HomeMy WebLinkAboutWM0501366_Final Permit_20190724 (2)ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Metro Food Mart 2270 N Garnett Street Henderson, NC 27536 NORTH CAROLINA Environmental Quality July 24, 2019 Subject: Monitoring Well Construction Permit # WM0501366 Metro Food Mart Henderson, NC To whom it may concern: In accordance with the application received on July 22, 2019, we are forwarding herewith Monitoring Well Construction Permit No. WM0501366 dated July 24, 2019, issued for the construction of a monitor well system (installation of one monitoring well) at the subject property. Please be aware that some counties have well construction programs, and yo may be required to obtain a well construction permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the conditions and limitations as specified therein. Please note the addition of stipulation #3 to the permit enclosed. Sincerely, ;CtBolich, L.G. Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure cc: RRO Files Vance County Health Department DE � North Carolina Department of Environmental Quality I Division of Water Resources N i CARCLItQl ... Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 rlmem oT nvNonmentM uuru y� 919.791,4200 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Metro Food Mart FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM (Metro Food Mart) consisting of a monitoring well system (one (1) Type II monitoring well) owned by Metro Food Mart at mailing address 2270 N Garnett Street, Henderson, NC 27537. The monitoring well will be located at 2270 N Garnett Street, Henderson, NC 27537 (PIN 0030 02005A). This Permit is issued in accordance with the application received on July 22, 2019 which is filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of the completion of drilling of the borehole. Permit issued the 24 h of July 2019 FOR THE NORTH CAROLINA ENVIRO MENTAL MANAGEMENT COMMISSION Rick Bolich, L.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. WM0501366 DE North Carolina Department of Environmental Quality I Division of Water Resources 4NORT�HGARCiU., Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 �� �/ uwmm.m of Enw`romn.ntal Oupltty\919.791.4200