Loading...
HomeMy WebLinkAboutNCC190865_ESC Approval Submitted_20190708 4 y su STAR ROY COOPER y" Governor -' MICHAEL S.REGAN t NanV" k Secretary QMw S. DANIEL SMITH NORTH CAROLINA interim Director Environmental Quality May 17, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Piedmont Natural Gas Attn: Tom Morris, Project Manager 4720 Piedmont Row Dr. Charlotte,NC 27210 RE: Project Name: Piedmont Natural Gas Line 448 Project Acres Approved: 254 Project ID: SAMPS-2019-010 County: Sampson, City: Clinton Address: Stanley Hall Rd. River Basin: Cape Fear Stream Classification: Other Submitted By: Mott MacDonald Date Received by LQS: April 18, 2019 Plan Type: New Dear Mr. Morris: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter ofApproval with Modifications. The Modifications Required for Approval are listed on the attached page. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govINCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially,DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. 1,E North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional Office I225 Green Street.Suite 714 I Fayetteville,North Carolina 28301 910.433.3300 ESN CPROIJNA a pf axnt a F EnH rwmmt+!4u.Rh Letter of Approval Piedmont Natural Gas May 17, 2019 Page 2 of 3 'F r Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be 4 kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. F North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with theAct. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land-disturbance,as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS I I3A-54.1(b)). You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. 3. Sincerely, Jodi Pace,EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval cc: Justin Miner, Mott MacDonald(electronic copy) Myron Cashwell, Building Inspector (electronic copy) DEMLR- Fayetteville Regional Office File i Letter of Approval Piedmont Natural Gas May 17, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Quail Glen- Phase 4B Project ID: HARNE-2019-081 County: Harnett No silt fence is to be installed in the wetlands, wattles are to be used instead. Per G.S. 113A-57(3) Provide a detail, construction specifications and maintenance requirements for the construction Entrance. Per G.S. 113A-57(3), Provide a copy of the 401 permit from the Army Corps of Engineers before any work is done in the wetlands. Provide PDF copies of each revised plan sheets, showing all the Modifications required for approval, prior to beginning any land-disturbing activity. Per G.S. 113A-57(4), 15A NCAC 04B.0118 & G.S. 113A-54(d)(4) I�. ;.