Loading...
HomeMy WebLinkAbout20050963 Ver 1_CAMA App_20050622 .' AVA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary June 17,2005 TO: Cyndi Karoly Supervisor rl~~~~j3VArER QUALITY 401 Oversight and Express Permits Unit STORIJlVATERBRAl.'CfI Division of Water Quality-Surface Water Protection m@J@@JllW@J~ JUN ~ ?, 2005 MEMORANDUM: FROM: Jason Dail Express Major Permits Coordinator SUBJECT: CAMA & Dredge and Fill Permit Application Review Applicant: R.A. Development, Inc. c/o Randy Allen for Cannonsgate Subdivision Project Location: OffNC Hwy 24, adjacent to Sanders Bay, Sikes Creek and Bogue Sound, in Ocean, Carteret County. Proposed Project: The applicant is proposing to modify the existing permit by reconfiguring the existing 75-s1ip marina, redesigning a 500 +/- lot residential subdivision with amenities and utilities, installing three (3) observation piers, retaining wall and boat ramp. Additionally, the applicant is proposing to perform maintenance dredging within the existing boat basin, access canal and entrance channel. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 9, 2005. If you have any questions regarding the proposed project, please contact Jason Dail at (910) 796-7302. When appropriate, in-depth comments with supporting data is requested. REPL Y: _ This agency has no objection to the project as proposed. _ This agency has no comment on the proposed project. _ This agency approves of the project only if the recommended changes are incorporated. See attached. _ This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Ext., Wilmington, North Carolina 28405=3840 Phone: 910-796-7302 \ FAX: 910-350-2004 \ Internet: wwwnccoastalmanaqement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: R.A. North Development, Inc. c/o Randy Allen for Cannonsgate Subdivision 2. LOCATION OF PROJECT SITE: OffNC Highway 24, adjacent to Sanders Bay, Sikes Creek and Bogue Sound, in Ocean, Carteret County Photo Indcx - 2000: 39-498 K-N, 9-12 1995: 39-480 A-O, 6-14 1984: 31-1183,1-14, M-21 Statc Planc Coordinatcs - X: 2607070 Y: 353533 GPS File: V-022111A 3. INVESTIGATION TYPE: CAMAID&F 4. INVESTIGATIVE PROCEDURE: Datcs of Sitc Visit - 2111/05,4/29/05 Was Applicant Prcscnt - No 5. PROCESSING PROCEDURE: Application Rcccivcd - completed 6/15/05 Officc - Wilmington 6. SITE DESCRIPTION: (A) Local Land Usc Plan - Carteret County Land Classification From LUP - Conservation in the AEC and Community for uplands (B) AEC(s) Involvcd: CS, EW, CW, PT (C) Watcr Dcpcndcnt: Yes (marina and piers) No (upland development) (D) Intcndcd Usc: Commercial/Residential (E) Wastcwatcr Trcatmcnt: Existing - None Planncd - onsite septic and wastewater treatment plant (F) Typc of Structurcs: Existing - One-story house, several small buildings and a bulkhead around the marina basin and access channel. Planncd - A 525-lot residential subdivision (including all amenities and utilities), reconfiguration ofa 75-slip marina, construction of a boat ramp, maintenance dredging within the marina basin, access channel and entrance channel, construction of a retaining wall, stonnwater collection system and three (3) observation piers. (G) Estimatcd Annual Ratc of Erosion: N/ A Sourcc - N/A 7. HABITAT DESCRIPTION: [AREA] DRED~GED fILLED OIHER (A) Vegetated Wetlands 930 sq. ft. ("404" type and coastal) (shaded) (B) Non-Vegetated Wetlands 369,000 sq. [t. 2,480 sq. ft. 32,156 sq. [t. Open water (maintenance (boat ramp) (piers/docks dredging) incorporated) (C) Other 1,089,000 sq. ft. High ground (disturbed) (D) Total Arca Disturbcd: 1,492,636 sq. ft. (34.26 acres) (E) Primary Nurscry Arca: No - Bogue Sound, Yes - Sikes Creek (F) Watcr Classification: SA-ORW (Bogue Sound) and SA (Sikes Creek) Open: No 8. PROJECT SUl.\'IMARY: The applicant is proposing to modify the existing permit by reconfiguring the existing 75-slip marina, redesigning a 500 +/-Iot residential subdivision with amenities and utilities, installing three (3) observation piers, retaining wall and boat ramp. Additionally, the applicant is proposing to perfonn maintenance dredging within the existing boat basin, access canal and entrance channel. Mr. Randy Allen Page Two 9. PROJECT DESCRIPTION: CAMA Major Permit No. 120-88 was issued to Broad Reach Investments, Inc. on 6/29/88, and subsequently modified for development of an upland marina basin, entrance channel and access canal and construction of a subdivision. The permit has also been renewed several times, most recently renewed on 12/20/04. The permit is scheduled to expire on 12/31/06. The applicant, Randy Allen c/o R.A. North Development, Inc., has provided a copy of the contract to purchase agreement and has also requested a permit transfer from Broad Reach Investments, Inc. to Randy Allen c/o R.A. North Development, Inc. The property is comprised of approximately 287 acres of high ground and lies adjacent to Sikes Creek, Sanders Bay and Bogue Sound, off of NC Hwy 24, near Ocean, in Carteret County. The majority of the property consists of high ground, however, there are a few small pockets of"404" type wetlands. Elevation at the site ranges from 5' to 7' above Mean High Water (MHW). The project site is bordered, along Sikes Creek and Bogue Sound, by a continuous strip of"404" type and coastal wetlands (sections vary from 30' -100' in width). High ground vegetation consists primarily of Long Leaf Pines, Live Oaks, Sweet Gums, Cedars, Magnolias, Dogwoods and Red Maples. Understory vegetation includes Wa.x Myrtles, Yaupons, and Red Bays. Transitional species, including: Sea Oxeye (Borrichia frlltescens), Common Reed (Fragmites australis) and Grounsel-bush (Baccharus halimi(olia) are located along the upper edge of the coastal wetlands. High coastal marsh vegetation, including, Black Needle Rush r:Jllnclls roemarianlls), Spike Grass (Distichlis soicata), and Salt Meadow Grass (Soartina patens) complete the transition to the waters edge where Smooth Cordgrass Marsh (Spartina alterniflora) is the predominant species. No Submerged Aquatic Vegetation (SA V) was noted during the on-site visits. The waters of the Bogue Sound, located adjacent to the proposed project area, are classified "SA-OR W" by the Division of Water Quality, and the waters of Sanders/Sikes Creek are classified as "SA". This section of Sanders/Sikes Creek, adjacent to the project site, is designated as a Primary Nursery Area by the Division of Marine Fisheries. According to maps provided by Shellfish Sanitation, the area adjacent to the project site is CLOSED to the harvesting of shellfish. PROPOSED PROJECT: The applicant is proposing to modifY the existing permit by reconfiguring the existing 75-slip marina, redesigning a 500+/--lot subdivision with amenities and utilities, installing three (3) observation piers and a boat ramp. Additionally, the applicant is proposing to perform maintenance dredging within the existing boat basin, access canal and entrance channel. The applicant proposes to develop 525 lots for single-family dwellings, giving a density of 1.83 units per acre. No individual units are proposed as part of the application package. As such, each individual property owner proposing to develop within any AEC would be required to obtain their his/her own individual CAMA permit. Beginning along the northern portion of the property (adjacent to NC Hwy 24) and working south towards Bogue Sound, the applicant proposes the following development: Construction of an entrance drive (Cannonsgate Drive), located in the north central section of the property, a wastewater treatment facility and a boat storage area (both located in the northeast corner of the property). Four wastewater collection ponds and two created nature ponds would also be located along the northern portion of the property. Please note that Cannonsgate Drive would provide access to numerous side streets within the subdivision, however not all of the side streets, drives and/or courts will be discussed in the field investigation report. Please refer to the workplat drawings (sheets CP-3 and CP-7) for a detailed description of the road infrastructure. Mr. Randy Allen Page Three Continuing south, approximately 1,900' from the intersection ofNC Hwy 24 and Cannonsgate Drive, and located outside of the 575' Coastal Shoreline Area of Environmental Concern (AEC), the applicant proposes to remove two sections of the existing bulkhead that is located at the "404" type wetlands road crossing (what is now a dirt road, or what would be developed as Cannonsgate Drive). The applicant proposes to reconstructthe crossing using vinyl sheets capped with 2' x 2' concrete caps. The caps would support two guardrails (located on each side of the Cannonsgate Drive) that would span the entire section of the crossing. As proposed, the existing culvert located beneath the bulkhead section would not be replaced. Heading further south along Cannonsgate Drive, near the center of the property, and located outside-{)fthe 575' Coastal Shoreline Area of Environmental Concern (AEC) , the applicant proposes to construct a community center, or common area. Development activities within this section include: the construction of a clubhouse, parking area, mailroom, tennis court, swimming pool, putting green, croquet lawn, fonnal garden, function lawn, rose garden, carriage drive and drop-off cui-de-sac. Please refer to the workplat drawings (sheets CP-3 and CP-5) for a detailed description of the community center. Just south and east of the community center, the applicant proposes to excavate an area of high ground for the disposal of spoil material excavated from the marina basin, access canal and entrance channel. According to the application, the spoil basin (150' x 280' x 9') would temporarily be used for spoil deposition and would not be available for future dredging events. In addition to the high ground spoil basin, the applicant proposes to excavate two additional nature ponds (one to the east of the spoil basin and one to the west adjacent to the western property line). As proposed, the two ponds would be used for recreation purposes only. The applicant indicates that materials excavated from the proposed wastewater collection ponds, nature ponds and spoil disposal pond would be used for road construction and preparation of the community center. The applicant proposes to construct three (3) community observation piers throughout the property. As indicated in the application package, Pier # 1 (6' x 545') would begin from a common area located between Lots 475 and 476. Pier # I would extend in a southeasterly direction towards Bogue Sound and would tenninate into a 15' x 15' "T-head" platfonn. Pier #2 (6' x 85') would be located along the northeastern property line, between Lots 422 and 423, and would extend into Sikes Creek from a designated common area. Pier #2 would tenninate into a 15' x 15' "T-head" platfonn over the open waters of Sikes Creek. Lastly, Pier #3 (6' x 210') would also be located along the northern property line adjacent to Sikes Creek. Pier #3 would originate from a designated common area, between Lots 403 and 404 and would span in a northerly direction towards the main run of Sikes Creek. Pier #3 would be located entirely over both "404" type and coastal wetlands and would tenninate into a 6' x 6' platfonn. The modification request also includes reconfiguration of the marina basin. Beginning along the northern shoreline, adjacent to the marina basin, the applicant proposes to construct an 8' x 570' concrete sidewalk leading down to another 8' wide walkway (via three separate flights of concrete stairs) that encompasses the entire basin. The two walkways would be separated by the construction of a proposed retaining wall that would also encompass the entire basin. As proposed, both concrete walkways would be located outside of the 30' coastal shoreline buffer. However, the applicant has proposed the construction of two concrete overlooks/plazas within the 30' coastal shoreline buffer (one located on the northern side of the basin and one on the western side). The proposed concrete plaza would give way to the floating docks located within the basin however the proposed concrete overlook would not. Mr. Randy Allen Page Four Other development proposed within the existing basin includes the construction of a concrete boat ramp. The boat ramp (20' x 124') would be located in the southwest comer of the boat basin adjacent to the existing concrete bulkhead. A 20' x 37' concrete pad, bordered by two blocked wing walls, would give way to the ramp. The ramp would measure approximately 87' in length from the edge of the existing bulkheadlNormal High Water (NHW), to the terminal end. The applicant has indicated that fill material (rip-rap and railroad ballast) would need to be placed beneath the proposed ramp to obtain the appropriate slope of 12%. According to the site drawings, the terminal end of the boat ramp would be located approximately -7.0' below Normal Low Water (NL W). As part of this permit modification, the applicant has proposed the reconfiguration of the previously permitted floating dock system within the marina basin. As proposed, the total number of slips located within the marina basin would remain the same as what was originally permitted (75 slips). The floating dock configuration is as follows: Beginningjust north of the proposed boat ramp and extending around the entire basin, the applicant proposes to construct a 10' x 1,480' section of floating dock (main dock) that would give access to the finger piers and dock spines within the basin. One, 8' x 105' finger pier would be located be located along the western wall, adjacent to the boat ramp, for boat launching. Five, 4' x 40' finger piers would also be attached to the main dock, adjacent to the western wall. Two, 10' x 225' dock spines would extend south from the northern wall towards the center of the basin. Ten finger piers (4-5' x 40',5-4' x 50', 1-10' x 40' and 1-10' x 50') would attach to each of the spines. Seven finger piers (4' x 35') and one - 6' x 60' would be constructed to the main dock, adjacent to the eastern wall. Please refer to sheet CP-14 for a detailed description of the proposed dock dimensions and configuration. Lastly, the applicant is proposing to perform maintenance dredging within the existing marina basin, access canal and entrance channel to a depth greater that originally permitted. According to the application and site drawings, approximately 13,500 cu. yds. of material would be excavated using a hydraulic dredge. The boat basin (650' x 500') would be dredged from --6.0' to -7.5' Mean Low Water (ML W). The dredged footprint of the access canal would include a 40' (bottom cut) x 600' area, and final dredged contours would average -9.0' MLW. The entrance channel (40' bottom cut x 500') would be dredged to a depth of -10.5' ML W, or to the depth of the adjoining federally maintained channel. The top cut of the proposed dredging activities within the canal and entrance channel would be cut/tapered at a 4: 1 side slope from the edge of the bottom cut. The proposed dredging activities would remain within the same footprint as originally permitted. Spoil material generated from the dredging activities would be pumped to the proposed spoil disposal site previously discussed. Please refer to sheet CP-20 for a detailed description of the spoil disposal basin and sheets CP-17 thru CP-19 for a detailed description of the proposed dredging activities. 10. ANTICIPATED IMPACTS: Since this proposal is a modification of a previously permitted and partially constructed project, most of the types of impacts that will be referred to herein have been previously authorized. However, the redesigned subdivision and proposed retaining wall construction would disturb approximately 1,089,000 sq. ft. of high ground. As proposed, total impervious coverage calculations for development within the 575' coastal shoreline AEC would be 24.80%, and total impervious coverage calculations for development within the 75' coastal shoreline AEC would be 30.56%. As proposed, no "404" type or coastal wetlands would be filled as part of the project. The proposed pier and platforms would provide access to the marsh and open water and shade approximately 930 sq. ft. of "404" type and coastal wetlands. The proposed piers/platforms and floating docks would incorporate approximately 32,156 sq. ft. of estuarine and public trust waters with 27,506 sq. ft. of the total area located within the man-made basin. As proposed, Pier #2 would exceed the ~ width rule and would need to be relocated approximately 6' landward of its current location The proposed construction of the boat ramp would impact approximately 2,480 sq. ft. of previously disturbed bottom within the man-made basin. The proposed boat basin, access canal and entrance channel maintenance dredging would impact approximately 369,000 sq ft of previously dredged shallow bottom area deepening the basin to -7.5 ML Wand access canal to -9.0' ML W. As proposed, it appears there would be no impacts to SA Vs and open shell fishing waters. Mr. Randy Allen Page Five The applicant has provided a copy of the Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Cannons gate at Bogue Sound. According to the draft Declaration, Article II, Sect 3 1. Piers: Specifically states: "No individual piers will be allowed on any lot located within the Cannonsgate at Bogue Sound Subdivision". Once recorded, the Declaration would limit the amount of public trust usurpation and potential impacts from boat prop-kicking of the valuable PNA habitat within Sikes Creek and Bogue Sound. An Express Low-Density Stonnwater Pennit (SW8050516) was issued by the Division of Water Quality on 6/02/05. Additionally, a Sedimentation and Erosion Control Plan (pennit# Carte-2005-327) has been issued by the Division of Land Resources for land disturbance activities. Submitted by: Jason Dail Date: June 17,2005 Office: Wilmington Form DCM-MP-l APPLICATION (To be completed by all applicants) 1. APPLICANT a. Name Randy Allen c/o ofRA. North Development. Inc. b. City, town, community or landmark White Oak Townshi? c. Street address or secondary road number Address 110 Matthews Station St. Suite 2D NC Highway 24 City Matthews State NC d. Is proposed work within city limits or planning jurisdiction? -X Yes _ No Zip 28105 Day Phone (704) 321-0401 e. Name of body of water near project, e.g., river, creek, Fax 704-321-9823 sound, bay: Bogue Sound and Sikes Creek b. Authorized Agent: Name Lawrence R. Zucchino. ASLA 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Address mavis Architects. PLLC City Raleiah State NC a. List all development activities you proposed, e.g., building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. 525 unit residential subdivision with amenities. (3) waterfront piers. install docks in existing marina. reconstruction of existing bulkhead at permitted wetlands crossing and supporting road and utility systems. 510 Glenwood Avenue. Suite 201 Zip 27603 Day Phone (919) 835-1500 Fax (919) 835-1510 c. Project name (if any) Cannonsgate at Bogue Sound (formerlv Broad Reach and Harhor Bav) b. Is the proposed activity maintenance of an existing project, new work, or both? Both NOTE: Pernlit will be issued in name of Landowner(s), and/or project name. d. c. 2. LOCATION OF PROPOSED PROJECT a. County Carteret Form DCM-MP-l 4. LAND AND \V ATER CHARACTERISTICS a. Size of entire tract 287.35 Acres b. Size of individuallot(s) 40'.50' and 60' widths. depth varies c. Approximate elevation of tract above l'v1HW or NWL average of6' above MHW d. Soil type(s) and texture(s) of tract Sandy loam e. Vegetation on tract Open pasture. farmland and woods f. Man-made features now on tract Single-family residence and farm out buildings. There is also an existing permitted wetlands roadway crossing. g. What is the CAMA Land Use Plan land classifications of the site? (Consult the local land use plan.) Conservation Developed Rural -X- Transitional X Community Other h. How is the tract zoned by local government? C-2 Planned Residential Development 1. Is the proposed project consistent with the applicable zoning? L Yes _No (Attach zoning compliance certificate. if applicable) J. Has a professional archaeological assessment been done for the tract? X Yes No If yes, by whom? NC Dept. of Cultural Resources k. Is the project located in a National Registered Historic District or docs it involve a National Register listed or eligible property? Yes -X-No 1. Are there wetlands on site?-1L Yes No Coastal (marsh) -X- Other 404 Wetlands If yes, has a delineation been conducted? Yes (Attach documentation. if amilable) Revised 03/95 m. Describe existing wastewater treatment facilities. Septic for existing single family residence n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Currently none. Reference development plan for proposed discharges. o. Describe existing drinking water supply source. Well for existing single family residence 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: . A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said properties, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. . An accurate, dated work plat (including plan view and cross-sectional dra ,. gs) drawn to scale in black ink on an 8~q~jb :hI w .te paper. (Refer to Co~~~s ~~s is .on Rule 7J.0203 for a ~tJ~~~PtlOn.) \\) Plcaln~!f'in'l\l~ginal awings are preferred ~nd \~ ~nlyh'i'gn qU~li Cij)~s~\yj.!~accepted. Blu~-hne ~ \.\tlrints8\~t1iPt ~O'QtNrre acceptable only If an ;..-' ade~,~f.-~u of quality copies are provided by r~~i?ant. (Contact the U.S. Army Corps of ,j Engineers regarding the agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to Form DCM-MP-l guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) numbers, landmarks, and the like. . A Stormwater Certification, if one is necessary. . A list of names and complete addresscs of thc adjaccnt watcrfront (riparian) landowncrs and signcd return rcccipts as proof that such owncrs have reccived a copy of thc application and plats by ccrtificd mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. . . . Name Address Phone Eric S. Stroud P.O. Drawer 1550, Raleigh, NC 27602 (919) 832-7385 Name Address Phone Sue Ballard 4019 Hwv. 24 Newport, NC 28570 Name Address Phone . A list of prcvious state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Maior #120-88 NCDWQ Stormwater Certification #890308 X X . A check for $400 made payable to the Department X of Environment, Health, and Natural Resources (DEHNR) to cover the costs of process the X application. . A signed AEC hazard notice for projects in oceanfront and inlet areas. · A statement of compliance with the NC Environmental Policy Act (N.C.G.S. 112A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 6. CERTIFICATION A1~D PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the l6~day of ~ , 2005. Print Name Signature DCM MP-2 DCM MP-3 DCM MP-4 DCM MP-5 DCM MP-6 Excavation and Fill Information Upland Development Structures Information Bridges and Culverts Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. ~iC~:~~~ ~ ~ j\l of "I'I \~ O\\j\~~~"'G\O\'II\O O p..S\ p...\.. G Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Length Width De th De th Access -2.0 -9.0 Channel 500' 40' bottom To To (ML W) or NL W) -9.0 MLW -10.5 MLW -2.0 -7.5 Canal 600' 40' bottom To To -9.0 MLW -9.0 MLW -6.0 Boat 650' 500' To No change Basin -7.5 MLW -7.5 Boat 124' 20' -6.0 MLW At toe of Ramp ramp Rock N/A Groin Rock N/A Breakwater Other N/A (Excluding Shoreline Stablization) 1. EXCAVATION a. Amount of material to be excavated from below MHW orNWL in cubic Yards 13.500 CY b. Type of material to be excavated Sand /mud c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SA Vs) or other wetlands Yes lNo d. High ground excavation in cubic yards Q. 2. DISPOSAL OF EXCAVATED lVIA TERIAL a. Location of disposal area temporary. see plan, pond by clubhouse b. Dimensions of disposal area 150 x 280 x 9 c. Do you claim title to disposal area? --K- Yes No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? Yes --K- No If yes, where? ~c ~ \ll'\ \ 'i 1.'U'U'i j Of 1 O\\I\S\O~p.G~~~N COp...S\p...\.. ~p... Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SA V s or other wetlands? Yes ~No f. Does the disposal include any area in the water? Yes ~No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization None Bulkhead None Riprap b. Length 0 c. Average distance waterward of MHW or NWL N/A d. Maximum distance waterward of MHW or NWL N/A e. Shoreline erosion during preceding 12 months N/ A (Sollrce ofinfonnation) f. Type of bulkhead or riprap material N/A g. Amount offill in cubi yards to be placed below water level (1) Riprap N/A (2) Bulkhead backfill N/ A h. Type of fill material N/ A 1. Source of fill material N/ A 4. OTHER FILL ACTIVITIES (Excluding Shorclinc Stabilization) a. Will fill material be brought to site? l Yes No Revised 03/95 If yes, (I) Amount of material to be placed in the water Approximately 420 CY (2) Dimensions of fill area 40'x87' (3) Purpose offill Establis propser grade for the boat ramp b. Will fill material be placed in coastal wetlands (marsh), SA Vs or other wetlands? Yes X No If yes, (1) Dimensions offill area N/A (2) Purpose of fill N/ A 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Material will be contained with use of berms and silt fence at base of berm. b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Hydraulic cutter head suction dredge for Channel Dredging c. Will wetlands be crossed in transporting equipment to project site? _ Yes --X- No If yes, explain steps that will be taken to lessen environmental impacts. N/ A A~;:~! i>~ ~NVO .n. ?Jui~J Signature- l (J. fo. 06 Dale lijECEfVED Th JUN I 5 2005 IU D\V\S\ON OF COASTAL MANAGEMENT Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-Mp-l. Be sure to complete all other section of the Joint Application that relate to the proposed project. a. Type and number of buildings, facilities, unit or structures proposed 525 Single Family Homes. The basin has 3,050 linear feet of existing retaining wall with the addition of 50 new linear feet to accomodate the boat ramp. b. Number of lots or parcels 525 lots c. Density (give the number of residential units and the units per acre) 1.83 DUlAC d. Size of area to be grades, filled or disturbed including roads, ditches, etc. Approximately 25 AC e. If the proposed project will disturb more than one acres ofland, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? -X-- Yes No If yes, date submitted May 6, 2005 f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. Asphalt/Marl g: Give the percentage of the tract within 75 feet ofMHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or build upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. 24.8"-,,( S, t;)') 3o.b%(",C;I~ h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? -1L-Yes No If yes, date submitted Mav 6,2005 1. Describe proposed method of sewage disposal. Package Plant (Reclaimed Water, permit currentlv in NPDES express review) J. Have the facilities described in Item i. Above received state and local approval? No (Attach appropriate docl/mentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). None 1. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Private Water System m. Will water be impounded? _ Yes -1L- No If yes, how many acres? n. If the project is a oceanfront development, when was the lot(s) platted and recorded? NI A ~r~~1fTfb @ U/40E ~ Applicant or Proj~ame JUN , 5 2005 0 COASP1.t/~/ON OF ANAG'=^"r::~ ,_ Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application, which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _ Commercial "/Community _ Private (2) Number 3 community piers, 1 marina (3) Length Community ?iers - pier#l 545 LF, pier#2 85 LF, ?ier#3 210 LF. 840 Total LF. Marina 2, I 00 LF (4) Width 6' at piers, 10' at marina (5) Finger Piers ~ Yes _ No (i) Number 33 (ii) Length varies 30' to 60' (iii) Width varies 4' to 10' (6) Platforms(s) ~Yes _No (i) Number 3 (ii) Length I(@. 6', 2 @ 15' (iii) Width I(@, 6' ,2 @ IS' See attached sheets CP-14 and CP-16 (7) Number of slips proposed 75 (reconfigured) (8) Proximity of structure to adjacent riparian property lines N/ A (9) Width of water body N/ A (1 0) Water depth at waterward end of pier at ML W or MWL :f: 2' DEEP ML W at piers -6.0 to -7.5 MLW at marina. b. Boathouse (including covered lifts) N/A (I) No Commercial No Private (2) Length N/ A (3) Width N/A c. Groin (e.g., wood, sheetpile, etc.) N/A (I) Number N/A (2) Length(s) N/A d. Breakwater (e.g., wood, sheetpile, etc.) N/A (1) Length N/ A (2) Average distance form MHW, NWL or wetlands N/ A (3) Maximum distance beyond MHW, NWL or wetlands N/ A Revised 03/95 e. Mooring buoys (I) ~ Commercial No Community No Private (2) Number N/A (3) Description of buoy (Color, inscription, size, anchor, etc.) N/A (4) Width of water body N/A (5) Distance buoys(s) to be placed beyond shoreline N/A f. Mooring structure (boatlift, mooring pilings, etc.) (1) No Commercial No Community No Private (2) Number N/A (3) Length N/A (4) Width N/A g. Other (Give complete description) Date :\~~~ ~.~~ ~ ~\ ~ ~~ \ ~ "l) ~ O<(~~<:,.~~ ~ L::J\O ~'t>-0 Q\~'\ ~~ ~ 't>- \, S _0~ Form DCM-MP-6 MARINA DEVELOPMENT (Required for the mooring of more than 10 vessels) Attach this form to Joint Application for CAlHA Mar Permit, For DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this g. Typical boat length 30' to 60' proposed project. h. Maximum boat length 60' 1. MARINA CHARACTERISTICS 1. Are any floating structure planned? Yes If so, describe: Floating Dock System u. Check below the type of marina proposed Commercial Public../ Residential b. Will the marina be open to the general public? Yes ~No 2. MARINA OPERATIONS 525 Lots Planned a. Check each of the following sanitary facilities that will be included in the proposed project. Office toilet _ Toilet for patrons Number Location Showers ~ Boat holding tank pumpout Type and location: Pumpout at slip next to boat ramp c. If there is residential development associated with the marina, how many units or lots are planned and how many are currently developed? d. Check all the types of services to be provided. Full service, including travel lift and lor rail - Dockage, fuel, and marine supplies ---;- Dockage ("wet slips") only Number of slips 75 (reconfigured) _ Dry Storage Number of boats 75 -L Boat Ramp(s) ~ Other (describe) Marina will have water and electric supplied to each slip and a sewage pump out station at the slip adiacent to the boat ramp. b. Describe treatment type and disposal location for all sanitary wastewater. Reclaiming Water Package Plant c. Describe the disposal of solid waste, fish offal and trash disposal. Disposal bv private waste contractor. d. How will overboard discharge of sewage from boats be controlled? Not Allowed e. Check below the proposed type of siting. ../ Land cut and access channel = Open water with dredging for basin and/or channel Open water, no dredging required Other describe e. Give the location and number of "No Sewage Discharge" signs propos at Harbor Entrance and One at Pum Sh . \:~ c \ 'l1.\)\\'i )~~ ~ Of ~~\,\\ ~I\S\O...\~G~ 0\'1 ~~\" S\~\.. CO~ Form DCM-l\IP-6 f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? N/ A h. Give the number of channel markers and "no Wake" signs proposed. None 1. Give the location offuel-handling facilities, and describe the safety measures planned to protect area water quality. None J. Describe design measures that promote boat basin flushing or circulation and that reduce water quality impacts. See Attachment A k. What will the marina policy on overnight and live- board dockage? Not allowed under existing CAMA Permit 1. Is proposed work within city limits or planning jurisdiction? _Yes ~No Ir"yes, give the name and address of the leaseholder. N/A m. If the project is an expansion of an existing marina, what types of services are currently provided? No n. How many slips are now available? 0 Rniscd 03195 o. If the marina proposed within a primary secondary nursery area? _ Yes -...-{ No p. Is the marina proposed within an area open to shellfish harvesting? _ Yes -...-{ No q. Give the location and number of "Pumpout Available" signs proposed. Two (2): (l) at harbor entrance and (l) at pumpout station. ~~c..E ~O() M:f) ~\o. 05'" Date ~~ ~ _v.. ~ ~ ~' cJ# ~ ~ ,'-> ~~~.p ,~ ~~~~ ~ ... Q/.-..~ <0 O~ (j " v <~lVICI<IMI&CREED May 16, 2005 / ~ \CL \,,&\lJ \\~ / ~ M&C 04070.0001 (10) Mr. John Dorney NCDENR Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 ~[g@[gDW[g @ MAY? 4 2005 RE: Cannonsgate at Bogue Sound Wastewater Treatment and Reclaimed Water Utilization System Carteret County DENR. WATER QUALlT" \',:TWlOS NID STORMWATER BRAiiCIi Dear Mr. Dorney: Thank you and Sam for meeting with Tim Baldwin, Ed Andrews and me yesterday at your office to discuss the Cannonsgate project. We sincerely appreciate your willingness to provide your input and recommendations on this project. Following is a brief summary of our meeting, which identifies your concerns as well as your recommendations for minimizing potential impacts to existing wetlands in the area: 1. McKim & Creed provided a brief overview of the project and explained the MBR treatment process, the use of (4) reclaimed water infiltration basins, the operation of the proposed groundwater control system, and groundwater discharge/dispersal system. 2. After several questions and clarifications, you indicated that you had two concerns relative to compliance with 15A NCAC 2B.0231(b)(5). These concerns included: 1. Potential inundation of the existing wetland located south of Infiltration Basin #4. This wetland has no outlet and the proposed roadway will further prevent the system from overflowing during wet weather. II. The use of the artificial wetland for dissipating the discharge from the groundwater control pumping station does not adequately disperse the flow to the natural wetland. As such the 350 gpm flow into the system could negatively impact the hydrology of the wetland. 3. You then provided your recommendations for avoiding these potential negative impacts. These recommendations are as follows: S:\4070\OOO1\10-Comm\S-1S-QS Domey letter. doc 200 MACKENAN COURT, CARY, NORTH CAROLINA 27511 TEL 919.233.8091 FAX 919.233.8031 www.mckimcroed.com AAOC02667 Mr. John Dorney May 19,2005 Page 2 1. Install a culvert under the new roadway to connect the two wetlands located south of infiltration basin #4. The culvert invert should be set to maintain the existing water level in the wetland while providing an overflow in the event water level increases as a result of the infiltration basins. You also would like the Owner to install a surface swale or culvert to allow overflow from the smaller wetland to flow overland to the large natural wetland adjacent to Sikes Creek. 11. Eliminate the proposed natural wetland/dispersion structure. Instead, install a forcemain parallel with the east side of the existing wetland in the buffer zone between the wetland and Infiltration Basin #1 (approximately 400 linear feet). This forcemain should have sufficient sprinkler heads to accommodate the required 350 gpm groundwater dispersal into the wetland. We have discussed your concerns and recommendations with Nathaniel Thornburg of the NCDENR Non-Discharge Section. Unless you object, Nathaniel will issue the Non-discharge .Permit as it currently stands, with the understanding that we will be immediately submitting the revised drawings to his office along with a permit modification application to address the modifications you have suggested. Thanks again for your assistance on this project. Sincerely, It Kevin C. Eberle, PE Senior Project Manager cc: Tim Bald win, PE Rand y Allen Nathaniel Thornburg, NCDENR 5:\4070\0001\ 1 0-CommlS-15-<J5 Domey Leller.doc 4 .$ IVICI<IIVl& CREED