HomeMy WebLinkAbout20080737 Ver 11_U2519AAAB_Wetland_Impact_Summary_20190612_20190712WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS I Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -FLYBD- 20+10 to 23+24 ROADWAY FILL 0.57 0.04 2 -Y4- 24+18 to 26+65 ROADWAY FILL 0.03 0.06 3 -L- 30+88 to 31 +69 54" RCP - IV < 0.01 0.02 0.03 < 0.01 300 43 4 -L- 36+56 to 37+03 36" RCP - III < 0.01 < 0.01 78 35 5 -L- 38+17 to 38+93 60" CMP PIPE REMOVAL 0.01 < 0.01 31 6 -L- 37+55 to 44+55 ROADWAY FILL 2.20 0.28 8 -L- 75+02 to 79+96 2 @ 8' x 7' RCBC 1.93 0.03 0.11 0.11 0.08 0.01 518 85 BANK STABILIZATION < 0.01 35 9 -L- 85+99 to 89+87 30" RCP - III 0.08 0.02 525 101 10 -L- 97+22 to 99+80 ROADWAY FILL 0.05 0.01 445 110 12 -L- 115+50 to 123+12 ROADWAY FILL 0.10 0.04 522 232 13 -L- 123+72 to 123+74 ROADWAY FILL 0.06 < 0.01 736 19 BANK STABILIZATION < 0.01 44 14 -L- 168+35 to 173+74 72" RCP 0.11 < 0.01 515 42 BANK STABILIZATION 0.03 125 15 -L- 248+32 to 248+51 DITCH RIP RAP < 0.01 < 0.01 < 0.01 35 BRIDGE 0.05 WORKBRIDGE 0.01 30 16 -L- 256+22 to 256+64 LT ROADWAY FILL 0.06 0.01 0.01 17 -L- 257+79 to 258+87 ROADWAY FILL 0.15 0.02 18 -L- 261 +09 to 262+60 8'x6' RCBC 0.50 0.09 19 -L- 263+85 to 267+61 ROADWAY FILL 1.55 0.14 0.17 20 -Y1- 31 +39 to 31 +80 ROADWAY FILL 0.06 0.03 21 -Y1- 65+90 to 67+57 ROADWAY FILL 0.20 0.07 TOTALS*: 1 7.27 0 0.18 0.89 0.20 0.51 0.12 3674 728 0 *Rounded totals are sum of actual impacts NOTES: Bank stabilization impacts not included in totals (Site 8, Site 13, Site 14) Site 7: Eliminated; No Impacts Site 11: Eliminated; No Impacts Site 16: Wetlands will be total take of .0891 AC Site 19: Wetlands in this area will add an additional area of .5189 AC (as noted on plans) Revised 2018 Feb