Loading...
HomeMy WebLinkAbout20190295 Ver 1_Email_20190506Carpenter, Kristi From: Hood, Donna Sent: Monday, May 06, 2019 11:41 AM To: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA); jtampbandy@gmail.com Cc: Johnson, Alan; Carpenter,Kristi Subject: Re: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) Follow Up Flag: Follow up Flag Status: Flagged Hi Tamp, Based on Dave's response, I think you are getting a NW14. That being the case, please respond to the add info letter I sent you. If you have any questions, give me a call. Thank you, Donna Get Outlook for iOS From: Hood, Donna <donna.hood@ncdenr.gov> Sent: Monday, May 6, 2019 11:30 AM To: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA) Subject: Fwd: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) Get Outlook for iOS From: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA) <David.L.Shaeffer@usace.army.mil> Sent: Monday, May 6, 2019 2:45:12 PM To: Hood, Donna Subject: RE: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report. spa m@nc.gov<mailto:report. spa m@nc.gov> Hi Donna, We are supposed to issue what they request if it meets the terms and conditions of the permit. I assume this does since the only impact is to expand the roadway. If you look at the NWP language there is "District Engineers Decision" section which states: " If a project proponent requests authorization by a specific NWP, the district engineer should issue the NWP verification for that activity if it meets the terms and conditions of that NWP, unless he or she determines, after considering mitigation, that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and exercises discretionary authority to require an individual permit for the proposed activity." Sincerely, David L. Shaeffer Project Manager/Geographer U.S. Army Corps of Engineers Charlotte Regulatory Office Desk: 704-510-1437 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 -----Original Message ----- From: Hood, Donna [mailto:donna.hood@ncdenr.gov] Sent: Monday, May 6, 2019 10:17 AM To: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA) <David.L.Shaeffer@usace.army.mil> Subject: [Non-DoD Source] Re: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) He requested a NW 14 and he mentioned that you thought it should be a NW39. Does that mean you are issuing a NW14 and Ramp is mistaken? Get Outlook for iOS <Blockedhttps://aka.ms/o0ukef> From: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA) <david.l.shaeffer@usace.army.mil> Sent: Monday, May 6, 2019 8:38 AM To: Hood, Donna Subject: RE: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report. spa m@nc.gov<mailto:report. spa m@nc.gov> I haven't issued this yet. I will issue whatever Tamp requested unless it doesn't meet the terms and conditions of that permit. Sincerely, David L. Shaeffer Project Manager/Geographer U.S. Army Corps of Engineers Charlotte Regulatory Office Desk: 704-510-1437 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 -----Original Message ----- From: Hood, Donna [mailto:donna.hood@ncdenr.gov] Sent: Tuesday, April 30, 2019 11:19 AM To: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA) <David.L.Shaeffer@usace.army.mil> Cc: jtampbandy@gmail.com Subject: [Non-DoD Source] FW: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) Hi Dave, Have you already issued this one? I talked with Tamp this morning and he thought it had not been issued. I just wanted to confirm that you are issuing as a NW39 so I can handle it appropriately in the database. Thank You, Donna From: Johnson, Alan Sent: Monday, April 29, 2019 3:21 PM To: Hood, Donna <donna.hood@ncdenr.gov> Cc: 'JTampBandy@gmail.com' <JTampBandy@gmail.com> Subject: FW: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) Donna, I believe this was sent to you. The Corps (Dave Shaeffer) is handling as part of the hotel project. So this will be under a NW 39 (1 assume). If you are going to continue handling that is fine, just let Tamp know, if anything is required. 19 ft of stream would make it below threshold, unless there are other issues. From: Tamp Bandy <jtampbandy@gmail.com <mailto:itampbandy@gmail.com> > Sent: Monday, April 29, 2019 3:15 PM To: Johnson, Alan <alan.johnson@ncdenr.gov<mailto:alan.iohnson@ncdenr.gov> > Subject: [External] Fwd: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov <mailto:report.spam@nc.gov> Alan, Attached is email from Dave. After discussing with him, he was going to review it as hotel project, and not as DOT project. I will forward the additional information that we submitted. Thanks, Tamp Bandy 828-302-3437 Wetlands & Waters, Inc. 4108 LB Propst Drive Conover, NC 28613 jtampbandy@gmail.com <BlockedBlockedhttp://jtampbandy@gmail.com> The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for your cooperation and consideration. ---------- Forwarded message --------- From: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (USA)<David.L.Shaeffer@usace.army. miI <mailto: David. L.Shaeffer(@usace.armv.miI> > Date: Tue, Mar 19, 2019 at 2:42 PM Subject: SAW-2019-00406 Innkeeper Motor Lodge, Inc., WT Harris Blvd. Road Widening (Notice of Incomplete Application) To: Tamp Bandy (jtampbandy@gmail.com <mailto:itampbandy@gmail.com> ) <jtampbandy@gmail.com <mailto:itampbandy@gmail.com> > Cc: Johnson, Alan NCDWR <alan.johnson@ncdenr.gov<mailto:alan.iohnson@ncdenr.gov> >, Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil <mailto:Nicholle.M.Braspennickx@usace.army.mil> >, Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil <mailto:Crystal.C.Amschler@usace.army.mil> > Tamp, On February 27, 2019 we received the application you submitted on behalf of Innkeeper Motor Lodge, Inc. to place fill material in 19 linear feet of stream to facilitate the widening of W.T. Harris Boulevard in Charlotte, Mecklenburg County, North Carolina. I have completed my initial review of the application and I have determined that it is incomplete. The following information is necessary to complete this application: a. In accordance with 2017 Nationwide Permit general condition 32(b)(4), the project description should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory mitigation or other mitigation measures. It appears that the proposed impacts are associated with the construction of a Hampton Inn and Suites. Please submit a complete set of plans and a delineation of the entire project area including the site where the hotel would be constructed. b. In accordance with 2017 Nationwide Permit general condition 32(b)(5), the PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Delineations must be prepared in accordance with the current methods required by the Corps. A delineation report was not submitted with the application. If this is a standalone transportation widening project and not a result of a private hotel development, this should be processed through our NCDOT or CDOT project managers (Cced). Please provide the information requested above in ONE consolidated response within 30-days of the date of this correspondence. If you do not respond within 30-days, the application will be administratively canceled. Please contact me via telephone or e-mail if you have questions. Sincerely, David L. Shaeffer Project Manager/Geographer U.S. Army Corps of Engineers Charlotte Regulatory Office Desk: 704-510-1437 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at BlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 5