Loading...
HomeMy WebLinkAbout860010_Structure Evaluation_20180807M Division of Water -Resources Division of Soil and Water Conservation ❑ Other Agency Facility Number: 860010 Facility Status: Active permit: AWC860010 ❑ Denied Access Inppection Type: Structure Evaluation Inactive Or Closed Bate: Reason for Visit: Emergency County: Surry Region: Winston-Salem Date of Visit: 08/07/2018 Entry Time: 01:00 pm Exit Time: 2:30 pm Incident 0 Farm Name: Maple Ridge Dairy Owner Email: Owner: Maple Ridge Dairy Inc Phone: 336-719-7904 Mailing Address: 1174 Pine Ridge Rd Mount Airy NC 27030 Physical Address: 299 Horton Rd Mount Airy NC 27030 Facility Status: ❑ Compliant Not Compliant Integrator: Location of Farm: Pine Ridge Road off Hwy. 89 8 miles west of Mt. Airy. Latitude: 36° 30' 05" Longitude: 80° 43' 15" Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Certified Operator: Joshua Lee Horton Operator Certification Number: 995249 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Daniel Horton Phone: 336-401-2490 On -site representative Daniel Horton Phone, 336-401-2490 Primary Inspector: Melissa Rosebrock Phone: 336— —1 _16 - 76 9 Inspector Signature: �✓ .A 1 .�A.4,4 A 11� Date: '77 Secondary Inspector(s): 1\ Inspection Summary: page: 1 Permit: AWC860010 Owner - Facility : Maple Ridge Dairy Inc Facility Number: 860010 Inspection Date: 08/07/18 Inpsection Type: Structure Evaluation Reason for Visit: Emergency 1., 2. & 9. Today's visit was to check on the condition of the waste storage pond dam and the. current waste level. No discharge was observed from the waste structure. However, solid waste stockpiled on the concrete ramp has run-off into a culvert on the south side of the ramp and flowed into the stream which is downslope of the waste pond. —Must scrape ALL waste onto the concrete or into the waste pond so that NO waste leaves the waste management system. OIC, Josh Horton, stated he would move the solid waste after.our visit. MUST complete plan of action (POA) and submit to the Winston-Salem Regional Office. Daniel Horton was emalled POA. 4. The facility has received around 12 inches of rain In the last week or so. The area received additional rain after our visit as well. No trees, woody vegetation, slumping or seeping were noted on the waste pond dam. 7. When soil conditions allow, the dam needs to be mowed (2016, 2017 inspections). Due to rain and equipment traffic, the top of the dam and the spillway have been damaged. Need to re -shoot the elevation and repair and re -seed these areas. To re -check during routine inspection this fall. 'The top of the dam was not designed to be a travel road for the equipment. No gravel may be applied to the top of the dam. 16. The OIC wishes to use irrigation to assist with lowering the -waste level in the waste pond. This method of application is NOT a currently approved method of application for this farm. The waste plan states that broadcast (solid spreader, slurry tank, or drag line) is the only approved method of application. Need to obtain approval from technical specialist prior to using irrigation to apply waste. ""Items to check as a follow-up during next compliance inspection: - Soil test results that were due in 2017. Technical specialist MUST have these to complete revision of waste plan. Current permit is for 600 milk cows and 100 heifers. There are approximately 1000 heifers on site so the waste plan needs to be updated ASAP (see 2016 inspection). - Calibration of waste application equipment (2016, 2017 inspections). - Check February 2017 waste analysis report. Parlor pipe extended onto sand lane past the ditch (2016, 2017 inspections). Install curbing to contain waste near wet/dry stack #2 (2016, 2017 inspections). page: 2 Permit AWC860010 Owner- Facility: Maple Ridge Dairy Inc Facility Number. 860010 s Inspection Data: 08/07/18 Inpsection Type: Structure Evaluation Reason for Visit: Emergency Waste structures Dlslgnsted Observed Type Identifier Closed Date Start Date Freeboard Freeboard Waste Pond LARGE (NEW) WSP 02/16/07 6.00 Waste Pond WASTE POND 11/21/13 Stack Fet WET STACK 91 07/22/16 Wet Stack WET STACK #2 page: 3 Permit: AWC860010 Owner - Facility : Maple Ridge Dairy Inc Facility Number: 860010 Inspection Date: 08/07/18 Inppection Type: Structure Evaluation Reason for Visit Emergency, Discharges &Stream Impacts Yea No No No 1. Is any discharge observed from any part of the operation? ❑ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ M ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) M ❑ ❑ ❑ c. What is.the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 0 ❑ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? 0 ❑ ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the Cl ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No No Ne 4. Is storage capacity less than adequate? 0 ❑ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ 01113 trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? 0 ❑ ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ M ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require 0 ❑ ❑ ❑ maintenance or improvement? Waste Application Yes No No No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ ❑ ❑ 0 If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 4 � y Permit: AWC860010 Owner - Facility : Maple Ridge Dairy Inc Facility Number: 860010 Inspection Date: 08/07/18 Inpsection Type: Structure Evaluation Reason for Visit: Emergency Waste Application Yes No Na No Crop Type 1 Sorghum, Sudex (Sllage) Crop Type 2 Fescue (Hey) Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ ❑ 0 ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ E ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ E ❑ ❑ page: 5