Loading...
HomeMy WebLinkAbout710018_Plan of Action_20190129Co �dt`k D000� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS710018 County: Pender Facility, Name: Bull Tail 1 & 2 (Sow) Certified Operator Name: Alton Mobley Operator Number:' 25259 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without'spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 2677 2680 Spillway(Y or N): N N Level(inches): 17.5 24 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30,day, Plans of Action' are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste Is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and -secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: As Conditions Permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy -Brown, LLC/David Nordin Phone: (910) 293-3434 Fa ility wn /Manager (print)Date: 1 /29/2019 Facility Owner/Manager (signature) IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YI2./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2677 line m = 489.6 lb PAN 2. Structure ID: 2680 line m = 2477.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN s 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + g = 2966.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED nuRIMr.: THIS M nAV PFRIAII o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD(lbs.) column r x s u. application window' 141 H43 Wheat 24.99 17.38 434.3 Sept -Apr 141 H47 Wheat 17.92 98.56 1766.2 Sept -Apr 141 H48 Wheat 17.97 98.97 1778.5 Sept -Apr ,5tate current crop enamg application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) : 3979.0 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2966.9 lb. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section III) = 3979.0 lb. PAN y. Overall PAN balance (w - x) _ -1012 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action• here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 12677 2. Current liquid volume in 25 yr,/24 hr. storm storage & structural freeboard a. current liquid level according to marker F 17.5 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.9 inches c. line b - line a (inches in red zone) = 2.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) F 312076 ft2 e. line c/12 x line d x 7.48 gallons/ft3 470756 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 161 days g. volume of waste produced according to structural design ft3 h. current herd # certified herd #� actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design Oft3 k. (lines h + i + j) x 7.48 x 30 days/line f= gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/20/2018 1.04 1 lbs/1000 gal. m. ((lines e + k)/1000) x line I = 489.6 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 A 19, PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1.- Structure Name/Identifier (ID): 12680 2. Current liquid volume in 25 yr.124 hr, storm storage & structural'freeboard a. current liquid level according to marker 24.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.9 inches c. line b - line a (inches in red zone) _ -4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 251616 ftz e. line c/12 x line d x 7.48 gallons/W-639910 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 161 days g. volume of waste produced according to structural -design 727509 ft3 h. current herd # 7692 certified herd # 7692 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I, current waste analysis dated f 12/20/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE: (Click on the next Structure tab shown below)' PoA (30 Day) 2/21100 727509 ft' 480133 ft3 182044 ft3 1936929 gallons 1.91 Ibs/1000 gal. 2477.3 Ibs. PAN