Loading...
HomeMy WebLinkAboutNCC190924_NOI Application_20190711 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 7/11/2019 11:31:50 AM(NCG01 NOI Submission) Approve by Morman,Alaina 7/11/2019 12:07:54 PM(Review-Construction NOI 13332) • Morman,Alaina reassigned the task to Morman,Alaina 7/11/2019 11:46 AM • The task was assigned to Clark, Paul by round robin distribution 7/11/2019 11:32 AM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:July 15,2019 5:00 PM 7/11/2019 11:31 AM Submit by Morman,Alaina 7/11/2019 12:09:00 PM(Payment Verification-NCG01-2019-0924) • The task was assigned to Morman,Alaina.The due date is:July 12,2019 5:00 PM 7/11/2019 12:08 PM 1 sees �' � ••. -• i •• i i• i IY sell NORTH CAROLINA Ernvlronmental QUII A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Windfall Lots 63, 34 and 42 2. County* Chatham 3. Highway or Street 68 Wafting Lane, 718 Windfall Creek, 102 Pennington Address* Street narra only is acceptable if no address nurrber assigned yet 4. City or Township* Chapel Hill 5. State* NC 6.Zip Code* 27517 7. Latitude* Enter the latitude in decirral degrees 35.7434 8. Longitude* Enter the longitude in decirral degrees(MIST be negative) -79.0574 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/26/2019 Estimated Construction Project Start Date 10. Date to End* 11/30/2019 Estimated Construction Project End Date 11. SIC(Primary)* Residential, Single Family Houses(SFE) (1521) Standard Industrial aassification for Developrrant 12.Acres to be 2.69 disturbed* (including off-site borrow and waste areas) 13.Total site area 21.48 (acres)* 14. Post- 0.47 construction (Estimated) impervious area (acres)* NCC Project NCC-CHATH-2019-Windfall Lots 63, 34 and 42 Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Windfall Branch Waterbody* Nbrre of waterbody into which stormvwater runoff will discharge 15b.Waterbody 16-41-9-(1) Index No.* NCWaterbody Index Nimber Stormwater r No discharges will flow pr Yes to additional wate rs* 15c.Additional Parkers Creek Receiving Waterbody narre Waterbody 15d.Waterbody 16-41-8-(1) Index No. NCWaterbody Index Number 15e.Additional Waterbody narre Receiving Waterbody 15f.Waterbody NCWaterbody Index Namber Index No. 16a.Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information-Legally Responsible Entity and Individual ..................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization The Drees Company Name* 2. First Name* Jerry ff Corporation,enter Registered Agent First l\b e 3. Last Name* Dean ff Corporation,enter Registered Agent Last Barre 3b.Title Division President 4. Permitee E-mail Imartin@dreeshomes.com Address* 5. Permittee 919.256.5432 Telephone No.* 6. Permittee Mailing Street Address Address* 7701 Six Forks Road Address Line 2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27615-5050 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 7701 Six Forks Road Address Line 2 City State/Province/Region Raleigh NC Pastal/Zip Code Country 27615-5050 US C. Site Contact Information Part C. Project Site Contact Inforrration ............................................................................................. 1.Type of Individual Ownership* 2. Primary Site Kevin Contact-First Name* 3.Primary Site Brantley Contact-Last Name* 4.Title 5.Site Contact E- kbrantley@dreeshomes.com mail Address* 6.Site Contact 919.417.3144 Telephone No.* 7.Organization Name 8.Site Contact Street Address Mailing Address* 7701 Six Forks Road Address Line 2 City State/Province/Region Raleigh NC Wstal/Zip Code Country 27615-5050 us D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Ran Approval Information ....................................................................................................................................................................................................................................... ............................................................................................. 1. Date E&SC Plan 07/08/2019 Approved* 2. E&SC Plan Project 2019-05610 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Chatham County Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan RGA 255,256,260 erosion approval letter.pdf 89.95KB Approval Mist be RDFforrrat letter/documentation 6. NOI Certification RGA 255,256,260 revised NCG01.pdf 515.64KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B(1)provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important:The person who signs this Certification above and signs the NOI Certification Form should be the same person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* Jerry Dean Title Division President Organization The Drees Company Date* 07/11/2019 F. Tracking and COC Info NOI Tracking No. 13332 NC Reference No. NCG01-2019-0924 Uses'count number variable(incremented by SP) Certificate of NCC190924 Coverage (COC) Uses'count_nunber'variable(incremrented by SF) No.* Count Number 924 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed(used to assign YY digits after"NGC'in OOCno.)