Loading...
HomeMy WebLinkAboutSW6190504_Basin sizing and Drawdown Calculation_7/22/2019Infiltration Basin Sizing Summary Hoke County Cooperative Extension office Building 633 East Balmer Street Infiltration sized per NC DEQ Minimum Design Criteria (MDC) Section C-1. Infiltration Basin 1 Drainage Area: 0.91 ac Built Upon Area (BUA): 0.58 ac RV=0.05+0.9xIA IA = 0.64 RV = 0.05 + 0.9 x 0.64 = 0.63 Design Volume DV = 3630 x RD x RV x A RD = 1.0" RV = 0.63 A = 0.91 ac DV = 3630 x 1.0" x 0.63 x 0.91 ac — 2,081 cu ft Surface Area SA = FS x (DV X 12 / K x T) FS=2 DV = 2,081 cu ft K = 2.0 in/hr T = 72 hours SA=2x(2,081 CFx 12 / 2.0 x 72) = 347 SF (2,937 SF Provided) Draw Down Calculations Infiltration Basin 1 Design depth = 0.70in = 8.40 inches Infiltration Rate = 2 in/hr Factor of Safety = 2 8.40 inches / I in/hr = 8.4 hours Infiltration Basin 2 Drainage Area: 1.17 ac Built Upon Area (BUA): 0.69 ac RV=0.05+09xIA IA = 0.59 RV = 0.05 + 0.9 x 0.59 = 0.59 Design Volume DV=3630xRDx RVxA RD = 1 A" RV = 0.58 A= 1.17 ac DV = 3630 x 1.0" x 0.58 x 1.17 ac = 2.463 cu ft Surface Area SA—FSx(DV X12/KxT) FS=2 DV = 2,463 cu ft K = 2.0 in/hr T = 72 hours SA = 2 x (2,463 cf x 12 / 2.0 x 72) = 411 SF (3,172 SF Provided) Draw Down Calculations Infiltration Basin 2 Design depth = 0.78in = 9.36 inches Infiltration Rate = 2 in/hr Factor of Safety = 2 9.36 inches / 1 in/hr = 9.36 hours