Loading...
HomeMy WebLinkAbout20190090 Ver 2_U-5827 REVISED Wetland and Surface Water Impacts Permit Drawing 8 of 8 dated 07162019_20190723WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands ac Temp. Fill In Wetlands (ac) Excavation in Wetlands ac Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design ft 1 31+92/33+61 -L- Roadway Cut 0.12 0.03 2 36+53/37+84 -L- Roadway Cut/Fill 0.03 0.10 0.07 3 26+32/26+42 Rip Rap at Embankment < 0.01 < 0.01 15 19 TOTALS': 0.03 0.22 0.10 < 0.01 < 0.01 15 19 0 *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09