Loading...
HomeMy WebLinkAboutNCC190862_NOI Signed Certification_20190708 0����K�� ��mx�~ ^�� Umn�o��r� �����U� Certification �m^ o�°�*�"�^` .�~°~UK��� ��x u""~.~."~ V.���v� °~v�" ~xum�����oK�K� Form Print this form,complete,scan and upload to the electronic NOL Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral&Land Resources Stormwater Program 512 N.Salisbury Street, 6 th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 Per NCGeneral Statute243-215.6B(i) any person who knowingly makes onyfalsestatement,representation, or certification in any application, record,report,plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include o fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that(check all boxes to indicate your agreement): IR | am the person responsible for the construction activities of this project for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. O0 The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. Q0 | will abide by all conditions ofthe NCGO10000 General Permit and the approved Erosion and Sediment Control Plan, DO if the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan)ofthe NCGO10000 General Permit | will nonetheless ensure that all conditions of Part||of the permit are met un the project at all times. 12 | hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner asan individual permit. Name ofProiacL: Piedmont Natural Gas Line 449 Project Legally Responsible Or8aniiationa|Entity: Piedmont Natural Gas * Legally Responsible Person: Tom Morris Title of Legally Responsible Person: Project Manager / Signature: Date: � * /MPORTAMM'8O7E. This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as o president,secretary, treasurer, or vice president,or manager that is authorized/n accordance with Part IV,Section fl Item(6)qf the N[G) OOODpenn/t. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCGO10000 permit.