Loading...
HomeMy WebLinkAboutNCG140432_NOV_20190712ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director CERTIFIED MAIL RETURN RECEIPT REQUESTED NORTH CAROLINA Environmental Quality July 12, 2019 7003 2260 000135512201 Blue Dot Readi-Mix, LLC — Monroe Plant Attention: Paul Cochrane, Tony Griffin, and Scott Griffin - Owners 11330 Bain School Road Mint Hill, North Carolina 28217 Subject: NOTICE OF VIOLATION (NOV-2019-PC-0502) Blue Dot Readi-Mix, LLC — Monroe plant NCG140432 1705 Morgan Mill Road Union County Dear Sirs: DENR-LAND QUALITY STORMIWATER PER(t';s` s "i ING On June 26, 2019, NCDEQ staff inspected the subject facility for compliance with Stormwater General Permit NCG140000. Please see the attached inspection report. As a result of the site inspection, the following permit violations are noted: 1) Part IV, Section A: Stormwater Discharges - Analytical Monitoring Requirements a) The benchmark limitation of between 6 and 9 for pH was exceeded at outlet #1 with a result of 9.1 and at outlet #2 with a result of 10.1. The permittee failed to conduct a Tier One response for pH. The benchmark values are not enforceable permit limits. An exceedance of a stormwater benchmark value is not a permit violation; however, failure to respond to the exceedances as outlined in this permit is a violation of permit conditions. b) The benchmark limitation of 100 mg/1 for TSS was exceeded at outlet 41 with a result of 270 mg/l and at outlet #2 with a result of 420 mg/l. The permittee failed to conduct a Tier One response for TSS. The benchmark values are not enforceable permit limits. An exceedance of a stormwater benchmark value is not a permit violation; however, failure to respond to the exceedances as outlined in this permit is a violation of permit conditions. Required Response: Accordingly, you are required to respond to this letter in writing within 15 calendar days of receipt of this Notice. Your written response should include a reasonable explanation as to why the aforementioned violations occurred, as well as a Plan of Action to prevent the +.�;J\�j�I1:7fi}t Cari:lllt'121 I7L'§}c1S'itY1f`.711 f.)f E=,A7VI7'U[7ti'ECC)#;aI Cticllli'jt DlYt51611 QI' E.rtC'ryy, Mineral and (.ar7c2 Resources J .rwwRn " .1! Mlrant•ta villt� Rt�nic�na} ()i'f it't� 1 1 MttnrtacviW- Unrih C—Ai— ?AIM Blue Dot Redi-Mix, LLC Notice of Violation July 12, 2019 Page 2 of 2 violations from recurring. The Plan of Action should evaluate operational changes that can be implemented to prevent future offsite impacts from the facility. Your response should be sent to this office at the letterhead address. Thank you for your attention to this matter. The violations, as detailed above, are required to be properly resolved. This office is considering sending a Recommendation for Enforcement to the -Director of the Division of Energy, Mineral & Land Resources regarding these issues. The degree and extent of harm to the environment, and the duration and gravity of the violations will be considered in any civil penalty assessment process that may occur. Your above -mentioned response will also be considered in any such process. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000 per day for each violation. Should you have any questions regarding this matter, please contact James Moore at (704) 663-1699 or me. Sincerely, O Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Attached: Inspection Report cc: Central Office Stormwater Permitting Program Permit: NCG140432 SOC: County: Union Region:. Mooresville Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 Owner: 1703/1705 Morgan Mill Road LLC Effective: Expiration: Facility: Blue Dot Readi-Mix - Monroe CLRS 1703/1705 Morgan Mill Rd Monroe NC 281103642 Contact Person: Trey Lowder Title: Directions to Facility: From MRO Travel Hwy 3 S turn right onto Odell School Rd access 1-85 S via Poplar Tent Rd. From 1-85 S Take 1485 toward Matthews exit onto Hwy 74 East to Monroe turn left onto Morgan Mill Rd. .System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/26/2019 Entry Time: 12:30PM Primary Inspector: Lily C Kay Secondary Inspector(s): Phone: 704-301-5600 Phone: Exit Time: 01:15PM Phone: 704-663-1699 Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140432 Owner - Facility: 170311705 Morgan Mill Road LLC Inspection Date: 06126/2019 Inspection Type: Compliance Evaluation Reason for Visit: follow-up Inspection Summary: A NOV is being issued with this inspection report for failing to conduct Tier 1 monitoring for the facility once benchmark limitations have been exceeded. TSS was 420 mg/I and pH was 10.1 for outlet 2 and TSS was 270 mg/l, and pH was 9.1 for outlet #1 on the November 15, 2018 sampling event. A Tier 1 response was not conducted within two weeks of the receipt of the analytical results. If you have any questions, please contact me at Lily. Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 3. 1 Permit: NCG140432 Owner - Facility:1703/1705 Morgan Mill Road LLC Inspection Bate: 0b/Zb/Z019 Inspection type : Compliance Evaluation Reason for Visit: Fulluw-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (LISGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? . ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? . ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® ❑ ❑ ❑ # Does the Plan Include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ®❑ ❑ Comment: No Tier 1 response when benchmark limitations were exceeded. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Analytical montiorinq was not reviewed at the previous inspection because the documents were not at the facility. Upon receipt of the laboratory results, another inspection was conducted to assist the facility with the requirements of the Tier 1 response. The benchmark limitations were exceeded for pH and TSS at both outlets in November of 2018 and no Tier 1 response was conducted. Page 3 of 3