Loading...
HomeMy WebLinkAboutNCC190823_ESC Approval Submitted_20190702 T y IZOY COOPER Governor MICHAEL S.REGAN ` .,. Secretary S.DANIEL SMITH NORTH CAROL.INA Director Environmental Quality June 28, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Southern Towers ATTN: Ryan C. Bradley, Project Assistant 250 Signal Mountain Road Chattanooga,TN 37405 RE: Project Name: Verizon Wireless Hwy-218 Cell Site Acres Approved: 1.74 Project 11): ANSON-2019-007 County: Anson, City: Peachland, Address: NC 218 River Basin: Yadkin Stream Classification: Other Submitted By: TeleCAD Wireless Site Design, Inc. Date Received by LQS: May 30, 2019 Plan Type: New Dear Mr. Bradley: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter ofApproval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc.govfNCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@iicdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a$100 fee will soon be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 hFOF[M ChRGLINA ! Oenorment atEmironmmmEpuef� 910.433.3300 Letter of Approval with Modifications Southern Towers June 28,2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land-disturbance,as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �. rode Pace, El Regional Engineering Assistant Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Matt Sayne,TeleCAD Wireless Site Design, Inc. Keith Gaskins, Building Inspector Fayetteville Regional Office file Letter of Approval with Modifications Southern Towers June 28,2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: VERIZON WIRELESS HWY-218 CELL SITE Project ID: ANSON-2019-007 County: Anson Provide two full size copies each of revised plan sheets, showing all the Modifications required for approval,prior to beginning any land-disturbing activity. L I Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities 'F 'r k I i I i i �f