Loading...
HomeMy WebLinkAboutNCC190823_NOI Application_20190702 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 7/2/2019 9:37:43 AM(NCG01 NOI Submission) Approve by Morman,Alaina 7/2/2019 4:45:17 PM(Review-Construction NOI 12999) • The task was assigned to Morman,Alaina by round robin distribution 7/2/2019 9:37 AM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:July 4,2019 5:00 PM 7/2/2019 9:37 AM Submit by Morman,Alaina 7/2/2019 4:47:02 PM(Payment Verification-NCG01-2019-0823) • The task was assigned to Morman,Alaina.The due date is:July 3,2019 5:00 PM 7/2/2019 4:45 PM 1 sees �' � ••. -• i •• i i• i IY sell NORTH CAROLINA Ernvlronmental QUII A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Verizon Wireless HWY_218 Cell Site 2. County* Anson 3. Highway or Street 5853 NC 218 Address* Street narra only is acceptable if no address nurrber assigned yet 4. City or Township* Peachland 5. State* NC 6.Zip Code* 28133 7. Latitude* Enter the latitude in decirral degrees 35.0601 8. Longitude* Enter the longitude in decirral degrees(MIST be negative) -80.2767 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/08/2019 Estimated Construction Project Start Date 10. Date to End* 08/15/2019 Estimated Construction Project End Date 11. SIC(Primary)* Commercial(1542) Standard Industrial gassification for Developrrant 12.Acres to be 1.74 disturbed* (including off-site borrow and waste areas) 13.Total site area 27.00 (acres)* 14. Post- 1.14 construction (Estimated) impervious area (acres)* NCC Project NCC-ANSON-2019-Verizon Wireless HWY_218 Cell Site Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Cribbs Creek Waterbody* Nhrre of waterbody into which stormuater runoff will discharge 15b.Waterbody 13-17-37 Index No.* NCWaterbody Index Pbnber Stormwater r No discharges will flow rj Yes to additional wate rs* 15c.Additional Flag Branch Receiving Waterbody nacre Waterbody 15d.Waterbody 13-17-40-18-1 Index No. NCWaterbody Index Ninber 15e.Additional Waterbody narre Receiving Waterbody 15f.Waterbody NCWaterbody Index Nan-ber Index No. 16a.Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information-Legally Responsible Entity and Individual ..................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Southern Towers, LP Name* 2. First Name* David ff Corporation,enter Registered Agent First l\b e 3. Last Name* Hodder ff Corporation,enter Registered Agent Last Barre 3b.Title Director of Site Development 4. Permitee E-mail dhodder@southern-towers.com Address* 5. Permittee 423-531-6300 ext: 11 Telephone No.* 6. Permittee Mailing Street Address Address* 250 Signal Mountain Road Address Line 2 Suite B City State/Province/Region Chattanooga TN Postal/Zip Code Country 37405-1914 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 250 Signal Mountain Road Address Line 2 Suite B City State/Province/Region Chattanooga TN Pastal/Zip Code Country 37405-1914 us C. Site Contact Information Part C. Roject Site Contact Information .................................................................................................................... 1.Type of Non-Government Ownership* 2. Primary Site David Contact-First Name* 3.Primary Site Hodder Contact-Last Name* 4.Title Director of Site Development 5.Site Contact E- dhodder@southern-towers.com mail Address* 6.Site Contact 423-531-6300 e)d: 11 Telephone No.* 7.Organization Southern Towers, LP Name 8.Site Contact Street Address Mailing Address* 250 Signal Mountain Road Address Line 2 Suite B City State/Rovince/Region Chattanooga Tennessee Rbstal/Zip Code Country 37405 United States D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Ran Approval Information ....................................................................................................................................................................................................................................... .............................................................................................. 1. Date E&SC Plan 06/28/2019 Approved* 2. E&SC Plan Project ANSON-2019-007 Number/ID* Assigned by agency or local program 3. E&SC Plan f•State DEQ Office Approved by r Local Program 4.State DEQ Office* Fayetteville(FRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan NC-014_Hyw 218_Letter of Approval With Approval 78.09KB Modifications_06-28-19.pdf letter/documentation Mast be RDF forrrat 6. NOI Certification NC-014_Hwy 218_Signed NCG01 Notice of Intent Form 62.77KB (NOI)Certification Form_07-01-19.pdf Mast be ROF format This is an Express f•No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important:The person who signs this Certification above and signs the NOI Certification Form should be the same person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* David Hodder Title Director of Site Development Organization Southern Towers, LP Date* 07/02/2019 F. Tracking and COC Info NOI Tracking No. 12999 NC Reference No. NCG01-2019-0823 Uses'count number variable(incremented by SP) Certificate of NCC190823 Coverage (COC) Uses'count number variable(increrrentedbySP) No.* Count Number 823 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed(used to assign YY digits after"NGC'in OOCno.)