Loading...
HomeMy WebLinkAboutNCS000548_Tiered Response Notice Letter_20181227December 20, 2018 Attention: Mr. Zahid Khan NC Dept. of Environmental Quality - Mooresville Regional Office Division of Energy, Mineral and Land Resources 610 East Center Ave. Suite 301 Mooresville, NC 28115 DUKE ENERGY CORPORATION Marshall Steam Station 8320 East NC Highway 150 Terrell, NC 28682 RECEIVED OENR-OEMLR Land Quality Section Mooresville Regrional rm. Subject: Duke Energy Carolinas, LLC NPDES Industrial Stormwater Outfall SWO08 Tier Status Notification Marshall Steam Station - NCS000548 - Catawba County Dear Mr. Khan: In accordance with the NPDES Industrial Stormwater Permit NCS000548 (effective May 15, 2015), Marshall Steam Station is submitting this notification of Tier Three status for the permitted stormwater outfall SWO08. This notification is submitted within 30 days of receipt of the most -recent laboratory analytical results for this outfall. Specifically, results from samples collected at outfall SWO08 for analysis of total suspended solids (TSS) have been reported above the permitted benchmark of 100 milligrams per liter (mg/L) for four events since issuance of the current permit. A summary of sampling dates and analytical results is provided below: Outfall Sampling Date Analytical Results Received Reported TSS (mg/L) 12/14/2015 01/07/2016 380 06/27/2016 07/13/2016 160 06/22/2017 07/06/2017 220 11 /18/2018 11 /29/2018 110 - Outfall SWO08 consists of one catch basin that drains a small paved area along a narrow driveway east of the Powerhouse. Potential sources of TSS to outfall SWO08 may have included episodic vehicle tracking from unpaved driveway and parking areas located south of the Powerhouse. Previous mitigation measures have included placement of filters around and inside the catch basin as well as routine sweeping of drainage area. www.duke-energy.com DUKE ENERGY CORPORATION Marshall Steam Station 8320 East NC Highway 150 Terrell, NC 28682 Since receipt of the Year 4 Period 1 analytical results for Marshall, the unpaved areas south of the Powerhouse have been paved and a significant reduction in tracking from these areas is anticipated. Marshall will continue to manage and maintain the good housekeeping program for this outfall in accordance to the station's Stormwater Pollution Prevention Plan. If you have questions or need additional information please contact Brad Loveland at (704) 609- 5637 or brad.loveland@duke-energy.com. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sincerely, �,f 1,�Ox Rick R. Roper General Manager III Marshall Steam Station attachment www.duke-energy.com DUKE ENERGY CORPORATION Marshall Steam Station 8320 East NC Highway 150 Terrell, NC 28682 be w/attachment: Scott La Sala Brad Loveland Tina Woodward File: CCP EHS UPS Tracking Number 1Z8955X40395659551 Raleigh Central Office www.duke-energy.com