Loading...
HomeMy WebLinkAboutNCC190844_ESC Approval Submitted_20190703CITY OF BURLINGTON ENGINEERING DEPARTMENT W. Todd Lainber(, P.1?. City Engineer June 10, 2019 LETTER OF APPROVAL WITH MODIFICATIONS ZP No. 331, LLC 111 Princess Street Wilmington, NC 28401- Subject: Highland Elementary School Access Improvements Bonnar Bridge Parkway Alamance Tax Map: 3-23-326 Permit Number: 649 Dear Jeff Zimmer: The Engineering Department has reviewed the sedimentation and erosion control plans received on 06/03/2019, and find these plans to be acceptable and hereby issue this "Letter of Approval with Modifications" as listed on the attached page. This plan approval shall expire no more than three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Please consider this letter the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be aware that effective April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas@ncdenr. ov or Paul Clark at Paul.ciark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A copy of the Fact Sheet on the New NCG01 Permit enclosed with this letter for your convenience. Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. \ MAIM; .11 IAW,SS �I�IU.I�:I'I ION1(: (336) 222-5050 125 S. H, XIN(;'I'ON .1V1 I .1 : (336) 513-5I67 1WR1.1N(;T( )N, A'(: 27215 1('�r�r'.I�l`RI,ING'1'UNN(:.CU1' Erosion & Sedimentation Control Permit Letter 010/2019 Page 2 or 3 Please understand that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than permitted landfills regulated by the NCDEQ's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. Please be aware that this approval does not supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Please have your contractor notify the Engineering Department, phone number (336-222-5050), to schedule a preconstruction conference so that we may discuss the Erosion Control Plan prior to initiation of construction. Please be advised that the Engineering Department will request a copy of your COC and applicable NCDOT encroachments be submitted prior to the request for a preconstruction conference. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Mr. Zac Lentz Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Mr. Jay Mebane Chief Inspector Sincerely, Brandon Holt, PE Erosion Control Administrator Mr. Richard Baker, PE Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Ms. Carolyn Buckner Environmental Specialist Erosion & Sedimentation Control Permit Letter 6/1012019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL PROJECT NAME: Highland Elementary School Access Improvements LOCATION: Bonnar Bridge Parkway FINANCIAL RESPONSIBLE PARTY: Jeff Zimmer DATE APPROVED: 03/10/2019 1. Silt fence and silt fence outlets shall be installed along the proposed back of sidewalk during grading operations and until vegetation sufficient to retain accelerated has been established. 2. Inlet protection along the curb line shall utilize direction from COB Detail SE-23. 3. Seeding specifications shall comply with COB Detail SE-24. 4. Prior to the commencement of construction a notarized letter from the property owner, Alamance Burlington Board of Education, granting permission to the Financially Responsible Person, Jeff Zimmer, shall be submitted to the office of Brandon Holt, located in the Engineering Department. 5. Prior to commencement of construction an approved NCDOT encroachment agreement shall be submitted to the office of Brandon Holt, located in the Engineering Department. NOTE: Be advised that the above "Modifications Required for Approval' is considered to be a part of the approved plan unless an equally effective alternative is submitted to and approved by this department prior to beginning this land -disturbing activity. All above "Modifications Required for Approval' shall be incorporated into the plans and approved by this department prior to beginning this land -disturbing activity. GTON N- Permit No. 649 BURLINGTON, NORTH CAROLINA w o � 0 CERTIFICATE OF SEDIMENT AND EROSION CONTROL PLAN APPROVAL AND ti �rJ �E$,14 LAND DISTURBING PERMIT Project Name: Highland Elementary School Access Improvements Location: Bonnar Bridge ParkwayPERMIT FEE $225 Tax Map -Block -Lot: 3-23-326 Disturbed Acreage: 0.71 Acres permitted RECEIPT No. 002440-0010 This certificate verifies that an erosion and sedimentation control plan has been approved for this project by the City of Burlington in accordance with the Sedimentation Pollution Control Act of 1973 (NC General Statute 113A Article 4, as amended), the North Carolina Administrative Code, Title 15A, Chapter 4: Sedimentation Control, and the City of Burlington, North Carolina Code of Ordinances, Chapter 31.5: Soil Erosion and Sedimentation Control. A copy of this permit and the approved Erosion and Sedimentation Control Plan must be kept on project site. Per City Ordinance Section 31.5-18 notice is hereby given that agents, officials, or other qualified persons authorized by the City will periodically inspect land -disturbing activities to ensure compliance with the Act, City ordinances, or rules or orders adopted or issued pursuant to the ordinance, and to determine whether the measures required in the Plan are effective in controlling erosion and sedimentation resulting from land -disturbing activity. Financially Responsible Party: Permission to conduct a land disturbing activity is hereby granted by this instrument at Jeff Zimmer, Manager the above location in accordance with the approved Soil Erosion and Sedimentation ZP No. 331, LLC Control Plan and the City of Burlington's Sedimentation Control Ordinance. l I I Princess Street Wilmington, NC, 28401- Reviewer: Brandon Holt, PE Phone (910) 763-4669 Red-istered Aoent: 03/10/2019 This plan was approved with "modifications" 'Yes I INo and / or "performance reservations""Yes No City of Burlington Engineering Department, 425 South Lexington Avenue, Burlington, NC 27215 Phone 336-222-5050 Fax 336-513-5467