Loading...
HomeMy WebLinkAbout20190616 Ver 1_Approval Letter_20190708ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director July 8, 2019 Shenandoah Homes, LLC Attn: Zach Daugherty 3724 National Drive, # 220 Raleigh, NC 27612 NORTH CAROLINA Environmental Quality D.WR #19-0616 Wake County Subject: APPROVAL OF 401'WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES; (15A NCAC 02B .0233) WITH ADDITIONAL CONDITIONS Milburnie Ridge Dear Mr. Daugherty: You have our approval for the impacts listed below for the purpose described in your received by the Division of Water Resources' (Division) on May 7, 2019 and with payment received on May 13, 2019 with additional information received on July 3, 2019.. These impacts.are, covered by the attached Water Quality General Certification Number.4139 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed. certification and the following additional conditions: 1. The following impacts are. hereby approved provided that all of the other specific and general conditions of the Certification and Buffer Rules are met. No other impacts are approved, including incidental impacts: [15A NCAC 02B .0506(b)(c) and 15A NCAC'02B .0233(8)] Norlh Carelhia Department of tluaMy Division of LL'tier Resources �D .. . _ ... a i>t�Iz inti 1�i lirrial Of —key :3600 Barre t Drive I € iild ii, North Caro iria 2-1609 asdnr)�,�ni n �wiru,3,�s,�sv u�t� 919,79L4 .200 Milburnie Ridge DWR #19-0616 401 AND BUFFER APPROVAL Page 2 of 4 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream S1: Road Crossing- Construction Activities 0 (linear feet) 42 (linear feet) S2: Road Crossing 80 (linear feet) 0 (linear feet) S3: Road Crossing- Construction Activities 0 (linear feet) 48 (linear feet) S4: Road Crossing 69 (linear feet) 0 (linear feet) Buffers —Zone 1 131: SCM Discharge Outlet 191 (square feet) 0 (square feet) 132: Road Crossing 7,560 (square feet) 0 (square feet) 133: SCM Discharge Outlet 710 (square feet) 0 (square feet) 64: SCM Discharge Outlet 906 (square feet) 0 (square feet) 135: Road Crossing 5,676 (square feet) 0 (square feet) 136: Greenway Trail 348 (square feet) 0 (square feet) Buffers — Zone 2 131: SCM Discharge Outlet 492 (square feet) 0 (square feet) 62: Road Crossing 4,713 (square feet) 0 (square feet) 133: SCM Discharge Outlet 495 (square feet) 0 (square feet) 64: SCM Discharge Outlet 509 (square feet) 0 (square feet) 135: Road Crossing 2,227 (square feet) 0 (square feet) 136: Greenway Trail 1,473 (square feet) 0 (square feet) Stormwater Management Plan (SMP) Approval from Local Community Required The stormwater management plan (SMP) must be approved by the City of Raleigh and meet the requirements of this Certification. The SMP may not be modified without prior written authorization from the City of Raleigh. [15A NCAC 02H .0506(b)(3)] 3. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, Milburnie Ridge DWR #19-0616 401 AND BUFFER APPROVAL . Page 3 of 4 eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case-by-case basis. 4. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to. infringe within the !buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2') and 15A NCAC 02H .0507 (c)] 5. This approval is for the purpose;and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all.conditions. [15A NCAC 02B .0507(d)(2)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 This Certification and Buffer Authorization can be contested as provided in General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty.(60) calendar days. A petition form may be.obtained from the OAH at http://www.ricoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between &00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any, applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. . Mailing address for the OAH: If sending by First Class Mail . If sending via delivery service via the US Postal Service: (e.g. UPS, FedEx): Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Milburnie Ridge DWR #19-0616 401 AND BUFFER APPROVAL Page 4 of 4 Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR —401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins Supervisor, 401 "uffer rmitting Branch Enclosure: GC 4139 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Dr., Ste. 105; Wake Forest, NC 27597 DWR RRO 401/Riparian Buffer file DWR 401 & Buffer Permitting Unit via Laserfiche Deborah Shirley via e-mail at dshirleyPsandec.com