HomeMy WebLinkAboutNCC190844_ESC Approval Submitted_20190703CITY OF BURLINGTON
ENGINEERING DEPARTMENT
W. Todd Lainber(, P.1?.
City Engineer
June 10, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
ZP No. 331, LLC
111 Princess Street
Wilmington, NC 28401-
Subject: Highland Elementary School Access Improvements
Bonnar Bridge Parkway
Alamance Tax Map: 3-23-326
Permit Number: 649
Dear Jeff Zimmer:
The Engineering Department has reviewed the sedimentation and erosion control plans received on
06/03/2019, and find these plans to be acceptable and hereby issue this "Letter of Approval with
Modifications" as listed on the attached page. This plan approval shall expire no more than three (3)
years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129. Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided. You are requested to
file an amended form if there is any change in the information included on the form.
The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring
protection of the natural resources and adjoining properties. If following commencement of this
project it is determined that the plan needs to be modified, then this office will require that the plan be
modified to comply with the City's ordinance. Please consider this letter the Notice required by
Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan.
Please be aware that effective April 1, 2019, all new construction activities are required to complete
and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above named project. The NOI form may be
accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette. lucas@ncdenr. ov or Paul Clark at Paul.ciark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A copy of the Fact Sheet
on the New NCG01 Permit enclosed with this letter for your convenience.
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
\ MAIM; .11 IAW,SS �I�IU.I�:I'I ION1(: (336) 222-5050
125 S. H, XIN(;'I'ON .1V1 I .1 : (336) 513-5I67
1WR1.1N(;T( )N, A'(: 27215 1('�r�r'.I�l`RI,ING'1'UNN(:.CU1'
Erosion & Sedimentation Control Permit Letter
010/2019 Page 2 or 3
Please understand that the person financially responsible for conducting this land disturbing activity is
also responsible for borrow material brought onto the site and waste material from the site that is
disposed elsewhere. Separate sites from which borrow material is obtained, and which is not
regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land -
disturbing activity for this site. Separate sites to which waste material is disposed of, other than
permitted landfills regulated by the NCDEQ's Division of Waste Management, shall also be
considered as part of the land -disturbing activity for this site. These off site areas shall therefore be
included and shown on the approved erosion control plan and have the necessary erosion control
measures in place.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. This could include the Division of Water Quality under
storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404
jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be
required. Please be aware that this approval does not supersede any other permit or approval.
Check with the local North Carolina Department of Transportation office to determine if an
encroachment will be needed for any operations on DOT right-of-way. Permits will be required for
driveways.
Please have your contractor notify the Engineering Department, phone number (336-222-5050), to
schedule a preconstruction conference so that we may discuss the Erosion Control Plan prior to
initiation of construction. Please be advised that the Engineering Department will request a copy of
your COC and applicable NCDOT encroachments be submitted prior to the request for a
preconstruction conference.
Your cooperation is appreciated and we look forward to working with you on this project.
Enclosures
cc: Mr. Zac Lentz
Division of Land Resources
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Mr. Jay Mebane
Chief Inspector
Sincerely,
Brandon Holt, PE
Erosion Control Administrator
Mr. Richard Baker, PE
Timmons Group
5410 Trinity Road, Suite 102
Raleigh, NC 27607
Ms. Carolyn Buckner
Environmental Specialist
Erosion & Sedimentation Control Permit Letter
6/1012019 Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
PROJECT NAME: Highland Elementary School Access Improvements
LOCATION:
Bonnar Bridge Parkway
FINANCIAL RESPONSIBLE PARTY: Jeff Zimmer
DATE APPROVED: 03/10/2019
1. Silt fence and silt fence outlets shall be installed along the proposed back of sidewalk during
grading operations and until vegetation sufficient to retain accelerated has been established.
2. Inlet protection along the curb line shall utilize direction from COB Detail SE-23.
3. Seeding specifications shall comply with COB Detail SE-24.
4. Prior to the commencement of construction a notarized letter from the property owner,
Alamance Burlington Board of Education, granting permission to the Financially Responsible
Person, Jeff Zimmer, shall be submitted to the office of Brandon Holt, located in the
Engineering Department.
5. Prior to commencement of construction an approved NCDOT encroachment agreement shall
be submitted to the office of Brandon Holt, located in the Engineering Department.
NOTE: Be advised that the above "Modifications Required for Approval' is considered to be a
part of the approved plan unless an equally effective alternative is submitted to and
approved by this department prior to beginning this land -disturbing activity.
All above "Modifications Required for Approval' shall be incorporated into the plans
and approved by this department prior to beginning this land -disturbing activity.
GTON N- Permit No. 649
BURLINGTON, NORTH CAROLINA
w
o �
0 CERTIFICATE OF SEDIMENT AND EROSION CONTROL PLAN APPROVAL AND
ti
�rJ
�E$,14 LAND DISTURBING PERMIT
Project Name: Highland Elementary School Access Improvements
Location: Bonnar Bridge ParkwayPERMIT FEE $225
Tax Map -Block -Lot: 3-23-326
Disturbed Acreage: 0.71 Acres permitted RECEIPT No. 002440-0010
This certificate verifies that an erosion and sedimentation control plan has been approved for this project by the City of Burlington in accordance with the
Sedimentation Pollution Control Act of 1973 (NC General Statute 113A Article 4, as amended), the North Carolina Administrative Code, Title 15A,
Chapter 4: Sedimentation Control, and the City of Burlington, North Carolina Code of Ordinances, Chapter 31.5: Soil Erosion and Sedimentation Control.
A copy of this permit and the approved Erosion and Sedimentation Control Plan must be kept on project site.
Per City Ordinance Section 31.5-18 notice is hereby given that agents, officials, or other qualified persons authorized by the City will periodically inspect
land -disturbing activities to ensure compliance with the Act, City ordinances, or rules or orders adopted or issued pursuant to the ordinance, and to
determine whether the measures required in the Plan are effective in controlling erosion and sedimentation resulting from land -disturbing activity.
Financially Responsible Party:
Permission to conduct a land disturbing activity is hereby granted by this instrument at
Jeff Zimmer, Manager
the above location in accordance with the approved Soil Erosion and Sedimentation
ZP No. 331, LLC
Control Plan and the City of Burlington's Sedimentation Control Ordinance.
l I I Princess Street
Wilmington, NC, 28401-
Reviewer: Brandon Holt, PE
Phone (910) 763-4669
Red-istered Aoent:
03/10/2019
This plan was approved with "modifications" 'Yes I INo
and / or "performance reservations""Yes No
City of Burlington Engineering Department, 425 South Lexington Avenue, Burlington, NC 27215
Phone 336-222-5050 Fax 336-513-5467