HomeMy WebLinkAbout20151065 Ver 1_More Info Received_20190726Homewood, Sue From: Darling, Richard <RDarling@mbakerintl.com> Sent: Friday, July 26, 2019 2:41 PM To: David.E.Bailey2@usace.army.mil Cc: Homewood, Sue; Alex Rosser; Lisa Elmore (ElmoreL@gsoair.org); Lorin Akins; Kimberly Hodges; Wright, Matt; Leopardi, Heather/PGH; Burhans, Terry Subject: [External] GSO Northwest Site Development, Action ID SAW -2012-01547 Attachments: NW_PreConAgenda.pdf, Crossfield Taxiway Package 1 -USACE Plan Verification.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Aloha Dave: Pursuant to Special Condition 4 of the subject Section 404 Individual Permit and the Workplan Verification (attached), the Piedmont Triad Airport Authority (PTAA, permittee) has verified that the construction plans for this phase of the project comply with the permit drawings. Per my voice message yesterday, PTAA is planning a Pre -Construction Meeting for Thursday August 8 at 11:00 AM at the Airport (GSO). It is hoped that the first part of this meeting would constitute the onsite pre -construction meeting required by Special Condition 5 of the subject Permit. Attached is a draft agenda for this portion of the meeting - items specific for review with contractor personnel are highlighted. If you are unable to attend this meeting, a Michael Baker individual familiar with Section 404 regulations and permitting will lead the permit compliance discussion. If the Pre -Construction Meeting is successful, dewatering of the four jurisdictional Golf Course Ponds is planned to commence the following day, August 9, 2019. Draining the ponds will involve minimal disturbance through a series of siphon pumps to draw the water down as low as possible at a moderate rate. Clean pond water would be transferred from pond to pond and eventually to the current outlet structure. When the water elevation has sufficiently lowered, the existing standpipes would be cut to prevent rainfall from re -filling the ponds. Once the siphons have drained all they are capable of, then pumps and filter bags will be used to remove the remaining water. Construction is scheduled to commence approximately two weeks after the pre -construction meeting. Pursuant to Special Condition 9 of the subject Permit, PTAA is hereby notifying the Corps of proposed beginning of the authorized work. Pursuant to Special Condition 12 of the subject Permit, PTAA require contractors and agents to comply with the terms and conditions of this permit. PTAA have provided contractors associated with the construction or maintenance of this project with a copy of this Permit which is also available at the project job site. Please contact me or Matt Wright with questions or comments regarding PTAA compliance with the subject permit and to let us know whether you will be attending the pre -construction meeting on the 8th. Thanks again for your continued assistance. Richard Richard Darling I Project Manager - Environmental 200 Centreport Drive, Suite 350 1 Greensboro, NC 27409 1 [O] 919-481-57401 [M] 808-366-1971 rdarling@mbakerintl.com I www.mbakerintl.com CROSSFIELD TAXIWAY — PACKAGE I JAICOBS C1424ft PIEDMONT TRIAD INTERNATIONAL AIRPORT June 3, 2019 Mr. J. Alex Rosser, PE; Deputy Executive Director Piedmont Triad Airport Authority 1000-A Ted Johnson Parkway Greensboro, NC 27409 Subject: Northwest Taxiway Connector Construction Plan Verification USACE 404 Individual Permit (Action ID SAW -2012-01547) The construction design plans for the taxiway phase of this project, designated as "Crossfield Taxiway — Package One (1)" do not deviate from the permit plans attached to the Section 404 Clean Water Act authorization issued by the United States Army Corps of Engineers (USACE). This letter serves as written verification pursuant to Special Condition 4 that the final construction drawings comply with the permit drawings for the taxiway attached to the subject Individual Permit. A link to the final design plans for this project is provided below. Any deviation in the construction design plans will be brought to the attention of the USACE, Mr. David E. Bailey of the Raleigh Regulatory Field Office, prior to active construction in waters or wetlands. Please do not hesitate to contact me with any questions or comments regarding this verification of the construction plans. Sincerely CH2M HILL North Carolina, Inc. (a wholly-owned subsidiary of Jacobs) Matt Wright, P. . Jacobs Project Manager I Aviation RD/MW: cc: Richard Darling, MICHAEL BAKER INTERNATIONAL Issued for Bid Plan Set: https://iacobsengineering- my.shorepoint.com:443/:b:/g/personal/matt wrightl iacobs com/EdpxAQUPpTtNiUKeANlbhBOBTB1uK1z7hgLx1YJVGNCSOQ?e mail=rossero%40gosair. org&e=ldyFTl Piedmont Triad Airport Authority Crossfield Taxiway — Package 1 INTERMAT10NAL MEETING: 404 Pre -Construction PROJECT: GSO Northwest Site Development DATE/TIME: August 8, 2019; 11:00 AM Meeting Agenda LOCATION: Stanley Frank Board Room, Piedmont Triad International Airport; 1000A Ted Johnson Parkway; Greensboro, NC 27409 OBJECTIVE: "...to ensure that there is a mutual understanding of all terms and conditions contained within the Department of the Army Permit." INVITEES: David Bailey (USACE); Alex Rosser, Lisa Elmore, Loren Akins (PTAA); Terry Burhans (MICHAEL BAK ; Matt Wright, )ar (JACOBS CH2M); CONTRACTOR PERSONNEL Special Condition 5 of the Clean Water Act Section 404 Individual Permit (Action ID SAW -2012-01547) issued on April 11, 2016 by the United States Army Corps of Engineers (USACE) to the Piedmont Triad Airport Authority (PTAA) for the Northwest Site Development including cross -field taxiway specifies the onsite pre -construction meeting. Preliminary clearing and grubbing of the permitted construction areas, excluding jurisdictional waters and riparian buffers, was approved on August 25, 2017. Construction is scheduled to commence approximately two weeks after this pre -construction meeting. Introductions Attendees will provide contact information on "sign -in" sheet. Signatures of attending contractor personnel indicate understanding and acceptance of responsibilities for compliance with all applicable conditions of the 404 Individual Permit and 401 Water Quality Certification. 404 Permit General Conditions 1. Expiration December 312026 2. Abandonment 3. Archaeological Remains 4. Sale 5. Section 401 Water Quality Certification (WQC004054, 20 Conditions) 6. Inspection Work Limits 404 Special Conditions 1. Compliance with Workplans 2. No Wetland Impacts 3. No Flow Impacts 4. Verification of Construction Plans ✓ 5. Pre -Construction Meeting ✓ Related Laws 404 Special Conditions 6. Contamination 7. Protected Species 8. Cultural Resources 401 Conditions 1. Approved Impacts 3. No Other Impacts 5. Modification 8. No Stream Impacts 18. Compliance with Workplans 401 Conditions 4. Stormwater Management Plan(s) 7. NPDES Construction Permit ✓ 16. Other Approvals Page 1 of 2 GSO Northwest Site Development 404 Pre -Construction Project Maintenance 404 Special Conditions 9. Construction Notification ✓ 10. Clean Fill 11. Concrete 12. Permit Distribution 13. E&SC Devices 14. E&SC Removal Enforcement 404 Special Conditions 15. Restoration 16. Submittals 17. Violations 18. Inspections 401 Conditions 6. E&SC Practices 6. E&SC Placement 9. Concrete 10. Culverts 11. Temporary Impacts 12. E&SC P&D Manual 13. Riprap Installation 14. Riprap Specifications 15. Fertilizer 19. Completion Certification 401 Conditions 17. Responsibility 20. Inspections Mitigation 404 Special Condition 19 ✓ 401 Condition 2 ✓ Compensatory Mitigation for authorized impacts to 244 linear feet perennial stream has been completed by PTAA through application of 488 stream mitigation units (SMUs) from the Causey Farm mitigation site. Attachments 404 Individual Permit (38 pages) 401 Water Quality Certification (8 pages) Permit Drawings (15 sheets) https://projects.mbakercorp.com/PTIA/404/NW PreConAgenda.pdf Meeting Agenda Page 2 of 2 August 8, 2019