ ~ ~' / ~ a fl// ^ ^m ZZ pm W 6 / f m I ~ /s ~~ J ~'• ~h % ~ / ~m / m I// h ~~ m m `~' / 45.0 ~ e e 9S e 8/e B fl20~~~~ BSS °\ ~\ 9~. / h ~ / / ,cn° Im ~ A ~ ~ J e ~ eesp Sew _ 515.0 B\\\,\ \.\ Sp 0 m N `° p ~ ~ : ~ ~ ~ a ~ 6 \` 9 \ 8pS 805.0 ©; 'e 65.0 m ~ 9S 'per--"~ SA ~~ Q •e ' '8 \ \ ~--~ I N .4 ~ mv' •y a e \ ~795.0~ BB~-810 ~~ o in ~ m .,, ~ 79S. \ Pe A ^ m m°j Qn -~ 0 9 m ~80 ~ J ~~ ~ N 790 7q0~\ I J_ / , a.\O , e ~/7fl5.0 ,4\>95~LT0 795 "~ ytl~ ~ y v ~ me \ 785.0 g! ~ 8 >90 -7 0 ~ 5 r~ / >, ~7 ~--780>80 '2- 7 5,0 760 I 80 ~ ~-~775.0~/^77~~~--- 6~7 ~ m" N >6S0\~-\ 70_770 7 ~960L~~-0 ~OCI ~ ^~ ^m ^6 m , / .i_, / bL \\ 9 >60~~ `765.0 0 7_~!~ 00LL 0•y.~--OL~~OBC m m ,~ ~ ^`° ^0m 1a G \~.. ~~, C, \755.0 76~--1755- 05ct^L00 ~~L ~~~~ 08~0.58L 0b~i ~ 750-05 0.5yL 9 / ui m 0•ybL ~... 0 ..ESL--~ ~~'0'~08C 058L/\0~9 f 0bL 06L 06L~ //~~Gi~ 0S< __/- 0.55 L /p L I 0 ~' j , N m m ui ~ yL 9L LL--~~ 0L~0 O'S6L cab ~ °~ m ~ ~cmo~ ` m~iG'~ OgL~ O'99L L/0~'96/~~mm// _--~~0'S6L '~' /0 n n^ ~ J-o °0 /~0C / 0 ~gl. ~0e0~o0~----008 / ~ O v \ -' C 091.~9C 0L~~5CC / 00b,o~ ~ \/ m0 O'S0B-` 00g-~iy0~ 000 + 4 ~ \ 6 / L / m9C / ~~i m ~ 0 JCOg ~ /` r C y0 018-~~ 8 /yi`' m m m m p> 0 v J / 0~ L C~06a ////~0 0~ 0I \\0'508/~a si m r m r ~ m P in a~ \ m~ tip' 00 / e~// / ~. 0.5I8 ~ m © r ~ Nn ~ _ m 0 b/ 0 ~ / 00 ~ -_0 OlB~ / ~, ~ ps u-~ ~ • F / ~ m I SLe\ G~o •U ~ £! 0 J / ,~ a . ~ 0`' m w ~' / 028 \0 /\ m ~ m~ d ~ m 06 C m m mti0 028' G,60 /0~9~ m m /N. ~ ~ s e a gy/m. ~ 'dQ m /~bC 000 m 0~5Z8v a~0 0v m "' /I cn v e 0 ~ 0~ N ~ r r ~ 1 0 V .y ~ ~ 0 ~ 2 ~ W * . ; ~ mom' `` ~~ m m \\ & S p g`79 \ ~ m / / m ~~ r r s ° ~ ~ o ^~___. 0 ~ e7sp 6 6 cn~ ~ e ~ ~s 8 9 S0 6e N/ m ~7 m W e 's me p' e0~ 'e m s ° ' ~ > S 795.0 mm ~ /ti0 0 ~;i ~~0 m o- ~ We ~ e ~S >6 \ ), S ~ 795.0 X790 ym~ m`~ m m'l,0 /~4,~", `4l0 n 9 ) •8 9 > S0 ~ ~ >8 .. 790 _790 ` •N m / ~/ ~ \ ~ ~ 'B , ~\ 6S\>> p 78S. 95.0 ~rn~' m / e m 0 m S0 75S. >60 0 0 7 'y ~ mro 'L0 m S try 10 > 0 ~ 7~> m e m ~ ~° ~~ S 80 m m ~ / m 0 7gS0 750/-~_\\\ .p\~17g0`~] ~6 ~~. 0'b \ ~~ ti 745/ ~ s r~ vL `/j~7~\>>~~SpSp >,0\ 775.0 m/ .~~ ~00 m ~ ~\~~A A ~H \8 5. (/~ ~ 735.0 I ~ /~0 ~"~------055L~~0yC ~ >6 >6S0 7j0 ~` m~ ~ m e er' ~~Se ~8a0 05 0'y ~\ > 0 w e ~0•y~9L 0LL 95,9 ~ ~(? \~~ ~ Pe 'e \\ BSe 9 ~0.5LL ~\ \ >60 ~S~ e ~ g \ 8 /~~OBL ps 6~ ~\\1l .e ~ ~ s gee \\ S2p 2g0~ 830 \ 9 '8 O , ~098< !\ pss >S \ ~ ~sg /e S/S9 \ 85.0 /~06L 98!\59 ! ~\ 'L. >se >>p e e \\S 8~© 82 l 0~0• 9\0g~ 0.55 ~ 63. m \ \g 9S\8I\ e15.p ~- ~pee6! ea! s \~--09L `. ~\ 9 ~9S09e\\~\ \eto~_~ spg\ ~ ~~L ~ e. s ~ '\ ° e ~ \ga9-`_-~ 805.0 I e.~~ 0 S<C S9` e dA \\ 795.0 800~~/ e S 9 8 ~~~/~ ! `r 6P'3 S d-P 4 9 Peo~soctnc apfiy~u 9~e 95Ag 0.56L 96! Sa! 08~ OS~t 0 9 ~e >>50 >80~ 785.0 785.4 p !! 0.5g \ 780 780 SNOlSIA3N 775. 775.0 0 w x ~~ a ~ ~ ~ r, ~ ~ w~ ~~ 0 ~~ V ~~ ~~ ~ ,-, o 'aC A ~ ~ a Z a ~3 ~Q ~ xa a ~~ ~~ _ o ~ A~ ~~ ~y 3 " -~ ~+ ~ ~ O ~ W V ~ a o ~ 0 QQ~ C Y' N v1 O C O x ~ a~ ~ ~~ ~~ ~~ ~ ~ ~~ a M N U 0 a w °o y O N ~ ~ N. 6 W. RY,-_ cal o \ m 1 n~ ~ ~ y \ ~ ~ n NI ,~ ~ r W \ AI f~l I AI ~ m O l \ tOl ~~ - ~~ o ~` ~ 4 y ;l NI ~ ~ - m W ~.{~ jp U 1) `O~ ~ OI m ~ ~~ Alq Yp ~ ~ ~~~ i 0 a w U 0 ~' w ~ p0. 1 ~I, ~4 ~ '' A ~' r~ _J ~~ a~ F z~ zg ~a ~F Z a° wg a ~ ti~°~ , Jyi i i~ ,`Oi ~ ~i s 3~ ~. 3~ .~ ~~ a~, ~;. Og£~ S O 1 006£-5 =~Z~~~a2ld dI~L .~ ~ ' ' u6P'4S+-~P~-006£Q\l o~d~~o~~DOa~~saa 5£=b1 LOOZ-93j-LO -• m ~ _ ~ ~ I ti ~ ~ ~ c ~ -n I I ~ O~n 03 ~ ILJI ~ I ~ a ' ~ U ~m a o O ~ ' ' o ti c ' ° j -~~. N ~+ c c o. ~ o M~ a :° ~ E ~ C ~ c ~ ~ d v O o ° a o s ~ o m o a~ m° m ~ a ~ ~ v y ~ ~c ~ 3 ~ rr~ ~-a ~ '7 p ~~ i~ ~/ \J (-- d ._ r'1 ~' 'J .~ `J ~1 -. /' __ :!; OC W W _Z Z rW r _J ~"' W a OC m N II W H 66: 9Z/5 t/1 J 0 <m t/1 J Q Z 0 F'- Z W Z V O O .h 0 O d N I I I I I 1-f I I I I r I I I I 3 I I I I I I I ~ I ~ U I I I I ~ p I I ~ ~ I I I ~ I I I I I I I I I II I I I I ~ i A 1 ' ' ~ N ~ ~ ~ ~ ~ , ° u O H C ° ~ ~ y ~ = C OL ~ ° O i ~ ~ ~ ~ 3 d S a ~ d O c~ Y 3 ~ d ~ ~ m O > O X m° ~ ,i C ~ ~ ~ ' °°' C O LL s ~ O o ti ~ O -C ~° l o l l I I , I I N r I I ~ I I I I I ~ I' I ~ ~ ~ I I I ~ Y I I I I I ~ ~ I I I~ 8~ W , I N ~ I ~ ~ ~ r I t I ~ ~ H ~~ 4 I 4 I I I H ~ ~ ~ ~ ~ c ~ ~ y ' a ° ° ~ } V1 'O O H I ui ~ I ~ ` ~ LL ~ W ~ ~ ~ i ° ~ o V V ° ° ° N ~ , ~ ° ~ ~ i Vl ° ~ V ° G ° ~ ~ O U .n O v U ' ° = 3 v ° c U ° O n O W v C ~ ~ ' O _ J to ° ° J ° C a ° ° ~ = O ~ d a 0 W ~ C ' ° r O C J ~ ~ ` B ° L S a ~ 1-- N O a 'a > O ~ ~- V~ 7 C ~ .- 3 N ~ ~ ~ ~ o • -o ~ ° N ' -o ~ -0 ~ 3 y v m ~ -o ~ -a ~ ~ ~ ' v ~ x ~ O 0 - 0 ~ O o o ~ . a ~ o ~ c -O ° o C ; d ~ ° o 'O ° .~ O c a ° C C o c o d c -E c -o c ~ c ~ c p -o c ~ c 3 ~ ~ ••. O u ~ u O C u a u a s ( ~ O G°C O H o°C O ~°G ~ N ~ ° D o°C O o°C 0 ~ G°L Q Q°C ~ Ills $ J ~ W v i ~ i ~ I I I I I I ~ ~ ~ _ I T I\ I I I ~i ul ~' I ~~ J ~ . a IUQI V I W O O 1 `' I ~ I O I : I I 1 1 a I ~ I ~I u u y I I I ~ ~ I I I ,I ' ' , q °- ~ ; ' ~ i . i i~ i i ~ ~ ~ ~ ~ ' •- u c ° ~ c a3 U ii ~i m ~i o y. = i w .Y. a ~ ° ~ W .Y ° L ° oC ~ ~ ~ ' I > E ° .~ 3 = ~ o LL o ° O A N N O '~ C O v ~ O ~ ~ m C ~ j E ~ 0 ~ p d O ~ d1 C ~ , G { . °~ p ~ C , en G O ~ h ~n 3 V m° 3 v~ V ~ ~ ° ~ a a c. c. a o. -o ~ a o ° y w O d O d O ` O ` O ` O O '• O > > 0 U d d c _ d V~ d w a . I I n ~ I I V ~ u N ° a 3 ~ O ~ E ~ ~ ~_ ° O i y ° I~ O m m ' S c c a G C O ~~ -yp O a m ~` k o o E ~ v m~ ° c O M •C O O N N N ~ a - O i N oL tL D ~ d v I ' ~ i ~ ~ ~ V ' p a c _ ~ ~ ~ f- ° 0 ~,~ o o = ~~ 3 m ~ ~ ~ a o m m o a ~_ ~~ ~ m ~ c s 0~° m ~ V p c „ ; c c or a ~ d ~ ~' ~ _ ° o ~ ~ s =° ~ `m i s m ~ c a .= c °~-° ° ~ ~ o~ ~ n°- ~~ o N ~ o c~ ~j ~ s j O o o° c o o~ c o ,Q€~ `° ~~ 3~ •a o°e c~ C ~ p m t ` L t S~~ t~ 0 ~ N C S m O s p m ~ ~~ b 3°~ p N O `U "' ?~° 0 0;; m m c c ~ o V 3 ~ ~ m _d o ~~ o m o c -c ~ `° c P y ~ o a ao -+U-., c; OC oD ~ O O O m° 'p O O d7 ~ O '~ ° O U~ O `- ~ O ~ ~' m p F- N ~ y 0 ,y O •- ~= d u°. ~~ _w ax o y o y o o a ~ "' " 3 3 m o o av LL• 3 m a o m 3 c o c°~~ °~ o~ IL n. t~ d ~ d 1-- ~ V ~ ~ x V°f tii to d H V ~ ~ x d d (~ ~ H d VO! N 1-° 3 != ii F° ~ of i ° ~ ~ ~+ m m = ~ ' J ° ` O. ~ O. ° ° J :~ -~ O.. d. d O ~ ~ ° ~ C O Q °~ t U ±. ~ o ° ~ W ° E ~`~ ' ~ ° O ~ •° ~ J J ~ O W W (~G~ ,, c c = c m Vyyy~ ~ ° ~V ~ p J J d J C V ~ ° ` O ~ w] C y3 ~~ p ~ ~ a a J C •~ _ 1j ~ O 3 3 ~ 3 C~ o o~ o° •~ p r o o ~ o 0 0 0 o U 0 p V oa ,r s -~ s ° c c ° E E~ y D' ~ O C1 p O C ~ d~~ ce ~ V V W F- H d° m *= a a c w a a a a m W ~ d ~ O. V ~ ~ ~ 4. ~ O. 0 V ° 2 F N ° -° °a ~° ~ -o ° v! f%! x m J ~ N ~ -$ a s U 3 0` 4 ~~ ~~ m o ~ m ' C C ~ S pN~ N OC N ~ ~ h I l X~~~~I~~ i ~ I I l ImI m m m I I I .4 M XN m 3 3 3 m w a ~ ~ W I I ~ I I I ~ ~ I I I I ;~ I I h 4 ~ ~ ' ~ a ~ ~m .~ ~ ' o c O ~ p r~~=~ ~ ~ ~-~ ~~ mm o ~ W o c °° c~ o m ~p0-ao- E~ ° ~~ ~ m ~3° o°° m m q ' ~ ~ O ~ ~. ~ O ~ ~ ~ ~ ° O ~ °Of ~ ' c J ° ° E = E ~ ~ ~ ~ ~ 0 0 °' ~3 c c ° ~ C J d ~ pJJ ~V~Z E ° ~ od o W W C~ > > J S ~ O C_ O ~ ~ = ~ ~ ~ Z ~ J ° ~ ~ ° C C 0 J Z ° O~ 0 0 dl m ~ ` O O~ O O O~ O ° C p C .C C~ m a p t/1 V H _ O U d d d W d d d d W~ x~ J d ° O O a ~I a a a O 0 _ > a u6p~ys1-fipa-l71P~ U '~~ ~ o >3 ~~ V p ° m x O 3 O m ~3 c = -O c O F7 ~ W ~ ~ 0 m m 8 N 0 a • ~ I~I~ Z ~ [~z~)1 =_P~ V m~o G ~ mz~m L 4pN S~z~+ ~\ ~ ~ ~ ~ \ ~ \ ~ \ ~ ~~ ~~ ~~ ~~ ~ ~ W _J 0 U AAO V\ II 66/bi/S ~"~ 0 J Z R J J J ~ m m ~ m ~ N N t ~ r~ vui -• a Z N ~ P n O N iP[Ih~N a . N ~ m ~ ~ ~ O J ~ ^ n T m N 0 P i[1 n M O ., U1 tp n n w w ~mmmrv° N N v N m mM-~~ W~ N P 0 N 0 . n , .. . . ammea rMi~ cv mm° mNmel•1b o ~~nrmm ~;mmmmm mmm~~ mm N a 0 w a Y ~r ~,. ~ ~mW_ n J • O ~ ~ O V '>w~a' Z Vim. z m w~~Y m N N • m z ~ rc a 0 F O U h U ~ a a z o MO U "'+ ~ ~ F vWj O o nx~ ~ W O F+ ~~~a ~~~o ~ ~ a T~~~ V aQ ~~~ ~~oo ~~ ~ ~ ti UH ~ W F c3 ~ ~ ~ ws o ~ z ~~ a~~ ~~ U W ~' x U O ~ ~, ~ ~ a ~w a~Z~ ® 2 ~~$,ro my m ~oN ~~ / "~ / ~ I ~ ~ ~ r ~ ~ ~ ~ ~ ' / ~ / ~ moo mN mz~i~+ ~OO~ °o~„`= z~nzW u6p"E 16050-'1-s I-00b~9\sl~a K. fi7°Ii 1 s ~~ ~ O W ~Qa~ ~~ Q~'i Fes- O~~ O'~+ ~WNO~o~~$~ oo°po p Q~~ w N~ ~~ ~ M~= Z Fy W~mp2 ~~~ p ~pcn V pUWp~~`'o~0 3 ~cWii I . ' ~ W ~ W ~ W ~ ~ ~ p O ~ ~ ~_ ~ ~ ~ p ~^•~ ~ ~ ~ O W~~~~~omooQ~o W OQrnp tiV~ o J ? {~, ~ N~ ti 2~= N i p U f'~ 8~ Wg~Qg~~W W~x2~ Q W ~ ~ ~ ~ ~ O ti W ~ ~ W a' 3~~ x m W ~~.{+ Z ti ~ ` t, Z Q Z W Z `j m 1 ~ ~ \ ~ ~ V a ~ I 4~ ~ p a b I _ {/ ~ ~ ~ ~ y ~ Q L-+ p~ ~ O 8 a ,~ o te~ ( b V Z ~ O v h W 1•' W ~I d ~o~ J_ Qy~ P ,a mOJ ~ ~ 9~ ~~ x u o o ~ ~~ o ~~~ ~ $~$o „ ~~z~ ., 0 0 ~~~o ~ ~~4g~~~ O r ` < y Q < ec R ~ ~ ~ O ~ ~ F ~ r e ~ ~~~7~ ~ o~ ~uZ ~~ ~~~ ~ FQ~ `~ u ~ 3u d s 66/9[/9 u6p•wns -fip,-006£9\ o-+ \ eMpPOa\:a 9b~n cooz-e3~-zo ~ ~~ ~ -~ S st o _ ~~ r r ° ~Y $ r o n ~ u o 3 = = VU j ~ < u7 O ~°n o m (dj a N V1 0 V F 7 h ~c O O O ~ H N ~ oz Q ~ ~ ~ oa n f n ?~~v ~ Y u n °o °o a ~ , ~+ ~ g + Q _~ _n ~ ~ O O O ; ' Z ~Y O r ~ O ~ + + n 7VV Obi S~ ~ ° ° ~ r S 8 S S n r ~n ~ F ~ v ~ ~ ~ m Z < O "' N y W < g g n ~ = V o ~ t t m m p 1 O O ~ ~ H n ~ ~ ~ Z O ~' ~ 'r ^ ~ P P p, r H h C H P ^ O a N A b ~ ~ X ' tr1 ~ ~ Y .Y ~ ~ h h C ~ N ~ N ~ N ~ n O n O o n O n O 0 O P O O ~" ~' Z + + O O H O h ~ m ~ J O FF FF ~ Q ~ ~ yy 6 = N N ~ ~ ~ 0 F ~ ~ y ep C~ < u7l {W > ~ O W U O ~ } v- 8 ° S ~ v c~i rW' S ~ ~j~~j i n ~ ~ O ~ ~c ° C d + + 6 M" Z e d O d (7 Pl p W - ~ F 3 ° ~ o ~, -~ ~ ° ~ g I~vlsloNs 391 C7 _rdy_s•4 ps h.dyn r~ W ~ ~ r O ~ ~ r D ' N a~g .. ~ t u ~ uJ p e ~~ 41 °Pm } C~ o ~ r ~'-I $ T °mD L F °~f Q 5 ?gm °' m y rn~ = r rnl y ~ n C ~ C7 ~ I rn ~rn O ~ ~ ~ C ti r t 5 i ~ / / O / M I ~ ~'~ T i; ~L 1 0 a f u I ~ ~r W N OP N 1 ~ A D ~ _ N OBI O>' a m 3 p N o ~ m ~ n n P r m l ti ..r0 ~1 ~ ti~ m~ ~' o °>D n rr' 0 _m ... ? °- > ~ p ^ N o m ~ m 4 ~ n O // f1 I o iu u NT m- ~ m ~ g o ~ S° r T w + n ~ c ~ s -/ m oDm a .rte } ~ ~ +m N s $~ m ~n r gm °_oA p' ' ~ ti +~ ~ o r os + $ v m n v } "~Iw6 0 0 o~ ~ ~ ? ~ m d + ~ ° ~ ^~ • ~ v yam ~ ~ ~ ~ti"'I °zD ~O Qtr ~ T ~ o' ? m m < ~ o o + ~ ~. ~ n x } ° 0 8 vJ a 10 T °o S a~~m K ~ ~ t/N~ ~ I ~ ~ ~ ~ ~ ~,~ ~ a ~ N ~ ~ \ ~\ \ ~i n \ p\ ~ a _ ~' ~ IY \ $ r \ a `~ ~~nn ~~ V. $ ~ o", ~ ~ O ~~ R: L ~~ 2 ~\ ~ / / ~ ~ O ~/ ~ ~ / /~ ~ ~~,/ ~$, ~ ~ j' 9' / ~ at i ~ .# ,a j ~i / ~ i ~ / / . / ~ ~ / 2 ~ / ~ ~ / w ~ ~~ pWp ~ / \ ~i/// ~ / / ~ ~ ~ I I t { ~ ~ O 1 ~ N ~~ ~~ I ~ $ ~I / I7I T ~ //' ~ I ~ / ~' l ~ ~ /.l/ /r/ - 2 r 8 O N y$ 1 y a X41 0 0 y ~'~1 ,~I2 + ~ ~~~~~~ P u u II a ycn r ~ ~ ~y ~~~ZZ_v ~D i V1 L$$U ~~~ ~ ~~~ . m P~: ~ =~ ~ ~. •p* m J~, ~ ~ ~~~o~v II II II II 4 ~ ~~ao y g$Zn ~yoN O ~~~ ~ ~ ~~m~ n ~~~ mfr `° y ''~... ~ D ~ l Ln N In'a- O I m J ~E `O~•a N u u ° u "v~ z~ ~wV~~cN ~ y, C~~7Q~al~V 8 ~~~ ~~ y q 4 ~ u- V ~ ~~ >_. Q7 H$ (n L ~ ~~ v + °zN~ C7p ^I C ~~I~Op'p ~; ro ~p> II II II II II II R V1 P Z K y,~ N tv'il ~ry~ IV nl O~W~~~al ~~~~ ~ ^ ~~~~e~(s,~W 7o N [~ ~'^2= ~01Q1 r W nm C ~ O7ll m ~ r n ~ Z ~ {~'Y WHO ~J~ ti r D ax J ~ ~ ~ lT N ~~~0~ _~ II II II II 4 N A o N41 ~i n2ynl w +~ ~W~ U ^J ~ V+~ ~~ ~ ~~~ ~ ~ v A~''OD~ 2 ~f II II II II W N '~.%e ~ ~ ..pta Vf pop tS 6, '> o~~~Ulb o a~ s ~oOO~tn~~~ n ~" x + ~ylr $s K ~~ O ~~ z o = ° • SLOPE STARE ~ o n - - ~mm ;z~ °° s r nH & n m ~ ~ 7 m2 ~ ° . n o n n o O CLEAFWG LIMBS O r m z n 2 r~ ro y zzz rn bi t7i 95 1 ~ 2 ~~ ~ O to m Z ~~ Om y Z _Q `_ l1 O C i ~ Q K ~~ 0 ~~ 2 ~~ a z 0 i i 02-FEd-2V0 \ oodweV $$~$USERt~ / 12:18 \p o \63900_rdy_pfl.dgn AMES~$E 5/14i 99 r O y • ` r J ~ ~ 2 A ~ ** >y p J~ N ggg~~~~~~ y~ymrnr*,c3Z5Z5 n ~~ ~ ~xxx $$ ~ ~~ ~ ~~~~ n~ d i ~~g~g~~~? ~ ~2 i ~ y ~ ~ ~„~'~~i ^'n ~ ~~2 : a w x ~ n, g c'7 u M u u M u u ~ u O ~ ~"~~' ~~~~~ y ~ti~ ~~~~~ J I .. V J ~I _ V C 2 2 N ~ O ~ i ~ ~ oo i ~y i 2 ~k N O r p ~2 ~rn O O ~ N N o Q i y~ S am sC ~:.l ' !o ~ ~ + C s c ~ a ~ ~~ z ~ a ~ w n ~ z '-E 'b ~ r ~ z z ~ w _ ~~ Z 0 Z O N N ~ In O + O + O t O + (D + m + V + V + O } (n + (T + (T + A + A + W + (A cn o ~ o <n o cn o u, o ~ o v, o cn ~ °; ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ pp 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D Z _- _ _ - - - ~ m z ~ c c ~ O • - r '~ m a x ~ ~ z ~ w_ V w ~ (IOD O O O O O _ A CWT A O V O n r c v m m ~ ~ 3 m ~a ~ n w ~ m m rn m A T N J CD N O O V m (T A W (b O [D CT O (T A (b A A V O CT (A ~ O O r f T I O ~ C C ° Z ° O ~ m m °, ~ n C 0 0 0 0 0 0 0 i~ o cn 0 0 0 0 0 ~ --. C n > C Q ~ ~ d A C j (b O N CD N V O O O O O O O O O O O I I i ~ y d ~ O y ~ ~ ~ -.-~ O ~ ~ ~ ~ - - - I I i ~ i y ~~ I i ~ , ~ I ~ ~ l , y Q ~ I i ~ ~ ~ Z ~ ~ - ~ ~~ - ~ C ' ;I ~ , C 7 C x ~ ~ ~ ~ ~ ~ ~ ~ ~' - - ~ z ~ ~ -- -- - - ~ ~ i a O I Q7 m w '~ m -- O O 9 O Z A m z O I N i = i X m m I _ D Z i I i i o