Loading...
HomeMy WebLinkAbout710084_Plan of Action_20190122-�xd / -22- - M v -71 - gz/- PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-84 County: Pender Facility Name: K&P Certified Operator Name: Kenneth Brown Operator Number: 17176 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top'of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 3 N N N 10 8 8 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures_ A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included'within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Kenneth Brown Phone: 910-296-3093 Facility Owner/Manager (print) _P-c n( Date: Facility Owner/ anage ignature). 1A_ 1/21 /2018 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Lagoon 1 line I = 67067 gallons 2. structure ID: Lagoon 2 line' I = 75643 gallons 3. structure ID: Lagoon 3 line I = 676473 gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n.lines 1+2+3+4+5+6= o. line n 127154 = 1 819183 gallons 30.17 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' .2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance I(in/hr) (Iblacre) v. maximum application rate w. maximum application amount (inches) 1 GoA Small Grain 14.00 100 0.5 .5-1.0 2 GoA Wheat 11.00 55 0.5 .5-1.0 x. total acres available during 5 day draw down (sum of column t) = 25.00 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE ,LAND APPLIED PER ACRE y� line o = 1.21 inches per acre to be applied within 5 days PoA (� Day) 2/2'1100- i line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: ,tribe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar gown in rieia; --irarncamity - across sous will soils absorb application without runoff, etc. s and amount of last rainfall event? DATE: 12/14/18 AMOUNT: I inches 3. uates of last waste application event per field: 4. Given optimum soil and weather conditions, is irrigation equipment capable of applyinq the volume in line n ai l I n schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed cnan es PoA (5 Day) 2/21/00 rates and amounts; a for consideration. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker 10.0 inches b designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47250 ft2 e. line c/12 x line d x 7.48 gallons/ft3 58905 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 46887.7 ft3 h. current herd # F 1600 certified herd # 6400 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 11722 ft° ©ft3 27562.5 ft3 8162 gallons 67067 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 2 2. Current liquid volume in structural freeboard a. current liquid level according to marker 8.0 inches b. designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 28000 ft2 e. line c/l2 x line d x 7.48 gallonsW 69813 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design F 180 days g. volume of waste produced according to structural design 23443.9 ft3 h. current herd # 16001 certified herd # 3200 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 11722 ft' 0 ft3 16333.3 ft3 5829 gallons 75643 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 3 2. Current liquid volume in structural freeboard a_ current liquid level according to marker 8.0 inches b. designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 270000 ft2 e. line c/12 x line d x 7.48 gallons/ft° 673200 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 23443.91 ft3 h current herd # �1, certified herd # 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = ft3 ft3 15750 ft3 3273 gallons 676473 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121/00