Loading...
HomeMy WebLinkAbout310582_Plan of Action_20180927�'- 2,7 -1 � )_0lSO �2_,, 660 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name 31-582 RDS Farms County: Duplin Certified Operator Name: Ronnie Sholar Operator Number: AWA 19695 1.,, Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2 N 17 2. Check all applicable items 31- 5-6-Z Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year-24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation - *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/22/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ronnie Sholar Phone: Facilityii Owner/Manager (print) r Am fj ,o d a -"' V-,� 6i� Date: 9/26/18 Facility Owner/Manager (signature) (�- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period l 17.0 inches 19.5 inches 2.5 inches 57408 fe 89461 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 71210.7 ft3 h. current herd # 950 certified herd #1 2160 actual waste produced = current herd # x line g = 31320 ft3 certified herd # i, volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 35245 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 82984 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/181 1 1,34 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 231.1 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. ` (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21/00 II. TOTAL POUNDS, OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR l24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: line m = lb PAN 2. Structure ID: Lagoon 2 line m = 231.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1+2+3+4+5+6= 231.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ no NOT LIST FIFI _❑S TO WHICH PAN CANNOT RF APPI IF❑ n11RINA THIS 3n nAY PFRIOn o. tract # ' p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 7b sm gr 3.00 19.26 57.8 Sept -Mar 7a sm qr 4.411 17.69 78.0 Sept -Mar 8 sm gr 4.211 31.11 131.0 Sept -Mar r 'State current crop ending applicabon date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 266.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 231.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 266.8 lb. PAN y. Overall PAN balance (w - x) _ -36 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, Mr. Sholar's lagoons were in compliance, with 43" freeboard on lagoon 2. Mr. Sholar was able to be well into compliance despite abundant and frequent rainfall in July and August - Mr. Sholar recorded 10.7 inches of rain in July and 7.1 inches of rain in August. During the storm, rain entered the houses through the opened curtains (curtains were lowered as a precaution of electrical failure) and was therefore moved to the lagoon in addition to rainfall directly falling into the lagoon. Mr. Sholar recorded 20.5 inches of rain from this tropical system over four days time including one 25-year, 24-hour storm on Friday, 9/14/18. Mr. Sholar was able to irrigate on 9/22/18 after initial notification to the inspector on 9/20/18. Mr. Sholar notified the inspector on 9/24/18 that both lagoons were at 20 inches of freeboard. PoA (30 Day) 2/21100