Loading...
HomeMy WebLinkAbout20191015 Ver 1_PCN Form Submission_20190730DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Oange only if needed. BIMS # Assigned * Version#* 20191015 1 Is a payment required for this project?* r No payment required r Fee received Reviewing Office* r Fee needed - send electronic notification Central Office - (919) 707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Buffalo Road at Archer Lodge drainage and paving improvement. 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* 1c. Primary Contact Phone:* tccoggins@ncdot.gov (252)717-8699 Date Submitted 7/30/2019 Nearest Body of Water Big Arm Creek Basin Neuse Water Classification QNSW Site Coordinates Latitude: Longitude: 35.69704-78.37767 FA. Processing Information County (or Counties) where the project is located: Johnston Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: 80094 / W-5601 DP WBS#M 50138.1.121 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express W Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No FB. Applicant Information 1d. Who is applying for the permit? r- Owner rJ Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of North Carolina (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address P.O. Box 3165 Address Line 2 city Wilson Postal / Zip Cide 27828 2e. Telephone Number: (252)717-8699 2g. Email Address:* State / Frovinee / R�gion NC Q�untry USA 2f. Fax Number: * r Yes r No r Yes r No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: 3c.Address Street Address P.O. Box 3165 Address Line 2 CKY Wilson Postal / Zip Cade 27828 3d. Telephone Number: (252)717-8699 3f. Email Address:* tecoggiins@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (ff appropriate) 1c. Nearest municipality/town: Archer Lodge 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 cfty Postal / Zip Cede 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Big Arm Creek 3b. Water Resources Classification of nearest receiving water:* QNSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202011102 4. Project Description and History State / Rovince / P pion NC Country USA 3e. Fax Number: 2b. Property size: State / Fravinee / iPogion Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Forestry and Agriculture are the predominant land uses with some single-family residential housing in the vicinity of this project. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) W-5601 DP Topo map.pdf 2.67MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) W-5601 DP Soils map.pdf 2.11 MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.00 4g. List the total estimated linear feet of all existing streams on the property: 35 linear feet of ditched intermittent stream channe I 4h. Explain the purpose of the proposed project:* Buffalo Road at Archer Lodge drainage and paving improvement to address safety issues associated with current traffic demands. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Buffalo Road at Archer Lodge drainage and paving improvement to address safety issues associated with current traffic demands. The project includes an eAsting culvert extension associated with shoulder widening for the project. Heavy road building equipment will be used. 4j. Please upload project drawings for the proposed project. 80094_Permit Drawings2019-07-18.pdf 2.15MB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chad Coggins Agency/Consultant Company: NCDOT Div 4 DEO Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No, single and complete linear transportation project with independent utility. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 3. Stream Impacts F13a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * �3e. Stream Type * �3f. Type of ]3g.S.width* �3h.lmpact (?) Jurisdiction* gth* Flite 1 Permanent Culvert :PigArm Creek Intermittent Both 3 Avenge(fee[) 16 (linear feet) Hsite 1 Temporary Dewatering Ui Big Arm Creek Intermittent Both 3 Average (feet) 17 (linearfeet) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 6 3i. Total stream and ditch impacts: 33 3j. Comments: 3i. Total temporary stream impacts: 17 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Clh ck all that apply. P Neuse r Tar -Pamlico r- Catawba r Randleman r- Goose Creek r Jordan Lake r Other b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact 3advay & culvert extension P LfT Big Arm Creek No 3,192 2,228 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 3,192.00 2,228.00 Zone 1 Zone 2 Total combined buffer impacts: 3,192.00 2,228.00 6i. Comments: Supporting Documentation 80094_Permit Drawings_2019-07-18.pdf E. Impact Justification and Mitigation 1. Avoidance and Minimization 2.15MB la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Constructing improvements on ebsting alignment in extsting right-of-way. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment will be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to the project. Safety fencing will be used to delineate jurisdictional and environmentally sensitive areas from encroachment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project stream channel fill falls below Regional Conditions threshold of impacts / requirement for compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader V Vegetated Conveyance (lower SHWT) r- Wetland Swale (higher SHWT) r" Other SCM that removes minimum 30 % nitrogen r" Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 80094 SMP.pdf 143.03KB v 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments:* MCDC available on request. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15ANCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Safety project improvements constructed to meet current traffic demands. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown What Federal Agency is involved? FHWA 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Red -cockaded woodpecker (RCW) is included in the IPaC TE list dated July 23, 2019. RCW foraging, or nesting habitat was not found adjacent to the project area. NCNHP database records no element occurrence within a mile of the project area. (No Affect) / Neuse River Waterdog is included in the IPaC TE list dated July 23, 2019. The "Proposed Threatened" listing for this species was announced May 2019. This species is active during cold water events of Winter and early Spring. Therefore, there has not been an appropriate widowof conditions to conduct survey for this species. Surveys will be conducted when required by T&E protocols. NCNHP database records no element occurrence within a mile of the project area. (unresolved) H Carolina Madtom ('Proposed Threatened) is included in the IPaC TE list dated July 23, 2019. The "Proposed Threatened" listing for this species was announced May 2019. There has not been an appropriate widow of conditions to conduct survey for this species. Surveys will be conducted when required by T&E protocols. NCNHP database records no element occurrence within a mile of the project area. (unresolved) /// Atlantic Pigtoe (AP) ('Proposed Threatened) is included in the IPaC TE list dated July 18, 2019. The proposed impacted jurisdictional feature is an excavated intermittent blue line stream that has seasonal flow and no habitat for Atlantic Pigtoe. Also, reviewof the 12-digit HUC GIS element occurrence layer shows this species is not included for the project identified 12-digit HUC. NCNHP database element occurrence shows Atlantic Pigtoe is in a 12-digit HUC two 12- digit HUC units to the east of the project site (Cattail / Little River Subbasin); approximately 7 miles from the project site. (No Affect) //// Dwarf Wedgemussel is included in the IPaC TE list dated July 23, 2019. The proposed impacted jurisdictional feature is an excavated intermittent blue line stream that has seasonal flow and no habitat for Dwarf Wedgemussel. Also, reviewof the 12-digit HUC GIS element occurrence layer shows this species is not included for the project identified 12-digit HUC. NCNHP database element occurrence shows Dwarf Wedgemussel is in a 12-digit HUC two 12-digit HUC units to the east of the project site (Cattail / Little River Subbasin); approximately 7 miles from the project site. (No Affect) ///// Tar River Spinymussel is included in the IPaC TE list dated July 23, 2019. The proposed impacted jurisdictional feature is an excavated intermittent blue line stream that has seasonal flow and no habitat for Tar River Spinymussel. Also, reviewof the 12-digit HUC GIS element occurrence layer shows this species is not included for the project identified 12-digit HUC. NCNHP database element occurrence shows Tar River Spinymussel is in a 12-digit HUC two 12-digit HUC units to the east of the project site (Cattail / Little River Subbasin); approxmately 7 miles from the project site. (No Affect) ////// Yellow Lance is included in the IPaC TE list dated July 23, 2019. The proposed impacted jurisdictional feature is an excavated intermittent blue line stream that has seasonal flow and no habitat for Yellow Lance. Also, review of the 12-digit HUC GIS element occurrence layer shows this species is not included for the project identified 12-digit HUC. NCNHP database element occurrence shows Yellow Lance is in a 12-digit HUC two 12-digit HUC units to the east of the project site (Cattail / Little River Subbasin); approxmately 7 miles from the project site. (No Affect) /////// Michaux!s Sumac (MS) is included in the IPaC TE list dated July 23, 2019. No MS was found within the project area. NCNHP database records no element occurrence within a mile of the project area. (No Affect) //////// Programmatic BO of MALAA for NLEB. Consultation Documentation Upload FWS IPaC TE list.pdf 245.13KB Johnston Co. TE List.pdf 63.17KB NCNHP element occurrence letter.pdf 3.16MB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* GIS/NOAA Atlantic Sturgeon proposed rule dated 06/03/2016. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU Clearance 7c. Historic or Prehistoric Information Upload 18-07-0027NeedSurvey.pdf 2.97MB 18-07-0027SignedEffectsConcForm.pdf 5.45MB PA 18-07-0027 W-5601 No Archaeological Survey Required Buffalo.pdf 813.23KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. Signature W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature Date 7/30/2019