HomeMy WebLinkAbout970008_Correspondence_20180620Rosebrock, Melissa
From: Holcomb, Lee - NRCS, Wilksboro, NC <Lee.Holcomb@nc.usda.gov>
Sent: Wednesday, June 20, 2018 1:09 PM
To: Rosebrock, Melissa; Greer, Barry - NRCS-CD, Wilkesboro, NC; Evans, Jeremy - NRCS, Wilkesboro,
NC
Subject: [External] RE: Cliff Hutchison -New Barn?
CAUTION:",External emali.bo' not click links;or open attachments unlessmverified. Send all "suspicious email as an attachment to A, ._�
Melissa,
They have applied for NRCS funding to assist with the potential to move to a 100% confined animal dairy to eliminate milking
cows crossing the creek to come to the milking parlor. The main reason being to eliminate the potential point source pollution
from cattle traffic.
NRCS engineer and NRCS Team 4 personnel have begun trying to come up with a design to house all of the milking cows and
handle/modify the waste storage facilities to accommodate 100% confinement. NRCS does not normally "cost -share" on animal
housing, but per our EQIP program policy an applicant can request a waiver from the State Conservationist to obtain cost share
funds to assist in animal housing as a component of a waste storage facility. NRCS Team 4 staff is working with Cliff and the
dairy on a proposal to submit to the State Conservationist to consider a waiver.
That is all the information I have for you at this time, but I did want you to know that Cliff does have an EQIP application and we
are working with them.
Thanks,
Lee
Z" �, qe&d�
USDA-NRCS
Supervisory Soil Conservationist, Team 4
Headquartered:
416 Executive Drive, Suite C
Wilkesboro, NC 28697
336-838-3622 x 107 (Office)
252-370-0318 (Work Cell)
From: Rosebrock, Melissa[mailto:melissa.rosebrock@ncdenr.gov]
Sent: Tuesday, June 19, 2018 5:28 PM
To: Holcomb, Lee - NRCS, Wilksboro, NC <Lee.Holcomb@nc.usda.gov>; Greer, Barry - NRCS-CD, Wilkesboro, NC
<Barry.Greer@nc.nacdnet.net>; Evans, Jeremy - NRCS, Wilkesboro, NC <jeremy.evans@nc.usda.gov>
Subject: Cliff Hutchison -New Barn?
Hi All,
As you know, we assessed a penalty of approx. $4306 to Mr. Hutchison in April this year for the waste discharge last December.
He has requested that we remit (do -away with) the penalty since he says he needs the money to build a new barn for 100%. His
letter, attached, states that he is working with NRCS to build a new barn and that he "is responsible for a portion." Is this
correct? I was under the impression that this project was not eligible for any monies.
Anyways, could you update me on the status, from your perspective? There is a hearing on his request next Wednesday.
Thanks so much,
Melissa
Melissa Rosebrock
Environmental Specialist 11
NC Division of Water Resources
NC Department of Environmental Quality
Office: 336-776-9699; Mobile: 336-813-7084; Email: melissa.rosebrock(a.ncdenr.-gov
Winston-Salem Regional Office
450 W. Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
If you need to report an emergency after normal business hours, please call the Emerengcy Response Center Hotline at 1-800-
858-0368.
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties.
This electronic message contains information generated by the USDA solely for the intended recipients. Any unauthorized
interception of this message or the use or disclosure of the information it contains may violate the law and subject the violator
to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email
immediately.