Loading...
HomeMy WebLinkAboutNCC190716_ESC Plan with Notes_20190625/ / / / / WL�— — — \ WL — WL —sWL— C 1 E S_ \ APPROVED EQUAL (3:1 E l \ \ \ / � / 2 \ 011 I, I SLOT ES, 1' EPTH) I _ (� 1z v / ` csol ND SILT \ / I TR TO RE SF � / / h I ENCE (TYP.) \ \ / (SEE GRADING PL N n / / /\11 CK \� X/ n (TY ) \ y� PJENTILLCKIO ATION / �qL I \ \ CHECK DA n (TYPI csot 501 SILT FENCE OUTLET DA=0.04 AC ROVIDE 160 CF SEDIMENT STORAGE TEMPO1��/ RY V-SHAPED DIVERSION DITCH n \ V CITY \ LIN WITH ROLLMAX C125 EROSION csot \ ILL Cso X5' // 2ONTR NKET OR APPROVE'% EQUAL. DIS AT 1 'THICKS\ / \ RI P N GEOTE (3:1 E SLOPES, 1' DEPTH n 1 \ SILT FENCE OU ET 3 DA=0.06 AC C501 S E BAS N: n PROVIDE 220CF B LEV -3�2. // ~ SEDIMENT STORAG EXCAV T4 1 4TO 3ff0. l� \ I\ FOR 2' DIAhENT $ /ORAGDE m BAFFF csat SKIMMER W 7 SKIMMER SHOULD REST csol AT ELEV 382.0 / W wp cso L X 5'W VELOCITY ® / ® T 5� clot SILT FENCE OUTLET 48 LF 30" 0RCP PSP @ 0.63% DISSIPATO 18" THICK CLASS ^ C A=0.06 AC B' RIPR ON GEOTE _^ / \_ -� PROVIDE 220 CF S wU jc� (J94,�� LL SEDIMENT STORAGE RIPRAP AT PIPE OUTLET 7 TONS CLASS T t pt SX5 TRASH RACK ' c / 1 EROSION CONTROL PLAN - INITIAL 17SYGEOTEXT (SEE NCDOT STANDARD � LL C500 1 =60, DETAIL876.02) P JGF SF TPFF LD TPF . S LID + 0 30 60 120 ZPF I 3 3 3 3 S / N 01 SILT FENCE OUTLET clot SIL NCE OUTLET 501 SILT FENCE OUTLET / csot SILT FEN UTLET 3 A .14 AC A=0.24 AC DA=0.24 AC A=0.24 AC t SILT FENCE OUTLET SILT FENCE OUTLET csot — — iG DA=0.09 AC 510 CF PROVIDE 0 C PROVIDE 870 PROVID�SZD Cl=� DA=0.24 AC SCALE: 1" = 60 — — — KNNM&+T 6F0 SEDIMENT ST RAGE SED ENT STORAGE PROVIDE 870 CF / / / / PIN: 0749-04-63-7563 PIN: 0749-04-63-9550 PIN: 0749-04-73-1550 PI t-117317 -r PID�;i7,316 PID: 157315 ' PB , PG IS PID 163791 I 0749-04-73-7760 4303 LUMLEY RD PULTE HOME CC DB 8390, PG 176 PB 176, PG 87 n i 1 OT P.) START SILT FENCE C501 �� \ (TYP.)/ \ N 9 TEMP ARY V-SH PED START THE 4 I \ -n n Csot DIVERSI N DITCH LIN^ ITH PROTECTION csot �� �� \ R LLMAX C125 EROSIO I ^ ^ I \ FENCE \ C�NTROL LANKET OR / / / / / L � - AUN I'F C IN TRENO RE (SEE GRADING PL4IN 1 _ PINCHED\ RON PIPE , 1� Q I \ IR IN PI El ON FIR NE C NEf SILT FENCE OUN DA=0.06 AC PROVIDE 220CF SEDIMENT STOR7 SKIMMER WITH 4" ORII SKIMMER SHOULD RE: AT ELEV 382.0 48 LF 30" 0 RCP PSP @ RIPRAP AT PIPE OUTLET 7 TONS CLASS 'I' 17 SY GEOTEXT (SEE NCDOT STANDARD DETAIL 876.02) SILT FENCE OUTLET- DA=0.09 AC PROVIDE 660 CF SEDIMENT STORAGE SEDIMENT STORAGE SEDIMENT STORAGE SEDIMEN I STORAGE SJD V ENT STORAGE-— SILT FENCE OUTLET DA=0.04 AC PROVIDE 160 CF SEDIMENT STORAGE SILT FENCE OUTLET DA=0.06 AC SEDIMENT STORAGE -RON PIPE ON LINE, SILT FENCE OUTLETNER DA=0.24 AC �NCHED IRON PIPE PROVIDE 870 CF 0.3' SOUTH OF LINE SEDIMENT STORAGE 211390, PG 176 PB 8R PG )5 PIN: 0749-04-73-2322 PID: 157314 NOTE: SILT FENCE TO BE INSTALLED WITHIN 6 INCHES OF THE TREE PROTECTIO FENCE EROSION CONTROL LEGEND DESCRIPTION SYMBOL DETAIL GRAVEL CONSTRUCTION ENTRANCE csol e SILT FENCE —sF—sF— z csot SILT FENCE OUTLETFm 3 csol TREE PROTECTION FENCE —TPF—TPF — csol e INLET PROTECTION ® s csol SEDIMENT BASIN 6 csot SKIMMER ® 7 csot COIR BAFFLE a C501 TEMPORARY DIVERSION DITCH CCC clot CHECK DAM ® o csol RIP RAP VELOCITY DISSIPATOR csol CONCRETE WASHOUT ® 2 C501 TRASH RACK a s C501 HORVATH A S S O C I A T E S CIVIL ENGINEERING LAND PLANNING LANDSCAPE ARCHITECTURE STORMWATER MANAGEMENT 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com z LJJ LJJ o � o O O 0 z Q moo= J U LU z G J=z Q o N QQ "t 0 o Q EROSION CONTROL PLAN j�TI `NEE ��. • • ♦♦♦♦♦ 6 DRAWN BY: CHECKED BY: LGC MJ/TS DATE 01/07/2019 SCALE AS NOTED PROJECT NO. 1840 2-\�EROSION CONTROL PLAN -FINAL C500) 1 „=60' 0 30 60 120 SCALE: 1" = 60 ©COPYRIGHT 2018 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED SHEET NO. C500 <EROSION CONTROL> SEDIMENTATION AND EROSION CONTROL PLAN CONSTRUCTION SEQUENCE ENFORCEMENT NOTE 1: FAILURE TO EXPLICITLY FOLLOW THIS CONSTRUCTION SEQUENCE MAY RESULT IN 16. THE SLOPES OF ANY DISTURBED AREAS SHALL BE NO STEEPER THAN SLOPES THAT CAN BE RETAINED BY LOCAL ENFORMEENT ACTIONS, INCLUDING BUT NOT LIMITED TO CIVIL PENALTIES OF $5000 PER VIOLATION VEGETATED COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. PER DAY, INJUNCTIVE RELIEF, CRIMINAL PENALTIES, AND PERMIT REVOCATION. ADDITIONALLY, OFF -SITE DISTURBED AREAS SHALL BE STABILIZED ACCORDING TO THE NATURE OF THEIR DISTURBANCE AS SEDIMENTATION MAY RESULT IN RESTORATION REQUIREMENTS. BEYOND THESE LOCAL ENFORCEMENT OUTLINED BELOW: REMEDIES, VIOLATION OF PLAN REQUIREMENTS IS SUBJECT TO ENFORCEMENT BY THE NCDENR AND USEPA. ONGOING ACTIVITY: LAND LEFT EXPOSED SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION ENFORCEMENT NOTE 2: IF THE DURHAM COUNTY S&E STAFF DETERMINE EXCESSIVE SEDIMENT MAY BE WITHIN THE APPLICABLE TIME PERIOD AFTER COMPLETION OF ANY GRADING OR PERIOD OF LEAVING THE SITE BASED UPON EITHER OFF -SITE SEDIMENTATION, EXCESSIVE TURBIDITY IN THE DISCHARGE, INACTIVITY AS FOLLOWS: SEVEN DAYS FOR ANY SLOPES STEEPER THAN 3:1 HORIZONTAL TO OR ANY POTENTIAL RISK FACTORS, A REVISED SEDIMENTATION AND EROSION CONTROL PLAN MAY BE VERTICAL; TEN DAYS FOR ANY SLOPES FLATTER THAN 3:1 HORIZONTAL TO VERTICAL. REQUIRED, WITH ASSOCIATED REQUIREMENTS FOR ADDITIONAL S&E MEASURES. COMPLETED ACTIVITY: FOR ANY AREA OF LAND DISTURBANCE WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO ENFORCEMENT NOTE 3: IF THE LAND DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICABLE, BUT IN NO CASE LATER ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL BE CONSIDERED SEPARATE LAND -DISTURBING THAN SEVEN DAYS AFTER COMPLETION OF GRADING. ACTIVITIES AND MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION CONTROL ACT AS A 17• IF FLOCCULANTS ARE USED SUBMIT A SOIL SAMPLE (FROM THE SUBSOIL IN THE AREA TO BE GRADED) ONE -USE BORROW SITE OR THROUGH THE MINING ACT. TO APS, 519 INDUSTRIAL DRIVE, WOODSTOCK, GA 30189 IN ACCORDANCE WITH THEIR PROCEDURES AS DESCRIBED ON THEIR WEBSITE, WWW.SILTSTOP.COM. PLACE A COPY OF THEIR INITIAL MEASURES, CLEARING, GRUBBING AND GRADING. RECOMMENDATION IN THE INSPECTION NOTEBOOK. THE ONLY FLOCCULANTS THAT MAY BE USED ARE LISTED ON THE FOLLOWING WEBSITE: HTTP://H20.ENR.STATE.NC.US/WS/PAMS_LIST.HTM. 1. OBTAIN AN APPROVED EROSION CONTROL PLAN. THIS PLAN WILL BE STAMPED ON THE LOWER LEFT FLOCCULANTS MAY ONLY BE USED AS PRESCRIBED ON THE WEBSITE, AND MAY NOT BE USED UNLESS CORNER OF THE COVER SHEET, "APPROVED - DURHAM COUNTY EROSION CONTROL" WITH AN USED BEFORE A SEDIMENT TRAP OR BASIN. IMPROPER USE OF FLOCCULANTS MAY RESULT IN APPROVAL DATE. ENFORCEMENT ACTIONS AND RESTORATION REQUIREMENTS BY EITHER THE LOCAL, STATE OR 2. OBTAIN ALL OTHER REQUIRED FEDERAL, STATE, AND LOCAL APPROVALS AND PERMITS, INCLUDING FEDERAL AUTHORITIES. FLOCCULANT LOG LABELS MUST BE RETAINED AND STORED IN THE S&E DURHAM CITY OR DURHAM COUNTY INFRASTRUCTURE CONSTRUCTION DRAWING APPROVALS INSPECTION BOX. PRIOR TO INFRASTRUCTURE INSTALLATION. 18. IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE 3. INSTALL TREE PROTECTION FENCING IN ACCORDANCE WITH THE APPROVED EROSION CONTROL ALREADY HAS A LAND -DISTURBANCE PERMIT. PLAN AND APPROVED SITE PLAN. 4. INSPECT TREE FENCE AND SUBMIT A"TREE PROTECTION FENCING CERTIFICATION" FORM TO DURHAM COUNTY S & E OFFICE, FAX: (919)560-0740. THE FORM CAN BE FOUND AT: http://www.durhamcountync.gov/departments/ceng/Documents/PDF/Tree_ Protection_Form.pdf INFRASTRUCTURE INSTALLATION 5. INSTALL S&E INSPECTION BOX. PLACE APPROVED S&E PLAN, NPDES NCG010000 PERMIT, AND 19. INSTALL REMAINING STORMWATER PIPING AND OTHER UNDERGROUND UTILITIES. ENSURE ALL INSPECTION NOTEBOOK IN THE BOX. INSTALL THE RAIN GAUGE ON THE BACK OF THE POST HOLDING STORMWATER INLETS ARE PROTECTED PRIOR TO RAIN EVENTS AND AT THE END OF EACH WORK DAY. THE S&E INSPECTION BOX. S&E INSPECTIONS ARE REQUIRED AT LEAST WEEKLY AND AFTER EACH 20. ENSURE ALL STORMWATER PIPING VELOCITY DISSIPATER PADS ARE INSTALLED IMMEDIATELY RAINFALL. THE S&E INSPECTIONS SHALL BE RECORDED AND MAINTAINED IN THE INSPECTION FOLLOWING INSTALLATION OF A DISCHARGING SECTION OF PIPE. NOTEBOOK. IF A SEDIMENTATION AND EROSION CONTROL MEASURE HAS FAILED, REPAIR 21 • AT THE CONCLUSION OF THIS INSTALLATION, PERMANENT GROUNDCOVER IN ACCORDANCE WITH IMMEDIATELY AND CONTACT THE DURHAM COUNTY S&E OFFICE BY PHONE WITHIN 24 HOURS, AND THE SEEDING SCHEDULE IN THE S&E PLAN MUST BE PROVIDED, ALL SEED TAGS MUST BE RETAINED IN IN WRITING WITHIN 5 DAYS. RECORDS OF THESE NOTIFICATIONS MUST BE MADE AND MAINTAINED IN THE INSPECTION BOX. THE INSPECTION NOTEBOOK. IT IS STRONGLY RECOMMENDED THAT THE S&E MEASURES BE 22. AFTERR P PERMANENT COVER IS ESTABLISHED, THE CONTRACTOR SHALL SUBMIT A CERTIFICATE OF S&E INSPECTED EVERY WORKDAY. COMPLETION TO THE DURHAM COUNTY S&E OFFICE, FAX NUMBER (919)560-0740. 6. SCHEDULE AND HOLD A PRE -CONSTRUCTION CONFERENCE PRIOR TO BEGINNING ANY 23. AFTER THE DURHAM COUNTY S&E OFFICE APPROVES THE PERMANENT STABILIZATION, REMOVE ALL LAND -DISTURBING ACTIVITIES. THIS CONFERENCE SHOULD BE ATTENDED BY A REPRESENTATIVE OF SEDIMENTATION EROSION CONTROL MEASURES AND INSTALL VEGETATIVE COVER IN THESE AREAS THE FINANCIALLY RESPONSIBLE PARTY, THE GENERAL CONTRACTOR, GRADING SUB -CONTRACTOR, IMMEDIATELY. IF A RE -INSPECTION IS NECESSARY DUE TO INCOMPLETE OR INCORRECT PERMANENT MEASURES, THE PROJECT IS SUBJECT TO RE -INSPECTION FEES AND ENFORCEMENT ACTION EROSION CONTROL SUB -CONTRACTOR, AND THE DURHAM COUNTY S&E OFFICE. CONTACT THE DURHAM COUNTY S&E OFFICE (919) 560-0735 TO ENSURE REPRESENTATION BY THE TECHNICIAN FOR THAT PROJECT. 7. OBTAIN LAND -DISTURBING PERMIT, AND POST THE PERMIT IN THE S&E INSPECTION BOX. 8. INSTALL SILT FENCES, PERIMETER BMP'S AND OTHER INITIAL EROSION CONTROL MEASURES AS SPECIFIED ON THE PLAN. REMOVE ONLY TREES AND GROUND COVER NECESSARY TO INSTALL THESE DEVICES. 9. BEGIN INSTALLATION OF SEDIMENT BASIN USING EXCAVATED MATERIAL IN FILL FOR INSTALLATION OF CONSTRUCTION EGRESS/EXIT AT EITHER OR BOTH OF THE OPTIONAL LOCATIONS SHOWN ON THE EROSION CONTROL PLAN. 10. INSTALL ALL EROSION CONTROL MEASURES PRIOR TO THE REMOVAL OF ANY ADDITIONAL TREES OR GROUND COVER. STABILIZE THE INLETS INTO THE SKIMMER BASIN AS SPECIFIED ON THE PLAN. 11. COMPLETE CLEARING AND GRUBBING REMAINDER OF SITE 12. PROVIDE TEMPORARY GROUNDCOVER IN THE SEDIMENT TRAPS/BASINS WITHIN 3 DAYS OF COMPLETING EXCAVATION. 13. BEGIN CLEARING, GRUBBING AND GRADING OF SITE IN ACCORDANCE WITH THE APPROVED S&E PLAN. 14. PROVIDE ALL DISTURBED AREAS WITH TEMPORARY GROUND COVER ACCORDING TO THE STABILIZATION SCHEDULE ON C501. SLOPES STEEPER THAN 3:1 7 DAYS SLOPES 3:1 OR FLATTER 10 DAYS ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS PERMANENT GROUND COVER UPON COMPLETION OF GRADING 7 DAYS THE SEEDING, SEEDBED PREPARATION, MULCH AND ROLLED EROSION CONTROL PRODUCT INSTALLATION MUST BE IN ACCORDANCE WITH THE SEEDING SCHEDULE PROVIDED IN THIS S&E PLAN. SEED TAGS FROM ALL SEEDING OPERATIONS MUST BE RETAINED AND PLACED IN THE INSPECTION BOX. 15. CONTRACTOR IS RESPONSIBLE FOR SELF -INSPECTIONS PER 15A NCAC 04B.0131. INSPECTIONS SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING PHASES OF THE PLAN: A. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES B. CLEARING AND GRUBBING OF EXISTING GROUND COVER C. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS THAT REQUIRES PROVISION OF TEMPORARY OR PERMANENT GROUND COVER PURSUANT TO G.S. 1 13A-57(2) D. COMPLETION OF STORM DRAINAGE FACILITIES E. COMPLETION OF CONSTRUCTION OR DEVELOPMENT; AND F. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION OR UNTIL THE FINANCIALLY RESPONSIBLE PARTY HAS CONVEYED OWNERSHIP OR CONTROL OF THE TRACT OF LAND FOR WHICH THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED AND THE AGENCY THAT APPROVED THE PLAN HAS BEEN NOTIFIED. IF THE FINANCIALLY RESPONSIBLE PARTY HAS CONVEYED OWNERSHIP OR CONTROL OF THE TRACT OF LAND FOR WHICH THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED, THE NEW OWNER OR PERSON IN CONTROL SHALL CONDUCT AND DOCUMENT INSPECTIONS QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. STABILIZATION TIMEFRAMES IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND -DISTURBANCE PERMIT. NOTIFICATION OF COMBINED SELF -MONITORING & SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, NCDEQ DWR AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE DURHAM COUNTY EROSION CONTROL AT (919)-560-0735. SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS OPERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES PIN: 0749-04-63-7563 PIN: 0749-04-63-9550 PIN: 0749-04-73-1550 PIN: 0749-04-73-2322 PID: 157317 �PID: 157316 �PID: 157315 �PID: 157314 PERMANENT SEEDING SCHEDULE FOR SHOULDERS, SIDE DITCHES & SLOPES (MAX 2:1 DATE TYPE PLANTING RATE AUG 15-NOV1 CREEPING RED FESCUE 300 #/AC NOV 1-MAR 1 CREEPING RED FESCUE 300 #/AC AND ABRUZZI RYE 25 #/AC MAR 1-APR 15 CREEPING RED FESCUE 300 #/AC APR 15-JUN 30 HULLED COMMON BERMUDA GRASS 25 #/AC JUL 15-AUG 15 RED FESCUE 120 #/AC AND BROWNTOP MILLET 35 #/AC OR SORGHUM-SUDAN HYBRIDS 30 #/AC FOR SLOPES (3:1 TO 2:1 MAR1-JUN1 CREEPING RED FESCUE 50#/AC (APR 15-MAY 30) OR ADD LITTLE BLUESTEM 10/12#/AC (MAR 1-JUNE 30) OR ADD HULLED COMMON BERMUDA GRASS 25 #/AC JUN 1-SEPT 1 ***CREEPING RED FESCUE AND 120 #/AC ***BROWNTOP MILLET 35 #/AC ***OR SORGHUM-SUDAN HYBRIDS 30 #/AC SEPT 1-MAR 1 CREEPING RED FESCUE 120 #/AC (NOV 1-MAR 1) ADD ABRUZZI RYE 25 #/AC CONSULT CONSERVATION ENGINEER OR SCS FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. TEMPORARY -RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12' IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. TEMPORARY SEEDING SCHEDULE FOR SHOULDERS, SIDE DITCHES & SLOPES (MAX 2:1 DATE TYPE PLANTING RATE AUG 15-NOV1 TALL FESCUE 300 #/AC NOV 1-MAR 1 TALL FESCUE 300 #/AC AND ABRUZZI RYE 25 #/AC MAR 1-APR 15 TALL FESCUE 300 #/AC APR 15-JUN 30 HULLED COMMON BERMUDA GRASS 25 #/AC JUL 15-AUG 15 TALL FESCUE 300 #/AC AND BROWNTOP MILLET 35 #/AC OR SORGHUM-SUDAN HYBRIDS 30 #/AC FOR SLOPES (3:1 TO 2:11 MARL-JUNI TALL FESCUE 120#/AC (MAR 1-JUNE 30) OR ADD WEEPING LOVEGRASS 10 #/AC (MAR 1-JUNE 30) OR ADD HULLED COMMON BERMUDA GRASS 25 #/AC JUN 1-SEPT 1 ***TALL FESCUE AND 120 #/AC ***BROWNTOP MILLET 35 #/AC ***OR SORGHUM-SUDAN HYBRIDS 30 #/AC SEPT 1-MAR 1 TALL FESCUE 120 #/AC (NOV 1-MAR 1) ADD ABRUZZI RYE 25 #/AC CONSULT CONSERVATION ENGINEER OR SCS FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY -RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. SEED BED PREPARATION A) CHISEL COMPACTED AREA AND SPREAD TOPSOIL 3" DEEP OVER ADVERSE SOIL CONDITIONS. B) RIP THE ENTIRE AREA TO A 4" DEPTH. C) REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. D) APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE *BELOW) E) CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 5" TO 6" DEEP. F) SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. G) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. H) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 1) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. * APPLY: AGRICULTURAL LIMESTONE: 2T/AC (3 TON IN CLAY) FERTILIZER: 10-10-10 AT 800-1000#/AC SUPERPHOSPHATE: 500#/AC OF 20%ANALYSIS SUPERPHOSPATE MULCH: 2 TON(80 BALES) SM. GRAIN STRAW/ACRE ANCHOR: LIQUID ASPHALT 400 GAL/AC EMULSIFIED ASPHALT 300 GAL/AC HSG'D'SOILS LIMITS OF DISTURBANCE = 6.8 AC (295,000 SF) AREA STABILIZED BY VEGETATION = 3.27 AC (142,441 SF) HORVATH ASSOCIATE S CIVIL ENGINEERING LAND PLANNING LANDSCAPE ARCHITECTURE STORMWATER MANAGEMENT 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com N z W W ono O O O �D0 �O= Q J U I-_ N W zD 2 Q 0 Z J = a N N�= � D Q O � o SITE NOTES DRAWN BY: CHECKED BY: LGC MJ/TS DATE 01/07/2019 SCALE AS NOTED PROJECT NO. 1840 SHEET NO. C502 ©COPYRIGHT 2018 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, PA ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED <EROSION CONTROL>