HomeMy WebLinkAbout010010_Follow-up_20181108r
0 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 010010 Facility Status: Active
Permit: AWC010010
❑ Denied Access
Inpsection Type: Compliance Inspection
Inactive Or Closed Date:
Reason for Visit: Follow-up County:
Alamance Region:
Winston-Salem
Date of Visit: lUDENAMANWntry Time: 02:45 pm Exit Time: 4:00 pm Incident #
Farm Name: Triple W Farms
Owner Email:
hwoody273@bellsouth.r
Owner: Harold Woody
Phone:
336-213-8644
Mailing Address: 3545 E Greensboro Rd
Snow Camp NC 27349
Physical Address: 3545 E Greensboro -Chapel Hill Hwy
Snow Camp NC 27349
Facility Status: ❑ Compliant M Not Compliant Integrator:
Location of Farm: Latitude:
35' 54' 15" Longitude:
79° 18' 00"
Take 87 south 13 miles to Dauls Exxon - turn right - go 1/2 miles to farm on right.
Question Areas:
Dischrge & Stream Impacts M Waste Col, Stor, & Treat
M Waste Application
M Records and Documents M Other Issues
Certified Operator: George H Woody
Operator Certification Number:
997975
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name Harold Woody
Phone : 336-213-8644
On -site representative Harold Woody
Phone : 336-213-8644
Primary Inspector: Melissa Rosebrock
Phone:
Inspector Signature:
Date:
Secondary Inspector(s):
Christine Lawson
Rebecca D Chandler
Inspection Summary:
page: 1
Permit: AWC010010 Owner - Facility : Harold Woody Facility Number: 010010
Inspection Date: 11/08/18 Inpsection Type: Compliance Inspection Reason for Visit: Follow-up
3. Waste that has accumulated beneath the push off ramp and flowed downhill is only 66 feet from. a well. There is a concern for
well water contamination since this practice has been occuring for several years. The stockpiling of waste too close to a well
continues to be a habitual violation.
4. Waste level in the new waste pond is 35 inches.over the maximum liquid/start pump mark (22 inches below spillway). This is a
continuing violation. See June22, July 12, and October 31, 2018 inspections.
5. & 7. Large crack in concrete wall of wet stack has been temporarily back -filled to stop leak of animal waste. Mr. Woody states
that permanent repairs are to be made when he can get sub -contractor out to the farm. Small leak continues in -another part of the
concrete wall (under the roofed section) but has only traveled a foot.
6. The small uncovered concrete pit at the rear of the milk parlor is still being used to hold waste until it can be pumped directly
into a honey wagon and applied. If waste is NOT going to be conveyed to the new waste pond via underground pipe, then this
method of waste management must be removed from the waste plan (CAWMP). If the dairy parlor is no longer in use then the pit
may be closed out. Mr. Woody states that the farm is in process of converting from a milking operation to a beef brood cow/calf
operation.
9. As noted in previous inspections over the last several years, the improper management of animal waste beneath the push off
ramp continues to be a violation of the CAWMP and the permit. Again, the new waste pond was NOT designed to receive overland
flow of solid waste.
11. Animal waste solids were being applied today. Mr. Woody was reminded to obtain a waste analysis within 60 days and to
record all the loads being applied.
21. Freeboard records are not being maintained. This is a continued violation (see June 22, July 12, and October 31, 2018
inspection reports).
30. See June, July, and October 2018 inspections. Mr. Woody has pumped some waste out since June 2018 but the waste level
is still non -compliant. Mr. Woody responded to WSRO requests for freeboard updates by sending photos on September 7 and
September 18, 2018. The WSRO received a partially completed plan of action (POA) on September 10, 2018. The WSRO was not
aware that the non -compliant freeboard level had increased further since the October 31, 2018 inspection.
34. The WSRO will need to continue monitoring the freeboard level in the new structure until compliant.
page: 2
Permit: AWC010010 Owner - Facility : Harold Woody Facility Number: 010010
Inspection Date: Inpsection Type: Compliance Inspection Reason for Visit: Follow-up
Waste Structures
Disignated Observed
Type Identifier Closed Date Start Date Freeboard Freeboard
Dry Stack
02
01/23/13
18.00
Waste Pit
CONCRETE PIT
18.00
Waste Pond
01
04/23/13
57.00
k
page: 3
Permit: AWC010010 . Owner - Facility : Harold Woody Facility Number: 010010
Inspection Date: 11/08/18 Inpsection Type: Compliance Inspection Reason for Visit: ' Follow-up
Discharges $ Stream Impacts
Yes
No Na Ne
1. Is any discharge observed from any part of the operation?
❑
0 ❑
❑
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
❑ ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
❑ ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
❑ ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
0
❑ ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No Na Ne
4. Is storage capacity less than adequate?
0
❑ ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large
0
❑ ❑
❑
trees, severe erosion, seepage, etc.)? I .
6. Are there structures on -site that are not properly addressed and/or managed through a
❑ ❑
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
M
❑ ❑
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicable
❑
M ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
M
❑ ❑
❑
maintenance or improvement?
Waste Application
Yes
No Na Ne
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑
❑
❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑
❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
page: 4
Permit: AWC010010 Owner- Facility: Harold Woody Facility Number: 010010
Inspection Date: 11/08/18 Inpsection Type: Compliance Inspection Reason for Visit: Follow-up
Waste Application Yes No Na Ne
Crop Type 1 Small Grain (Wheat, Barley,
Oats)
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
E ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
❑0
❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
❑ 0
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No Na Ne
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
❑ ❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
❑ ❑
0
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
0
❑ ❑
❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Stocking?
❑
page: 5
Permit: AWC010010 Owner - Facility : Harold Woody Facility Number: 010010
Inspection Date: 11/08/18 Inpsection Type: Compliance Inspection Reason for Visit: Follow-up
Records and Documents
Yes
No Na Ne
Crop yields?
❑
120 Minute inspections?
❑
Monthly and 1" Rainfall Inspections
❑
Sludge Survey
❑
22. Did the facility fail to install and maintain a rain gauge?
❑
M ❑
❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment
❑
❑ M
❑
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑
❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
❑
❑ 0
❑
appropriate box(es) below:
Failure to complete annual sludge survey
❑
Failure to develop a POA for sludge levels
❑
Non -compliant sludge levels in any lagoon
❑
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑
0 ❑
❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
❑
M ❑
❑
Other Issues
Yes
No Na Ne
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
❑
M ❑
❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
❑,
M ❑
❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit?
0
❑ ❑
❑
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
❑
M ❑
❑
If yes, check the appropriate box below.
Application Field
❑
Lagoon / Storage Pond
❑
Other
❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
❑
M ❑
❑
CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
❑
❑
❑
34. Does the facility require a follow-up visit by same agency?
M
❑ ❑
❑
page: 6