June 27, 2019
LETTER OF APPROVAL
City of Fayetteville PWC
Joseph Glass, Engineering Manager
955 Old Wilmington Rd.
Fayetteville,NC 28301
RE: Project Name: Fayetteville Annexation Phase V Project X Const.Area 23 Sec I
Acres Approved: 7.78
Project ID: CUMBE-2019-174
County: Cumberland, City: Fayetteville
Address: Beta Street
River Basin: Cape Fear
Stream Classification: Other
Submitted by: David Vaughn
Date Received by LQS: June 4, 2019
Plan Type: Municipal
Dear Mr. Glass:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of
any land disturbing activity on the above-named project. The NOI form may be accessed at
de .nc: ov NCGO1. the NOI form to Annette Lucas at Annette.lucas ncdenr. ov or Paul Clark at
Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, a $100 fee will soon be charged annually.This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
North Carolina Department of Environmental Quality I D:Msion of Energy,Iviirieral and Land Resources
�IDEQ Fayetteville Regional office € 225 Green Sheet.Suite'T14 Fayetteville.North Carolina 28301
Vua
8,3ua�on:::ncE e::�.:::enso:na�Ery 91(7.433:330(3
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be Dept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter.gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office
may require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations,and rules.In addition,local city or county ordinances or rules may also apply to this
land-disturbing activity.This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land-disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee.In addition,it would be helpful if you notify
this office of the proposed starting date for this project.Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
�1n, r3C
Chris Baker
Assistant Regional Engineer
DEMLR Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: David Vaughn, P. E., P. L. S., Moorman, Kizer& Reitzel, Inc. —electronic copy
David Steinmetz, City of Fayetteville Permit Office—electronic copy
David Winstead, City of Fayetteville Permit Office electronic copy
Fayetteville Regional Office