HomeMy WebLinkAbout860010_Plan of Action_20180806TiLd- i 2-019 02-,,
z
PPLAN OF CT. I O-M PoA) for -,14116 H, WIL AM MILS;
- . A, IN STRUCTURES ATAMMAL FACILITIES.
.DW.R,'JCpnt' ',.Name.* "MWII,�Sa RiDsebro& W. _ -pq, " I- I Is
List th --W., st ,current- v---a leve s, as - `measured ewa. e"A r
lowestpoinLonth616p ddmlorsruetutds without ways;"Aha f
dVej..n',
the
ttirktUt6 he bdttoffi.-.ofthe�s , pllfwtf I y'� f of I ar I ul d dreg WM spillways: Also, lift -the 'q'-U
in inchesi above lhe. maximum liquid'marO (also called "Ystart, pump"):
%N0.4re Name/I.D.
SO I —,if wa- y- yes or Waste LeV.60 (inches)':
Above MpxIMum-t'jqujd Markb, inc e
$tWctor*7, . $tructure 3 structure A
I& No
1-39"
Is, oa uMp 0 91Y 0)- `iqg,qr, io�s orn no ,
t4rari ath1k, Factors
2'.. Brief'summar,,Y'(Oate,,type,and ,',,amount) of'prbciphigh ,it4tion�events.�contributing:to-hI waste -level-
,
rath." day period.;
I, date and'quantity .., waste, ,,q ky-o��' -ht�tookaton d'veh-t
7[i7/181-501,000-om gallon
�4, Perth* d-.Animal "WOstonAgme1 t PI4n �A -MP-),howI"s:an!M j-Wqfteland-a p pli d
your facility 4-gi, solid er,irrigation, s !ika,d .honey wagon, slurry truck)?'
Haney UVagon;
E fit ibriof.wti;tcimiib6aeniciiitS%oit-,Oni
VA
,
5, lfappficablej haye1hegatile: lot and barnsbOen inspected for leaking inant?"Haverepaim bee-k
fi. If'applicable, is there enough guttering on the barns to -exclude fresh water bom the waste.
structure? if not, when: arei nstallati-on'. or repairs to be made? YES,
High : Waste LeV61 PQA F&ffiAU920I8
"N
7. ift"cture,-lunctioning., rope�.ar!d*xqfudirvg.,afj
l'aoolkablejs-thiiAIV iffldW bkbUhd;t-h Vww "a"' e, p
fregh water irdith the AW YES
41-11-111-11 --ate, C 6 th
methods, Wtftd!?�b Owrib, t t exclude it.� rom:su Mce,; m er
9CM c
tet ritfolh (4,alt hat application 64 ldt&'Oaftw4
p jto me
Proposed-Sinit
9. d AK, 14 .0, ieatidi*-�ip-m-e-htmi-e-a-ts ow.nin
-0 moisture,'
"*eofticabi[('W'4 Adebst th- soil, ,sot s a e t o,� sort aPPic4tidrwithout Wrdff,00pf - tton
fields
662eil AM a6 tl)So imo . A ready for hi lr*,
40, Olven -op imam'soil ;ardweather cor&&Iohs-, what the ear6a p05-s'ibl"ed,atethat tan ap -kw6h,
could ". W W 0 A C e M 0
11. D� o you havea waste analysis obtill000 hih" Ooys�,Qj pl(
1 iI ' -,
12. Lit fbqdd receiving 000691WifidbMij� and total,acreage. Do.,alI'the :prop
osed,
fidldsha an available ba
lance w-thichlo receive additional ariltnal-waste?
,
S If grain Week of 1tso.-acre5-
1S, Is stt 'b#pufn 'pe,&oind ui
voiumroow PAID ,, the wastiwlo u fialotd&'At well Mthe W th - lbt d
hWhWhiftlItt, hUM6ef:df ladfe�sl e"'Idle"ivin't" d" to" p"Ahfo,"r, t*jA i6h, etc. - Q Dnt;tq,,,;n tow rer,;110'OVW from,.
VVIA66. WateOR ur ioitditirisftr of waste to-lal.site not covered hi - the fad iwi
c6rfified-animal',,was'te,manageMqptp4
_. - .' - , , . , .. __ _ j r1r. .
�(`,terobyverdfv ifigul have reviewed-lhe iWfo in-afonlisted move,, -and tdthe,6at;0 i"wjedia
itoldo-inWil the hiWme'-d-tid"'n' W----a" c'c'uM`t0,A""n"dvb rest.
Dam.
P.adiiiVOwrter/Ma""eir(signatuye)
Nigh
W S, Lill
'_
g201.18.