Loading...
HomeMy WebLinkAboutWQCS00060_CEI Response_20190725i POST OFFICE BOX 2263 SMITHFIELD, N.C. 27577 (919) 989-5075 July 25, 2019 Mr. Rick Bolich, LG Raleigh Regional Office NC DEQ DWR 1628 Mail Service Center Raleigh, NC 27699-1628 Re: Response to Compliance Evaluation Inspection Johnston County Collection System WWCS Permit WQCS00060 Dear Mr. Bolich: We would like to thank Zach Thomas and Erin Deck for their time and professional compliance inspection of our collection system (WQCS00060) on June 17, 2019. Your letter dated July 9, 2019 requests a response to items no. 9, 10.a.i and 10.a.ii. We offer the following information: 7. Service Tap Information —Please be advised that the Johnston County GIS system has been updated to identify parcels with Johnston County sewer service. 9. Newly Constructed Lines —County staff, including the collection system ORC or back-up ORC are present for a final inspection at the completion of each extension to the system. The County does not accept the extension for ownership, operation and maintenance until this final inspection is completed and all necessary close-out documents submitted to the County (including the final certification submittal to NC DEQ). Once the final inspection is completed and as -built drawings are submitted to the County, the County's GIS/AutoCAD Technician adds the sewer extension with relevant attributes to the County's GIS inventory (via field GPS and mapping). 15. Lift Stations —Please be advised that the fence repair at Selma Lift Station (noted in item 10.a.i) has been completed. In addition, the 24 HR contact information has been updated at the Buffalo Creek and Devil's Racetrack Stations. Please contact me at (919) 209-8333 or Chandrafarmer@johnstonnc.com if you have any questions or need additional information regarding this issue. Sincerely, Chandra Cox Farmer, PE Director of Utilities cc: Zach Thomas (email only) Printed on recycled paper Eric Marron